← Back
Old law tenement
113 PERRY STREET
MANHATTAN · BIN 1011887
💬 Discuss this project
1905Year Built
6Stories
C4Building Class
C1-6Zoning
15,660 sfGross Floor Area
19Units
Rent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸
Old law tenement · Owner of record: 115 PERRY STREET, LLC · 2,530 sf lot · 6.19 FAR built · Flood zone X
Locations of Work
Architecture
Floor 63p · 1 filing · 12 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
1 job · most recent 04/18/2024
Gas Water/Sanitary
FiledStatusContractorScope
04/18/2024Signed-offHT PLUMBING & HEATING CORGas, Water/Sanitary
2 jobs · most recent 03/27/2026
General Wiring
FiledStatusContractorScope
03/27/2026Permit IssuedSOLAS ELECTRICAL CORP—
11/23/2024Permit IssuedREDGRAVE ELECTL MAINTNCEGeneral Wiring
1 job · most recent 04/07/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/07/2026——Scaffold, Sidewalk Shed
Building Lifecycle
All (76)Filed (5)Permit Issued (2)Violation (60)Inspection (3)Objection (2)Special Inspection (4)
04/29/2026
Violation issued (HPD, open)
A
04/07/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
M01380029-I1
01/13/2025
Violation issued (HPD, open)
C
01/13/2025
Violation issued (HPD, open)
C
12/30/2024
Violation issued (ECB, open)
Boilers
07/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2024
Filed — Alteration
INTER. RENOV. ONLY: REMOVAL OF GWB, FLR, CLG & WALL FINS. & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINS., INSTALL REPLACEMENT LIGHT FIXTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08012470-P1
04/18/2024
Filed — Alteration
PLUMBING APPLICATION TO REMOVE ALL EXISTING PLUMBING FIXTURES AND INSTALL NEW FIXTURES AS SHOWN IN PLANS FILED HEREWITH.
M08012516-P1
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
11/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/08/2023
Special inspection requirement — Final
ALEKSANDR LEVIN
11/03/2023
Permit issued — Plumbing
M08012516-I1-PL
09/20/2023
Permit issued — General Construction
M08012470-I1-GC
06/23/2023
Objection resolved — Addressed
06/16/2023
Objection raised — Scope
06/07/2023
Filed — Alteration
INTER. RENOV. ONLY: REMOVAL OF GWB, FLR, CLG & WALL FINS. & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINS., INSTALL REPLACEMENT LIGHT FIXTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08012470-I1
06/06/2023
Filed — Alteration
PLUMBING APPLICATION TO REMOVE ALL EXISTING PLUMBING FIXTURES AND INSTALL NEW FIXTURES AS SHOWN IN PLANS FILED HEREWITH.
M08012516-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
02/18/2020
Violation issued (HPD, closed)
C
10/29/2019
Violation issued (HPD, closed)
A
05/30/2018
Violation issued (HPD, closed)
B
04/19/2018
Violation issued (HPD, open)
A
04/19/2018
Violation issued (HPD, open)
A
04/19/2018
Violation issued (HPD, open)
A
01/16/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2016
Violation issued (HPD, closed)
I
06/27/2013
Violation issued (HPD, closed)
A
06/27/2013
Violation issued (HPD, closed)
A
06/27/2013
Violation issued (HPD, closed)
B
06/27/2013
Violation issued (HPD, closed)
A
06/27/2013
Violation issued (HPD, closed)
A
09/29/2009
Violation issued (HPD, closed)
B
11/12/2007
Violation issued (HPD, closed)
B
11/12/2007
Violation issued (HPD, closed)
B
11/12/2007
Violation issued (HPD, closed)
B
09/20/2007
Violation issued (HPD, closed)
B
09/20/2007
Violation issued (HPD, closed)
A
09/20/2007
Violation issued (HPD, closed)
A
09/20/2007
Violation issued (HPD, closed)
A
09/20/2007
Violation issued (HPD, closed)
B
09/20/2007
Violation issued (HPD, closed)
A
08/16/2007
Violation issued (HPD, closed)
C
08/16/2007
Violation issued (HPD, closed)
B
05/16/2007
Violation issued (HPD, closed)
A
05/16/2007
Violation issued (HPD, closed)
B
05/16/2007
Violation issued (HPD, closed)
C
05/16/2007
Violation issued (HPD, closed)
C
04/19/2006
Violation issued (HPD, closed)
A
10/13/2005
Violation issued (HPD, closed)
A
10/05/2005
Violation issued (HPD, closed)
A
08/31/2005
Violation issued (ECB, closed)
Construction
03/10/2005
Violation issued (ECB, closed)
Construction
11/04/2004
Violation issued (ECB, closed)
Construction
07/09/2004
Violation issued (ECB, closed)
Construction
Latest 60 of 76 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILLIAM GOTTLIEB MANAGEMENT1303/22/2026
115 PERRY STREET703/22/2026
400 EAST 53RD STREET303/21/2026
WILLIAM GOTTLIEB ESTATE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL G. JONES, P.E.104/07/2026
ARQUITECTURA VARELA404/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CM3 DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC PAINTING CONTRACTING*General Contractor303/21/2026
ASHLEY, ANTHONYElectrical103/21/2026
DIOGENES BRITOElectrical103/21/2026
STEWART, DUDLEYElectrical103/21/2026
HT PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666304/18/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR11/03/2023
DOB NOWGeneral ConstructionPermit IssuedNYC PAINTING CONTRACTING*09/20/2023
BISPLISSUEDMARATHON MECHANICAL LLC06/11/2025
BISPLISSUEDMARATHON MECHANICAL LLC05/19/2025
BISPLISSUEDMARATHON MECHANICAL LLC03/23/2015
BISOTISSUEDJEPOL CONSTRUCTION INC02/03/2015
BISOTISSUEDJEPOL CONSTRUCTION INC03/27/2014
BISOTISSUEDTHE ESTATE OF WILLIAM GOTTLIEB03/29/2005
BISBLISSUEDCALARY GAS HEAT CORPORATION12/22/2000
BISPLISSUEDCALARY GAS HEAT CORPORATION12/22/2000
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/08/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
11/08/2023Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
11/08/2023Tenant Protection Plan Compliance—special
11/08/2023FinalALEKSANDR LEVINprogress
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026M08012516-P1Request digital key ↗
08/31/2026M08012516-I1Request digital key ↗
08/27/2026M08012470-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION14
08/22/2025120338884Open ↗
05/15/2025102925220Open ↗
05/14/2025102925220Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
06/11/2025102925220Open ↗
05/19/2025102925220Open ↗
05/02/2025120338884Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M08012470-P1Open ↗
08/13/2026M08012516-I1Open ↗
08/13/2026M08012516-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026M08012516-P1Open ↗
08/31/2026M08012516-I1Open ↗
08/27/2026M08012470-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/03/2014121931035Open ↗
04/27/2010120338884Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/03/2014121931035Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/03/2014121931035Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M08012470-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M08012470-P1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/27/2015121931035Open ↗
08/07/2015121931035Open ↗
03/03/2014121931035Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/05/2015121931035Open ↗
02/28/2011120338884Open ↗
▸BISSCHEDULE B - PLUMBING1
04/27/2010120338884Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/27/2010120338884Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
08/25/2025120338884Open ↗
05/15/2025102925220Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M08012516-P1Open ↗
08/31/2026M08012516-I1Open ↗
08/27/2026M08012470-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/27/2010120338884Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/03/2014121931035Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/25/2025120338884Open ↗
04/25/2025120338884Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSUPERSEDING LETTER2
06/11/2025102925220Open ↗
05/19/2025102925220Open ↗
▸BISFINAL1
04/28/2025120338884Open ↗
▸BISLANDMARKS APPROVAL1
03/03/2014121931035Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/27/2010120338884Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
04/25/2025120338884Open ↗
03/03/2014121931035Open ↗
04/27/2010120338884Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/28/2025120338884Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
08/04/2025102925220Open ↗
06/11/2025102925220Open ↗
01/17/2018121931035Open ↗
▸BISADDITIONAL INFORMATION2
08/25/2025120338884Open ↗
07/21/2025120338884Open ↗
▸BISEFILING COVER SHEET2
03/03/2014121931035Open ↗
04/27/2010120338884Open ↗
▸Other Documents7
▸DOB NOWProof of Historic Building4
08/13/2026M08012470-I1Open ↗
08/13/2026M08012470-P1Open ↗
08/13/2026M08012516-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
05/14/2025102925220Open ↗
05/02/2025120338884Open ↗
▸BISMICROFILM/RECORDS MGMT: ADDL FEE REQUIRED1
04/29/2025102925220Open ↗