← Back
Five to six families
32 BANK STREET
MANHATTAN · BIN 1010954
💬 Discuss this project
1845Year Built
3Stories
C2Building Class
R6Zoning
3,570 sfGross Floor Area
5Units
Rent Stabilized13 Open Violations ▸
Five to six families · Owner of record: 32 BELERIAND LLC · 1,814 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction38p · 1 filing · 20 docs
Floor 2Under Construction42p · 1 filing · 20 docs
Floor 1Under Construction37p · 1 filing · 20 docs
CellarUnder Construction41p · 1 filing · 20 docs
BasementUnder Construction38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
32 BELERIAND1907/08/2026
KINGS GROUP NY507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2021$10.2M—32 BANK STREET LIMITED PARTNERSHIP → 32 BELERIAND LLC$2,857/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS109/23/2025
E4P CONSULTING ENGINEERING PLLC305/20/2025
MARIN CONSULTING ENGINEER PLLC105/12/2025
FUTURE MADE ARCHITECTURE, PLLC106/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMA DESIGNS LLC203/21/2026
GAMILL ENGINEERING, PC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOTI GROUP CORPGeneral Contractor404/09/2026
PRECISION SPKLR SVCS LLCFire Protection207/08/2026
KINGS GROUP NY CORPGeneral Contractor207/08/2026
ADRIATIC PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429505/20/2025
Building Lifecycle
All (104)Filed (6)Permit Issued (8)Signed Off (1)Violation (17)Inspection (8)Objection (34)Special Inspection (30)
05/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/04/2026
Permit issued — Sprinklers
M01059018-S3-EW-SP
05/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2026
Permit issued — Plumbing
M01059018-S2-PL
03/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2026
Permit issued — Sprinklers
M01059018-S3-EW-SP
01/12/2026
Permit issued — Foundation
M01059018-S1-GC-CX
01/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2025
Signed off — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01290032-I1
12/19/2025
Permit issued — General Construction
M01059018-I1-GC
12/16/2025
Permit issued — General Construction
M01059018-I1-GC
11/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/17/2025
Violation issued (HPD, open)
I
09/24/2025
Permit issued — Supported Scaffold
M01290032-I1-SH
09/24/2025
Permit issued — Sidewalk Shed
M01290032-I1-SF
09/23/2025
Filed — Alteration
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01290032-I1
09/17/2025
Objection resolved — Addressed
09/15/2025
Special inspection requirement — Shutoff dampers
Jeffrey Stones
09/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
Jeffrey Stones
09/09/2025
Special inspection requirement — Fireplaces
Jeffrey Stones
08/27/2025
Special inspection requirement — Permanent certificate
Jeffrey Stones
08/21/2025
Objection resolved — Addressed
08/19/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
08/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
08/01/2025
Special inspection requirement — Maintenance information
Jeffrey Stones
08/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
08/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Plumbing
06/23/2025
Objection raised — Plumbing
06/23/2025
Objection raised — Plumbing
06/23/2025
Objection raised — Plumbing
06/23/2025
Objection raised — Plumbing
06/23/2025
Objection raised — Plumbing
06/13/2025
Objection raised — Cost
06/13/2025
Objection raised — Mechanical
06/13/2025
Objection raised — Inspections
06/13/2025
Objection raised — Mechanical
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
06/13/2025
Special inspection requirement — Post-installed Anchors
Jeffrey Stones
06/12/2025
Objection resolved — Addressed
06/04/2025
Violation issued (HPD, open)
A
06/03/2025
Objection resolved — Addressed
06/02/2025
Objection raised — Structural
06/02/2025
Objection raised — Scope
06/02/2025
Objection raised — Scope
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPRECISION SPKLR SVCS LLC05/04/2026
DOB NOWPlumbingPermit IssuedADRIATIC PLBG & HTG CORP04/24/2026
DOB NOWSprinklersPermit IssuedPRECISION SPKLR SVCS LLC02/11/2026
DOB NOWFoundationPermit IssuedHOTI GROUP01/12/2026
DOB NOWGeneral ConstructionPermit IssuedHOTI GROUP12/19/2025
DOB NOWGeneral ConstructionPermit IssuedHOTI GROUP12/16/2025
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/24/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/24/2025
1 project · most recent 05/20/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2025Permit IssuedHOTI GROUP CORPAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM36NAMHZ-U1 36,000 BTU · Condensing Unit ×3
MUZ-FS15NAH-U1 14,000 BTU · Condensing Unit ×2
PVFY-P18NAMU-E1 18,000 BTU · Vrf Indoor ×2
MSZ-FS15NA-U1 14,000 BTU · Fan Coil Indoor ×1
PEFY-P08NMAU-E4 8,000 BTU · Vrf Indoor ×1
PEFY-P18NMAU-E5 18,000 BTU · Vrf Indoor ×1
PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×1
PVFY-P08NAMU-E1 8,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck CSP-A700-VG 600 CFM · Kitchen Exhaust ×2
Panasonic FV-05111VKS2 100 CFM · Exhaust Fan
1 project · most recent 05/20/2025
Sprinkler System
FiledStatusContractorScope
05/20/2025Permit IssuedPRECISION SPKLR SVCS LLCSprinkler System
1 project · most recent 05/20/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2025Permit IssuedADRIATIC PLBG & HTG CORPGas, Storm, Water/Sanitary
2 projects · most recent 09/24/2025
FiledStatusContractorScope
09/24/2025CompleteHIGH QUALITY ELEC.OF NYC—
07/07/2025Permit IssuedSAFETECH ELECL CONTNG COR—
1 project · most recent 05/20/2025
Steel Masonry Wood
FiledStatusContractorScope
05/20/2025Permit IssuedPRECISION SPKLR SVCS LLCSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/19/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/15/2025Shutoff dampersJeffrey Stonesenergy_progress
09/15/2025Duct leakage testing, insulation and designJeffrey Stonesenergy_progress
09/09/2025FireplacesJeffrey Stonesenergy_progress
08/27/2025Permanent certificateJeffrey Stonesenergy_progress
08/06/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
08/01/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
08/01/2025Maintenance informationJeffrey Stonesenergy_progress
08/01/2025HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
08/01/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
06/13/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
06/13/2025Post-installed AnchorsJeffrey Stonesspecial
05/19/2025Maintenance informationJeffrey Stonesenergy_progress
05/09/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
05/09/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
05/09/2025HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
05/08/2025Post-installed AnchorsJeffrey Stonesspecial
05/08/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
05/07/2025Sprinkler SystemsJeffrey Stonesspecial
05/07/2025Mechanical SystemsJeffrey Stonesspecial
05/07/2025FinalJeffrey Stonesprogress
05/05/2025Structural Steel - High Strength BoltingJeffrey Stonesspecial
05/05/2025Structural Steel - DetailsJeffrey Stonesspecial
05/05/2025Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
05/05/2025Post-installed AnchorsJeffrey Stonesspecial
05/05/2025MasonryJeffrey Stonesspecial
Latest 25 of 30.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026M01059018-S2Request digital key ↗
08/23/2026M01059018-I1Request digital key ↗
08/23/2026M01059018-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026M01059018-I1Open ↗
08/13/2026M01059018-S1Open ↗
08/13/2026M01059018-S2Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01059018-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01059018-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026M01059018-I1Open ↗
08/23/2026M01059018-S1Open ↗
08/23/2026M01059018-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M01059018-S2Open ↗
08/31/2026M01059018-S1Open ↗
08/24/2026M01059018-S4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M01059018-S3Open ↗
09/02/2026M01059018-S2Open ↗
08/31/2026M01059018-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M01059018-I1Open ↗
08/13/2026M01059018-S1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/23/2026M01059018-S4Open ↗
08/23/2026M01059018-S3Open ↗
08/23/2026M01059018-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M01059018-S1Open ↗
08/13/2026M01059018-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026M01059018-S1Open ↗
08/13/2026M01059018-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026M01059018-S1Open ↗
08/13/2026M01059018-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026M01059018-I1Open ↗