← Back
Predominantly retail with other uses
807 AVENUE OF THE AMER
MANHATTAN · BIN 1015081
💬 Discuss this project
1922Year Built
3Stories
K4Building Class
C6-4XZoning
6,689 sfGross Floor Area
3Units
1 Open Violation ▸
Predominantly retail with other uses · Owner of record: PT REAL ESTATE HOLDING . · 2,467 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
P T REAL ESTATE HOLDING603/22/2026
PT REAL ESTATE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MR ARCHITECTS PLLC211/09/2021
POLY ENGINEER PC301/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SM DESIGN CONSTRUCTION603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JEFF SKOWRONSKIElectrical203/21/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
SKOWRONSKI JEFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
POLY ENGINEER, P.C.6110301/22/2021
Building Lifecycle
All (49)Filed (5)Permit Issued (2)Signed Off (1)Violation (8)Objection (24)Special Inspection (9)
11/14/2021
Objection raised — Fire_Protection
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Fire_Protection
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Structural
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Mechanical
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Mechanical
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Fire_Protection
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Accessibility
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Structural
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Structural
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Structural
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Fire_Protection
11/14/2021
Objection resolved — Addressed
11/14/2021
Objection raised — Fire_Protection
11/14/2021
Objection resolved — Addressed
11/09/2021
Filed — Alteration
M00608809-I1
11/09/2021
Filed — Alteration
Proposed 2 new gas meters in the cellar, and 2 new direct vent combo boilers (1 on 2nd floor, 1 on 3rd floor). No change in use, egress or occupancy.
M00608843-I1
10/08/2021
Special inspection requirement — Heating Systems
06/18/2021
Signed off — Alteration
CAP AND REMOVE EXT'G SHOWER AND LEGALIZE EXT'G SINK FILED IN CONJUNCTION WITH ALT-2 DOB APPLICATION AND CORRECT VIOLATIONS,NO CHANGES IN USE EGRESS OR OCCUPANCY
M00293599-I1
02/16/2021
Permit issued — Plumbing
M00293599-I1-PL
01/22/2021
Filed — Alteration
CAP AND REMOVE EXT'G SHOWER AND LEGALIZE EXT'G SINK FILED IN CONJUNCTION WITH ALT-2 DOB APPLICATION AND CORRECT VIOLATIONS,NO CHANGES IN USE EGRESS OR OCCUPANCY
M00293599-P2
01/21/2021
Special inspection requirement — Maintenance information
De Gao
01/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
De Gao
01/21/2021
Special inspection requirement — Energy Code Compliance Inspections
De Gao
01/21/2021
Special inspection requirement — Fire-Resistance Rated Construction
De Gao
08/17/2020
Permit issued — Plumbing
M00293599-I1-PL
07/31/2020
Filed — Alteration
CAP AND REMOVE EXT'G SHOWER AND LEGALIZE EXT'G SINK FILED IN CONJUNCTION WITH ALT-2 DOB APPLICATION AND CORRECT VIOLATIONS,NO CHANGES IN USE EGRESS OR OCCUPANCY
M00293599-P1
07/16/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
De Gao
07/16/2020
Special inspection requirement — Energy Code Compliance Inspections
De Gao
07/16/2020
Special inspection requirement — Fire-Resistance Rated Construction
07/16/2020
Special inspection requirement — Maintenance information
De Gao
02/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2020
Filed — Alteration
CAP AND REMOVE EXT'G SHOWER AND LEGALIZE EXT'G SINK FILED IN CONJUNCTION WITH ALT-2 DOB APPLICATION AND CORRECT VIOLATIONS,NO CHANGES IN USE EGRESS OR OCCUPANCY
M00293599-I1
11/25/2019
Violation issued (ECB, closed)
Zoning
11/25/2019
Violation issued (ECB, closed)
Construction
11/25/2019
Violation issued (ECB, closed)
Construction
04/12/2016
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/23/1990
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS02/16/2021
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS08/17/2020
BISOTISSUEDSM DESIGN AND CONSTRUCTIO07/09/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/08/2021Heating Systems—special
01/21/2021Maintenance informationDe Gaoenergy_progress
01/21/2021Fire-Resistant Penetrations and JointsDe Gaospecial
01/21/2021Energy Code Compliance InspectionsDe Gaoprogress
01/21/2021Fire-Resistance Rated ConstructionDe Gaoprogress
07/16/2020Fire-Resistant Penetrations and JointsDe Gaospecial
07/16/2020Energy Code Compliance InspectionsDe Gaoprogress
07/16/2020Fire-Resistance Rated Construction—progress
07/16/2020Maintenance informationDe Gaoenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00293599-I1Request digital key ↗
08/15/2026M00293599-P2Request digital key ↗
08/15/2026M00293599-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/03/2026M00608809-I1Request digital key ↗
08/14/2026M00608843-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/27/2020123702387Open ↗
▸BISWORK PERMIT APPLICATION1
07/10/2020123702387Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00293599-P2Open ↗
09/04/2026M00293599-P1Open ↗
09/04/2026M00293599-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026M00293599-P1Open ↗
08/24/2026M00293599-P2Open ↗
08/24/2026M00293599-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/27/2020123702387Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026M00293599-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00293599-P2Open ↗
09/04/2026M00293599-P1Open ↗
09/04/2026M00293599-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/27/2020123702387Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/18/2021123702387Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/27/2020123702387Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/18/2021123702387Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/18/2021123702387Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/27/2020123702387Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/18/2021123702387Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/07/2021123702387Open ↗
▸BISEFILING COVER SHEET1
01/27/2020123702387Open ↗