← Back
Two family brick
4 PATCHIN PLACE
MANHATTAN · BIN 1010568
💬 Discuss this project
1848Year Built
3Stories
B1Building Class
R6Zoning
2,160 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family brick · Owner of record: OR PATCHIN PLACE, LLC · 1,421 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction24p · 2 filings · 20 docs
Floor 2Under Construction24p · 2 filings · 20 docs
Floor 1Under Construction21p · 2 filings · 20 docs
CellarUnder Construction27p · 3 filings · 20 docs
1 job · most recent 06/18/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2025——Air Conditioning Systems
Cooling
Lg LG LMU480HV 8 tons · Vrf Outdoor ×2
1 job · most recent 09/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/29/2025Permit IssuedI DO PLUMBING & HTG INCGas, Water/Sanitary
1 job · most recent 03/10/2025
General Wiring
FiledStatusContractorScope
03/10/2025Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
2 jobs · most recent 09/08/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/08/2025Permit IssuedHONEST & QUALITY CORPSteel, Concrete, Masonry
08/11/2025——1 scope_items
Building Lifecycle
All (80)Filed (8)Permit Issued (4)Violation (2)Inspection (6)Objection (60)
08/14/2026
Permit issued — Plumbing
M01171626-I1-PL
04/17/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
04/06/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
03/11/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/04/2026
Permit issued — General Construction
M01143770-I1-GC
01/28/2026
Violation issued (ECB, open)
Construction
11/18/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/29/2025
Filed — Alteration
File plumbing job to remove existing plumbing fixtures, and associated pipes and accessories
M01171626-P2
09/08/2025
Filed — Alteration
FILE MINOR RENOVATION FOR THE STURUCTURAL WORK TO INSTALL EXTERIOR WINDOWS, ETC
M01143770-S2
08/29/2025
Objection raised — Admin
08/25/2025
Objection raised — Scope
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2025
Filed — Alteration
FILE MINOR RENOVATION FOR THE STURUCTURAL WORK TO INSTALL EXTERIOR WINDOWS, ETC
M01265337-I1
08/01/2025
Filed — Alteration
File plumbing job to remove existing plumbing fixtures, and associated pipes and accessories
M01171626-P1
07/09/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Admin
06/18/2025
Filed — Alteration
File mechanical alteration work of subsequent filing for apartment renovation to install HVAC split system, no change of use, egress, or occupancy
M01242940-I1
06/11/2025
Objection raised — Fire_Protection
06/02/2025
Objection resolved — Addressed
06/02/2025
Objection resolved — Addressed
06/02/2025
Objection resolved — Addressed
06/02/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Admin
05/22/2025
Objection raised — Structural
05/22/2025
Objection raised — Zoning
05/22/2025
Objection raised — Zoning
05/22/2025
Objection raised — Zoning
05/15/2025
Filed — Alteration
FILE MINOR RENOVATION FOR THE STURUCTURAL WORK TO INSTALL EXTERIOR WINDOWS, ETC
M01143770-P1
03/19/2025
Permit issued — Plumbing
M01171626-I1-PL
02/11/2025
Objection raised — Cost
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
02/03/2025
Objection raised — Plumbing
02/03/2025
Objection raised — Plumbing
02/03/2025
Objection raised — Plumbing
02/03/2025
Objection raised — Plumbing
02/03/2025
Objection raised — Inspections
02/03/2025
Objection raised — Plumbing
02/03/2025
Objection raised — Plumbing
02/03/2025
Objection raised — Plumbing
01/26/2025
Filed — Alteration
File plumbing job to remove existing plumbing fixtures, and associated pipes and accessories
M01171626-I1
01/17/2025
Permit issued — General Construction
M01143770-I1-GC
01/08/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/19/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Fire_Protection
12/11/2024
Objection resolved — Addressed
Latest 60 of 80 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX2 DESIGN CONSULTING409/29/2025
KWHC CONSULTING ENGINEER PLLC109/08/2025
SEAD ENGINEERING, PC108/11/2025
READ ARCHITECTURE DESIGN DPC205/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JX2 DESIGN CONSULTING203/21/2026
J. CALLAHAN CONSULTING, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HONEST & QUALITY CORPGeneral Contractor207/08/2026
AVON PLBG & HTG INCPlumbing106/28/2026
I DO PLUMBING & HTG INCPlumbing108/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNFOLD ARCHITECT7707609/29/2025
SEAD ENGINEERING PC2665205/15/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedI DO PLUMBING & HTG INC08/14/2026
DOB NOWGeneral ConstructionPermit IssuedHONEST QUALITY02/04/2026
DOB NOWPlumbingPermit IssuedAVON PLBG & HTG INC03/19/2025
DOB NOWGeneral ConstructionPermit IssuedHONEST QUALITY01/17/2025
BISOTISSUEDNY MAINTENANCE CORP03/22/2017
BISPLISSUEDMYRTO PLUMBING & HVAC COR08/05/2016
BISMHISSUEDNY MAINTENANCE CORP07/12/2016
BISOTISSUEDNY MAINTENANCE CORP07/07/2016
BISOTISSUEDVEMA CONTRATCING09/21/2004
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/17/2026Fail-Final Construction Permit WithdrawalFailView ↗
04/06/2026Fail-Final Construction Permit WithdrawalFailView ↗
03/11/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/18/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/23/2025Energy Code Compliance InspectionsJINHO KIMprogress
10/23/2025Fire-Resistant Penetrations and JointsJINHO KIMspecial
09/29/2025Fire-Resistant Penetrations and JointsJINHO KIMspecial
09/29/2025Energy Code Compliance InspectionsJINHO KIMprogress
09/08/2025Masonry—special
09/06/2025Structural Steel - High Strength Bolting—special
09/06/2025Concrete - Cast-In-Place—special
09/06/2025Structural Steel - Welding—special
09/05/2025Structural Steel - Details—special
09/05/2025Structural Stability – Alterations of existing buildings—special
09/05/2025Final—progress
08/11/2025Structural Steel - Details—special
08/01/2025Final—progress
08/01/2025Energy Code Compliance InspectionsJINHO KIMprogress
08/01/2025Structural Steel - Welding—special
08/01/2025Concrete - Cast-In-Place—special
08/01/2025Masonry—special
08/01/2025Structural Steel - High Strength Bolting—special
08/01/2025Structural Stability – Alterations of existing buildings—special
08/01/2025Fire-Resistant Penetrations and JointsJINHO KIMspecial
07/11/2025Fire-Resistant Penetrations and JointsJINHO KIMspecial
07/11/2025Fire-Resistance Rated ConstructionCome Menageprogress
07/11/2025Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
07/11/2025FinalCome Menageprogress
06/17/2025Fire-Resistant Penetrations and JointsJINHO KIMspecial
Latest 25 of 31.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026M01143770-S2Request digital key ↗
08/23/2026M01143770-P1Request digital key ↗
08/23/2026M01143770-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit8
08/21/2026M01171626-I1Open ↗
08/21/2026M01171626-P1Open ↗
08/13/2026M01143770-P1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
03/31/2017140514272Open ↗
08/10/2016140514272Open ↗
07/12/2016140514272Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
03/31/2017140514272Open ↗
03/27/2017140514272Open ↗
06/27/2016140514272Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026M01242940-I1Open ↗
09/29/2026M01242940-I1Open ↗
09/29/2026M01143770-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026M01242940-I1Open ↗
09/29/2026M01143770-P1Open ↗
09/29/2026M01143770-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026M01143770-P1Open ↗
08/23/2026M01143770-I1Open ↗
08/23/2026M01143770-S2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/27/2016140514272Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2016140514272Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/04/2019140514272Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2016140514272Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/27/2016140514272Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/27/2016140514272Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026M01143770-I1Open ↗
08/23/2026M01143770-S2Open ↗
08/23/2026M01143770-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/27/2016140514272Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/04/2019140514272Open ↗
03/31/2017140514272Open ↗
03/31/2017140514272Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/12/2016140514272Open ↗
06/27/2016140514272Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/04/2019140514272Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/27/2016140514272Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/12/2016140514272Open ↗
06/27/2016140514272Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/08/2019140514272Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL1
01/08/2019140514272Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/08/2019140514272Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/08/2019140514272Open ↗
06/27/2016140514272Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
03/31/2017140514272Open ↗
01/24/2017140514272Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2016140514272Open ↗
▸BISBOROUGH INTAKE FORM1
01/08/2019140514272Open ↗
▸Other Documents3
▸DOB NOWProof of Historic Building3
08/13/2026M01143770-I1Open ↗
08/13/2026M01143770-P1Open ↗
08/13/2026M01242940-I1Open ↗