← Back
Church, synagogue, chapel
St. John’s Church
81 CHRISTOPHER STREET · Name © OpenStreetMap contributors · BIN 1011170
💬 Discuss this project
1822Year Built
3Stories
M1Building Class
R6Zoning
4,250 sfGross Floor Area
1Units
0 Open Violations
Church, synagogue, chapel · 6,595 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Mezzanine1p · 1 filing · 3 docs
Cellar1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING507/08/2026
GUL & G CONTRACTING INC503/22/2026
ST JOHNS GERMAN CHURCH203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION211/08/2024
JBA105/03/2023
SYED ENGINEERING, P.C.204/14/2021
ASHRAF CORP109/04/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING403/21/2026
KC EXPEDITING203/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
GUL & G CONTRACTING INCGeneral Contractor303/21/2026
INTECH CONSTRUCTION INCGeneral Contractor203/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
TRISTAR PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355211/08/2024
NEW AGE ENGINEERING PLLC7746105/03/2023
Building Lifecycle
All (28)Filed (6)Permit Issued (5)Signed Off (3)Violation (3)Inspection (3)Special Inspection (8)
09/05/2025
Signed off — Alteration
REGISTER TWO (2) FURNACES AT CELLAR LEVEL
M01054437-I1
01/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2024
Filed — Alteration
REGISTER TWO (2) FURNACES AT CELLAR LEVEL
M01054437-P1
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
11/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
11/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
11/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
11/07/2024
Special inspection requirement — Maintenance information
Steven Bendoraitis
11/06/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/05/2024
Permit issued — Plumbing
M01054437-I1-PL
05/31/2024
Filed — Alteration
REGISTER TWO (2) FURNACES AT CELLAR LEVEL
M01054437-I1
05/02/2024
Permit issued — Mechanical Systems
M00857624-I1-MS
05/03/2023
Filed — Alteration
FILING TO SHOW MECHANICAL SYSTEMS WORK AS PER PLANS
M00857624-I1
08/16/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00501639-I1
08/16/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00503718-I1
04/15/2021
Permit issued — Sidewalk Shed
M00501639-I1-SH
04/15/2021
Permit issued — Supported Scaffold
M00503718-I1-SF
04/14/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00501639-I1
04/14/2021
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDING INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00503718-I1
04/14/2021
Special inspection requirement — Final
RAFI HAMID
04/11/2021
Special inspection requirement — Final
RAFI HAMID
09/04/2019
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00216969-I1
09/04/2019
Permit issued — Sidewalk Shed
M00216969-I1-SH
04/08/2016
Violation issued (ECB, closed)
Boilers
09/03/1998
Violation issued (ECB, closed)
Construction
08/07/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTRISTAR PLUMBING & HTG IN09/05/2024
DOB NOWMechanical SystemsSigned-offINTECH CONSTRUCTION05/02/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING04/15/2021
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING04/15/2021
DOB NOWSidewalk ShedPermit IssuedGUL & G CONTRACTING INC09/04/2019
1 project · most recent 05/03/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/03/2023Signed-offINTECH CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU36RLXB 34,000 BTU · Condensing Unit ×4
2 projects · most recent 05/01/2024
General Wiring
FiledStatusContractorScope
05/01/2024CompleteBERGER QUALITY ELEC'L CONGeneral Wiring
09/06/2019Permit IssuedWCK ELECTRIC CORP.—
1 project · most recent 09/04/2019
Sidewalk Shed
FiledStatusContractorScope
09/04/2019Permit IssuedGUL & G CONTRACTING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/07/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
11/07/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
11/07/2024HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
11/07/2024HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
11/07/2024HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
11/07/2024Maintenance informationSteven Bendoraitisenergy_progress
04/14/2021FinalRAFI HAMIDprogress
04/11/2021FinalRAFI HAMIDprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/03/2026M00501639-I1Request digital key ↗
09/03/2026M00503718-I1Request digital key ↗
08/31/2026M00857624-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00216969-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M01054437-P1Open ↗
08/13/2026M01054437-I1Open ↗
08/13/2026M00857624-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature7
09/05/2026M00501639-I1Open ↗
08/25/2026M00503718-I1Open ↗
08/23/2026M01054437-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00503718-I1Open ↗
08/31/2026M00857624-I1Open ↗
08/27/2026M01054437-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M01054437-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026M01054437-P1Open ↗
08/27/2026M01054437-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
09/03/2026M00503718-I1Open ↗
08/13/2026M01054437-I1Open ↗
08/13/2026M01054437-P1Open ↗
Showing 3 of 4 on file for this type