← Back
Walk-up cooperative
10 BETHUNE STREET
MANHATTAN · BIN 1011376
💬 Discuss this project
1896Year Built
5Stories
C6Building Class
C1-6Zoning
6,990 sfGross Floor Area
15Units
Rent Stabilized4 Open Violations ▸
Walk-up cooperative · Owner of record: 8-10 BETHUNE/791 GREENWICH STREET · 1,497 sf lot · 4.67 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 6 docs
Floor 34p · 2 filings · 14 docs
Floor 2
Floor 1
1 job · most recent 08/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-FX12NL 13,200 BTU · Fan Coil Indoor ×2
MXZ-3D24NL 30,600 BTU · Condensing Unit ×1
3 jobs · most recent 11/01/2022
General Wiring Lighting
FiledStatusContractorScope
11/01/2022CompletePK ELECTRIC INCGeneral Wiring
04/20/2022CompleteARC POWER ELECL CONTS INCGeneral Wiring
03/11/2021CompleteTIMOTHY COLEMAN LICENSEDLighting
Building Lifecycle
All (57)Filed (5)Permit Issued (7)Signed Off (3)Violation (16)Inspection (4)Objection (2)Special Inspection (20)
09/01/2026
Objection raised — Scope
09/01/2026
Objection resolved — Addressed
08/26/2026
Filed — Alteration
INSTALLATION OF VOLUNTARY SPLIT-SYSTEM HEAT PUMP (2 INDOOR UNIT, 1 OUTDOOR UNIT) W/ ALL-ELECTRIC DRYER EXHAUST DUCT TO ROOF SERVING APT 4AB. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
M01438790-I1
08/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
David Sivin
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
David Sivin
08/21/2026
Special inspection requirement — Maintenance information
David Sivin
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
David Sivin
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
David Sivin
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Sivin
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
David Sivin
07/30/2026
Special inspection requirement — Mechanical Systems
David Sivin
07/30/2026
Special inspection requirement — Final
David Sivin
10/13/2025
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01105538-I1
09/03/2024
Special inspection requirement — Final
TONY ONYEAGORO
09/03/2024
Special inspection requirement — Masonry
TONY ONYEAGORO
09/03/2024
Special inspection requirement — Post-installed Anchors
TONY ONYEAGORO
09/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TONY ONYEAGORO
09/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
11/15/2023
Violation issued (HPD, closed)
I
08/16/2023
Signed off — Alteration
REPLACE 1080 GALLON FUEL OIL TANK WITH TWO 275 GALLON FUEL OIL TANKS. ALL WORK IS IN THE CELLAR/INTERIOR TO THE BUILDING.
M00696139-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/11/2022
Signed off — Alteration
3BC: Plumbing work in relation to apartment combination as per plans filed herewith.
M00776162-I1
10/11/2022
Signed off — Alteration
3B&3C Apartment Combination as per plans filed herewith. No change to use, egress or occupancy.
M00774954-I1
10/04/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/04/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2022
Permit issued — Boiler Equipment
M00696139-I1-BE
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2022
Permit issued — Plumbing
M00776162-I1-PL
09/03/2022
Permit issued — General Construction
M00774954-I1-GC
08/05/2022
Permit issued — General Construction
M00774954-I1-GC
07/25/2022
Filed — Alteration
3BC: Plumbing work in relation to apartment combination as per plans filed herewith.
M00776162-I1
07/25/2022
Filed — Alteration
3B&3C Apartment Combination as per plans filed herewith. No change to use, egress or occupancy.
M00774954-I1
07/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
07/16/2022
Special inspection requirement — Energy Code Compliance Inspections
James Bartholomew
07/16/2022
Special inspection requirement — Lighting controls
James Bartholomew
07/16/2022
Special inspection requirement — Lighting in dwelling units
James Bartholomew
07/14/2022
Special inspection requirement — Final
James Bartholomew
05/28/2022
Permit issued — Boiler Equipment
M00696139-I1-BE
05/06/2022
Permit issued — Boiler Equipment
M00696139-I1-BE
03/30/2022
Permit issued — Boiler Equipment
M00696139-I1-BE
03/17/2022
Filed — Alteration
REPLACE 1080 GALLON FUEL OIL TANK WITH TWO 275 GALLON FUEL OIL TANKS. ALL WORK IS IN THE CELLAR/INTERIOR TO THE BUILDING.
M00696139-I1
03/10/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
10/05/2018
Violation issued (HPD, closed)
I
10/10/2015
Violation issued (HPD, closed)
B
12/02/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/21/2010
Violation issued (ECB, closed)
Construction
01/21/2009
Violation issued (ECB, closed)
Cranes and Derricks
12/31/2008
Violation issued (ECB, closed)
Unknown
12/31/2008
Violation issued (ECB, closed)
Unknown
12/31/2008
Violation issued (ECB, closed)
Construction
07/20/2007
Violation issued (ECB, closed)
Construction
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERITAS PROPERTY MANAGEMENT1108/28/2026
8-10 BETHUNE 791 GREENWICH ST703/22/2026
POLER CONTRACTING303/22/2026
POLAR CONTRACTING203/22/2026
PHOENIX 132 SUTTON STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING208/26/2026
JAMES BARTHOLOMEW207/25/2022
NEW YORK ENGINEERING ASSOC., P.C.103/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NORTHEAST EXPEDITING203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAND RESTORATION CORPGeneral Contractor207/08/2026
PETER PANTELICElectrical103/21/2026
COCHRANE PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034110/13/2025
RICHARD H. BALSER ENGINEE3028207/25/2022
NEW YORK ENGINEERING ASSO851103/17/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC09/29/2022
DOB NOWPlumbingSigned-offCOCHRANE PLBG & HTG09/09/2022
DOB NOWGeneral ConstructionSigned-offMAND RESTORATION CORP09/03/2022
DOB NOWGeneral ConstructionSigned-offMAND RESTORATION CORP08/05/2022
DOB NOWBoiler EquipmentSigned-offDOUGLAS SIMMONS05/28/2022
DOB NOWBoiler EquipmentSigned-offDOUGLAS SIMMONS05/06/2022
DOB NOWBoiler EquipmentSigned-offDOUGLAS SIMMONS03/30/2022
BISPLISSUEDCLOVERDALE MASTER P&H INC03/21/2016
BISOTISSUEDDOMA INC03/17/2016
BISEQISSUEDPHEONIX 132 SUTTON STREET12/08/2008
BISBLISSUEDA&C HEATING SERVICES INC11/16/2005
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM10/03/2003
BISOTISSUEDJ. KANE CONTRACTING CORP07/26/2001
BISOTISSUEDWOJIEK CONTRACTINGCO. LTD08/05/1998
BISPLISSUEDSTILLSON PLMG & HTG08/05/1998
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/17/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/04/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
08/21/2026Tenant Protection Plan ComplianceDavid Sivinspecial
08/21/2026HVAC-R and service water heating equipmentDavid Sivinenergy_progress
08/21/2026Maintenance informationDavid Sivinenergy_progress
08/21/2026HVAC-R and service water piping design and insulationDavid Sivinenergy_progress
08/21/2026HVAC-R and service water heating system controlsDavid Sivinenergy_progress
08/06/2026Fire-Resistant Penetrations and JointsDavid Sivinspecial
08/06/2026Energy Code Compliance InspectionsDavid Sivinprogress
07/30/2026Mechanical SystemsDavid Sivinspecial
07/30/2026FinalDavid Sivinprogress
09/03/2024FinalTONY ONYEAGOROprogress
09/03/2024MasonryTONY ONYEAGOROspecial
09/03/2024Post-installed AnchorsTONY ONYEAGOROspecial
09/03/2024Structural Stability – Alterations of existing buildingsTONY ONYEAGOROspecial
09/03/2024Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
07/16/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
07/16/2022Energy Code Compliance InspectionsJames Bartholomewprogress
07/16/2022Lighting controlsJames Bartholomewenergy_progress
07/16/2022Lighting in dwelling unitsJames Bartholomewenergy_progress
07/14/2022FinalJames Bartholomewprogress
03/10/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026M00696139-I1Request digital key ↗
09/02/2026M00776162-I1Request digital key ↗
09/02/2026M00774954-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit4
08/27/2026M01438790-I1Open ↗
08/13/2026M01105538-I1Open ↗
08/13/2026M00774954-I1Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
04/05/2016122658891Open ↗
03/29/2016122658891Open ↗
12/08/2008110404394Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
02/29/2016122658891Open ↗
12/05/2008110404394Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M01438790-I1Open ↗
09/23/2026M01438790-I1Open ↗
08/29/2026M01105538-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00696139-I1Open ↗
08/27/2026M01438790-I1Open ↗
08/21/2026M01105538-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01438790-I1Open ↗
09/23/2026M00696139-I1Open ↗
08/29/2026M01105538-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/10/2016122658891Open ↗
02/29/2016122658891Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/05/2008110404394Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/05/2008110404394Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/29/2016122658891Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00696139-I1Open ↗
08/27/2026M01438790-I1Open ↗
08/21/2026M01105538-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/05/2008110404394Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/29/2016122658891Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/10/2016122658891Open ↗
02/29/2016122658891Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/10/2016122658891Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00774954-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
12/05/2008110404394Open ↗
▸BISLANDMARKS APPROVAL1
05/10/2016122658891Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/10/2016122658891Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/10/2016122658891Open ↗
02/29/2016122658891Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
02/29/2016122658891Open ↗
02/29/2016122658891Open ↗
▸BISEFILING COVER SHEET2
02/29/2016122658891Open ↗
12/05/2008110404394Open ↗
▸Other Documents1
▸BISDepartment of Consumer Affairs (DCA) Form1
03/29/2016122658891Open ↗