DOB02/22/2022FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DOB09/07/2021V-DOB VIOLATION - ACTIVE
DOB07/05/2019V-DOB VIOLATION - ACTIVE
DOB05/31/2018FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
DOB06/08/20011P3978
DOB01/13/1997V-DOB VIOLATION - ACTIVE
ECB02/20/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35675339M ISSUED ON 11/17/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERTNothing owed — awaiting certificate of correction
ECB01/12/2024FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES.AT TIME OF INSPECTION OBSERVED AT WEST ELEVATION ON EXP #4 MISSING MORTAR JOINTS & CRACKED MISSING & PEELED STUCCO & COATING PROTECTION AT MULTIPLE LOCATIONS.RENothing owed — awaiting certificate of correction
ECB11/27/2023FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED SPALLING/CRACKING/CHIPPING OF BRICKS AT MULTIPLE LOCATIONS ON FACADE EXPOSURE 1. MOREOVER, SPALLING, CHIPPNothing owed — awaiting certificate of correction
ECB12/22/2022FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A AND 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#902334.AGG1 PRIOR NOV#37021137YNothing owed — awaiting certificate of correction
ECB07/09/2021FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#802334. AGG1 PRIOR NOV 37011308K UNDER 28Nothing owed — awaiting certificate of correction
ECB12/04/2018FAILURE TO MAINTAIN BUIDLING EXTERIOR WALLS/FACADE AND APPURTENANCES. EXP (1): DAMAGED MORTAR JOINTS AT WATER TABLE AND ALSO DEFECT AT THE FOLLOWING FLOORS 6,7,8 FLOORS. EXPOSURE 4: DAMAGED MORTAR JOINT AT PARANothing owed — awaiting certificate of correction
ECB09/25/2018FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#802334. REMEDY: SUBMIT REQUIRED TECHNICAL REPORTNothing owed — awaiting certificate of correction
ECB12/20/2017FAILURE TO MAINTAIN EXTERIOR BLDG FACADE AS PER 1RCNY 103-04. NOTED: @ TIME OF INSP EXP#4 NORTH ELEVATION, SPALLING & CHIPPED DECORATIVE STONE ON 8TH FLR WATER TABLE, WEST ELEVATION. EXP#4 SPALLING BRICKWORK &Nothing owed — awaiting certificate of correction