← Back
Multi-story retail building (2+)
57 WEST 21 STREET
MANHATTAN · BIN 1015522
💬 Discuss this project
1851Year Built
2Stories
K2Building Class
C6-4AZoning
5,238 sfGross Floor Area
1Units
1 Open Violation ▸
Multi-story retail building (2+) · Owner of record: 57 WEST REALTY LLC · 2,272 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 7 docs
Floor 13p · 1 filing · 7 docs
1 job · most recent 10/24/2023
Associated Ducts and Piping
FiledStatusContractorScope
10/24/2023——Associated Ducts and Piping
1 job · most recent 10/24/2023
Water/Sanitary
FiledStatusContractorScope
10/24/2023——Water/Sanitary
1 job · most recent 08/10/2018
FiledStatusContractorScope
08/10/2018CompleteHESO ELECTRICAL INC2 meters, 1 new_meters
Building Lifecycle
All (18)Filed (3)Permit Issued (1)Signed Off (1)Violation (2)Objection (2)Special Inspection (9)
10/25/2023
Objection raised — Scope
10/25/2023
Objection raised — Scope
10/24/2023
Filed — Alteration
ARCHITECTURAL MODIFICATION TO GROUND FLOOR COMMERCIAL TENANT SPACE. INSTALLATION OF NEW ACCESSIBLE BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00947375-S1
10/24/2023
Filed — Alteration
ARCHITECTURAL MODIFICATION TO GROUND FLOOR COMMERCIAL TENANT SPACE. INSTALLATION OF NEW ACCESSIBLE BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00947375-I1
10/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/12/2023
Special inspection requirement — Mechanical Systems
10/12/2023
Special inspection requirement — Final
08/03/2021
Signed off — Alteration
INSTALLATION OF OUTDOOR AC UNITS OF NEW STEEL BEAMS ON THE ROOF, CONNECT TO NEW UNITS TO EXISTING ELECTRIC POWER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00534140-I1
07/27/2021
Permit issued — Mechanical Systems
M00534140-I1-MS
07/02/2021
Filed — Alteration
INSTALLATION OF OUTDOOR AC UNITS OF NEW STEEL BEAMS ON THE ROOF, CONNECT TO NEW UNITS TO EXISTING ELECTRIC POWER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00534140-I1
06/04/2021
Special inspection requirement — Mechanical Systems
Dmitry Levin
06/04/2021
Special inspection requirement — Maintenance information
Dmitry Levin
06/04/2021
Special inspection requirement — Final
Dmitry Levin
06/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
06/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
04/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
57 WEST REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AZARKIAN ARCHITECTURE P.C.210/24/2023
LEVIN ENGINEERING PLLC107/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING VIOLATION SOLUTIONS403/21/2026
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HERNAN SOCARRASElectrical103/21/2026
HANDY MEN OF NYC INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267107/02/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHANDY MEN OF NYC INC07/27/2021
BISOTISSUEDGLOBAL GREEN ENERGY INC09/22/2017
BISOTISSUEDGCG INDUSTRIES INC03/30/2016
BIS—ISSUEDCITY SIGNS INC12/28/2006
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/13/2023Fire-Resistant Penetrations and Joints—special
10/13/2023Fire-Resistant Penetrations and Joints—special
10/12/2023Mechanical Systems—special
10/12/2023Final—progress
06/04/2021Mechanical SystemsDmitry Levinspecial
06/04/2021Maintenance informationDmitry Levinenergy_progress
06/04/2021FinalDmitry Levinprogress
06/04/2021HVAC-R and service water heating system controlsDmitry Levinenergy_progress
06/04/2021HVAC-R and service water heating equipmentDmitry Levinenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00534140-I1Request digital key ↗
08/28/2026M00947375-I1Request digital key ↗
08/28/2026M00947375-S1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
09/25/2017122670966Open ↗
04/11/2016122670966Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/07/2016122670966Open ↗
▸DOB NOWLPC Approval/Permit1
08/13/2026M00534140-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026M00947375-I1Open ↗
08/28/2026M00947375-S1Open ↗
08/13/2026M00534140-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/11/2016122670966Open ↗
04/07/2016122670966Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00534140-I1Open ↗
09/01/2026M00534140-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/07/2016122670966Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/07/2016122670966Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M00534140-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/07/2016122670966Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026M00947375-S1Open ↗
08/28/2026M00947375-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/07/2016122670966Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/07/2016122670966Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00534140-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/25/2017122670966Open ↗
▸BISLANDMARKS APPROVAL1
04/07/2016122670966Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/07/2016122670966Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/07/2016122670966Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M00947375-I1Open ↗