| Owner | Filings | Most Recent |
|---|---|---|
| PROSKAUER | 13 | 09/16/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 02/01/2016 | $6.7M | — | — → — | $1,395/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| BENDIX ENGINEERING, P.C. | 3 | 04/02/2026 |
| OLD STRUCTURES ENGINEERING | 1 | 03/13/2026 |
| BILOW ENGINEERING, LLC | 2 | 02/23/2026 |
| KUSHNER STUDIOS | 1 | 12/15/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| KUSHNER STUDIOS | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SILVERLINING INTERIORS | General Contractor | 5 | 09/16/2026 |
| KG SPRINKLER CORP | Fire Protection | 1 | 08/06/2026 |
| DONATO PLUMBING, INC | Plumbing | 1 | 07/25/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CROSSCHECK INSPECTION SER | 544 | 7 | 04/02/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | SILVERLINING INTERIORS | 09/15/2026 |
| DOB NOW | General Construction | Permit Issued | SILVERLINING INTERIORS | 08/27/2026 |
| DOB NOW | Foundation | Permit Issued | SILVERLINING INTERIORS | 08/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG SPRINKLER CORP | 08/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SILVERLINING INTERIORS | 08/03/2026 |
| DOB NOW | General Construction | Permit Issued | SILVERLINING INTERIORS | 07/30/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 07/23/2026 |
| BIS | OT | ISSUED | OUT OF SQUARE DESIGNS LLC | 01/04/2019 |
| BIS | OT | ISSUED | OUT OF SQUARE DESIGNS LLC | 01/04/2019 |
| BIS | MH | ISSUED | OUT OF SQUARE DESIGNS LLC | 01/04/2019 |
| BIS | PL | ISSUED | ALADDIN PLUMBING CORP | 03/02/2018 |
| BIS | MH | ISSUED | OUT OF SQUARE DESIGNS LLC | 02/23/2018 |
| BIS | OT | ISSUED | OUT OF SQUARE DESIGNS LLC | 02/23/2018 |
| BIS | OT | ISSUED | OUT OF SQUARE DESIGNS LLC | 02/23/2018 |
| BIS | MH | ISSUED | DONNELLY MECHANICAL CORP | 07/10/2014 |
| BIS | — | ISSUED | EDSON CONSTRUCTION CORP. | 12/16/1994 |
| BIS | PL | ISSUED | WALTER J.GRANDE P & H INC | 06/15/1993 |
| BIS | — | ISSUED | EDSON CONSTRUCTION CORP. | 05/24/1993 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/02/2026 | Permit Issued | SILVERLINING INTERIORS | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×1 Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2026 | Permit Issued | KG SPRINKLER CORP | 63 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | Permit Issued | EINSTEIN ELEC'L CORP | General Wiring |
| 05/07/2026 | Permit Issued | EINSTEIN ELEC'L CORP | — |
| 03/26/2018 | Complete | MIDLAND ELEC'L CO., INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2026 | Permit Issued | SILVERLINING INTERIORS | Steel, Concrete, Masonry |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/05/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/05/2026 | Excavations - Sheeting, Shoring, and Bracing | EUGENE BIFULCO | special |
| 04/05/2026 | Structural Steel - Details | EUGENE BIFULCO | special |
| 04/05/2026 | Structural Steel - High Strength Bolting | EUGENE BIFULCO | special |
| 04/05/2026 | Structural Steel - Welding | EUGENE BIFULCO | special |
| 04/05/2026 | Subgrade Inspections | EUGENE BIFULCO | special |
| 04/05/2026 | Subsurface Conditions – Fill Placement & In-Place Density | EUGENE BIFULCO | special |
| 04/05/2026 | Underpinning | EUGENE BIFULCO | special |
| 04/05/2026 | Footing and Foundation | EUGENE BIFULCO | progress |
| 04/05/2026 | Preliminary | EUGENE BIFULCO | progress |
| 04/05/2026 | Concrete - Cast-In-Place | EUGENE BIFULCO | special |
| 04/02/2026 | Subsurface Investigations (Borings/Test Pits) | JONATHAN BILOW | special |
| 02/08/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 02/08/2026 | Structural Steel - High Strength Bolting | EUGENE BIFULCO | special |
| 02/08/2026 | Concrete - Cast-In-Place | EUGENE BIFULCO | special |
| 02/08/2026 | Structural Steel - Welding | EUGENE BIFULCO | special |
| 02/08/2026 | Subsurface Conditions – Fill Placement & In-Place Density | EUGENE BIFULCO | special |
| 02/08/2026 | Subgrade Inspections | EUGENE BIFULCO | special |
| 02/08/2026 | Masonry | EUGENE BIFULCO | special |
| 02/08/2026 | Construction Operations Influencing Adjacent Structures | EUGENE BIFULCO | special |
| 02/07/2026 | Structural Steel - Welding | EUGENE BIFULCO | special |
| 02/07/2026 | Structural Stability – Alterations of existing buildings | EUGENE BIFULCO | special |
| 02/07/2026 | Concrete - Cast-In-Place | EUGENE BIFULCO | special |
| 02/07/2026 | Excavations - Sheeting, Shoring, and Bracing | EUGENE BIFULCO | special |
| 02/07/2026 | Structural Steel - Details | EUGENE BIFULCO | special |
| 02/07/2026 | Structural Steel - High Strength Bolting | EUGENE BIFULCO | special |