← Back
Primarily 4 family with 1 store or office
242 WEST 20 STREET
MANHATTAN · BIN 1013999
💬 Discuss this project
1900Year Built
4Stories
S4Building Class
R8BZoning
6,160 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸
Primarily 4 family with 1 store or office · Owner of record: 245 REALTY L.L.C. · 1,512 sf lot · 4.07 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
245 REALTY2108/29/2026
OWNER OF 242 WEST 20 ST203/22/2026
RALPH MIKE REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SY ENGINEERING PLLC303/23/2026
MONTGUE DESIGN110/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K M DOB CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THOMAS FAYFire Protection203/21/2026
SUPERIOR BUILDERS II INCGeneral Contractor207/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
ANESIS SERVICES CORPFire Protection107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY ENGINEERING PLLC5149403/23/2026
Building Lifecycle
All (64)Filed (4)Permit Issued (4)Signed Off (3)Violation (17)Inspection (14)Objection (4)Special Inspection (18)
08/21/2026
Signed off — Alteration
NEW PLUMBING FIXTURES AND DENTAL STATIONS TO BE TIED INTO EXISTING BUILDING RISER AND STCKS, AND PROVIDE NEW AIR COMPRESSOR, COMPRESSED AIR SYSTEM, AND NEW VACUM PUMP AND VACUUM SYSTEM FOR DENTAL STATIONS.
M01301452-I1
07/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Signed off — Alteration
INTERIOR RENOVATION FOR DENTAL OFFICE INCLUDING MODIFICATION OF PARTITIONS, FLOORING, AND CEILING TILES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01300604-I1
05/04/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/29/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/21/2026
Signed off — Alteration
PROVIDE A NEW TOILET EXHAUST SYSTEM WITH DUCTWORK, AND COORDINATE THE ROUTING OF ALL DUCTWORK WITH OTHER TRADES.
M01301454-I1
04/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/13/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/23/2026
Filed — Alteration
NEW PLUMBING FIXTURES AND DENTAL STATIONS TO BE TIED INTO EXISTING BUILDING RISER AND STCKS, AND PROVIDE NEW AIR COMPRESSOR, COMPRESSED AIR SYSTEM, AND NEW VACUM PUMP AND VACUUM SYSTEM FOR DENTAL STATIONS.
M01301452-P1
03/17/2026
Special inspection requirement — Sprinkler Systems
SUNGBOM YI
03/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/17/2026
Special inspection requirement — Post-installed Anchors
SUNGBOM YI
01/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/01/2025
Permit issued — Mechanical Systems
M01301454-I1-MS
12/01/2025
Permit issued — Plumbing
M01301452-I1-EW-SP
12/01/2025
Permit issued — Plumbing
M01301452-I1-PL
11/10/2025
Permit issued — General Construction
M01300604-I1-GC
10/23/2025
Objection resolved — Addressed
10/23/2025
Objection resolved — Addressed
10/22/2025
Objection raised — Scope
10/22/2025
Objection raised — Cost
10/15/2025
Filed — Alteration
NEW PLUMBING FIXTURES AND DENTAL STATIONS TO BE TIED INTO EXISTING BUILDING RISER AND STCKS, AND PROVIDE NEW AIR COMPRESSOR, COMPRESSED AIR SYSTEM, AND NEW VACUM PUMP AND VACUUM SYSTEM FOR DENTAL STATIONS.
M01301452-I1
10/15/2025
Filed — Alteration
INTERIOR RENOVATION FOR DENTAL OFFICE INCLUDING MODIFICATION OF PARTITIONS, FLOORING, AND CEILING TILES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01300604-I1
10/15/2025
Filed — Alteration
PROVIDE A NEW TOILET EXHAUST SYSTEM WITH DUCTWORK, AND COORDINATE THE ROUTING OF ALL DUCTWORK WITH OTHER TRADES.
M01301454-I1
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
SUNGBOM YI
10/13/2025
Special inspection requirement — Shutoff dampers
SUNGBOM YI
10/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
10/13/2025
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
10/13/2025
Special inspection requirement — Maintenance information
SUNGBOM YI
10/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
10/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
10/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
10/10/2025
Special inspection requirement — Final
YUNHO LEE
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
10/10/2025
Special inspection requirement — Interior lighting power
SUNGBOM YI
10/10/2025
Special inspection requirement — Lighting controls
SUNGBOM YI
10/10/2025
Special inspection requirement — Mechanical Systems
SUNGBOM YI
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
SUNGBOM YI
10/22/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSUPERIOR BUILDERS II INC12/01/2025
DOB NOWPlumbingSigned-offTHOMAS FAY12/01/2025
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I12/01/2025
DOB NOWGeneral ConstructionSigned-offSUPERIOR BUILDERS II INC11/10/2025
BISPLISSUEDAMOK INC11/28/2011
BISPLISSUEDTMS PLMBG & HTG CORP11/28/2011
BISPLISSUEDTMS PLMBG & HTG CORP01/21/2009
BISSPISSUEDTMS PLUMBING & HTG CORP12/13/2004
BIS—ISSUED245 REALTY LLC09/18/2003
BISPLISSUEDTMS PLMBG & HTG CORP11/01/2002
BISOTISSUED245 REALTY LLC10/15/2002
BISEQISSUEDSPRING SCAFFOLDING10/01/2002
BISEQISSUEDSPRING SCAFFOLDING09/18/2002
1 project · most recent 03/23/2026
FiledStatusContractorScope
03/23/2026Signed-offTHOMAS FAY12 heads
1 project · most recent 03/23/2026
Water/Sanitary
FiledStatusContractorScope
03/23/2026Signed-offANESIS MECHANICAL CORPWater/Sanitary
1 project · most recent 01/28/2026
General Wiring
FiledStatusContractorScope
01/28/2026CompleteBOROWIDE ELECT'L CONTR'SGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/29/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/22/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/17/2026Sprinkler SystemsSUNGBOM YIspecial
03/17/2026Tenant Protection Plan Compliance—special
03/17/2026Post-installed AnchorsSUNGBOM YIspecial
10/14/2025Tenant Protection Plan ComplianceSUNGBOM YIspecial
10/13/2025Shutoff dampersSUNGBOM YIenergy_progress
10/13/2025Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
10/13/2025Energy Code Compliance InspectionsSUNGBOM YIprogress
10/13/2025Maintenance informationSUNGBOM YIenergy_progress
10/13/2025HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
10/13/2025HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
10/13/2025HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
10/10/2025FinalYUNHO LEEprogress
10/10/2025Energy Code Compliance InspectionsSUNGBOM YIprogress
10/10/2025Interior lighting powerSUNGBOM YIenergy_progress
10/10/2025Lighting controlsSUNGBOM YIenergy_progress
10/10/2025Mechanical SystemsSUNGBOM YIspecial
10/10/2025Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
10/10/2025Tenant Protection Plan ComplianceSUNGBOM YIspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026M01300604-I1Request digital key ↗
08/21/2026M01301454-I1Request digital key ↗
08/18/2026M01301452-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M01301454-I1Open ↗
09/23/2026M01301454-I1Open ↗
09/23/2026M01301454-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01301454-I1Open ↗
09/23/2026M01301454-I1Open ↗
09/23/2026M01301454-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026M01300604-I1Open ↗
08/18/2026M01301452-I1Open ↗
08/13/2026M01301452-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026M01300604-I1Open ↗
08/18/2026M01301452-I1Open ↗
08/13/2026M01301454-I1Open ↗
Showing 3 of 4 on file for this type