← Back
Office only, 2-6 stories
Archive for Research in Archetypal Symbolism
28 EAST 39 STREET · BIN 1017240
💬 Discuss this project
1915Year Built
4Stories
O2Building Class
R8BZoning
6,606 sfGross Floor Area
5Units
3 Open Violations ▸
Office only, 2-6 stories · 2,472 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 18 docs
Floor 4Under Construction12p · 4 filings · 20 docs
Floor 3Under Construction8p · 1 filing · 14 docs
Floor 2Under Construction9p · 2 filings · 18 docs
Floor 1Under Construction13p · 2 filings · 20 docs
Mezzanine3p · 1 filing · 14 docs
CellarUnder Construction10p · 2 filings · 18 docs
Basement4p · 2 filings · 17 docs
Sub-BasementUnder Construction7p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C G JUNG FOUNDATION FOR ANALYTICAL1907/08/2026
THE JUNG FOUNDATION103/22/2026
THE CG JANG FOUNDATION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KENDALL ENGINEERING PC301/08/2026
MG NEW YORK ARCHITECTS,PLLC212/03/2024
PIRO STUDIO LLC112/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WIZ FIRE SPRINKLERS LLCFire Protection207/08/2026
KNIGHT ELEC'L SERV. CORP.Electrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
AMAZING BUILDERS AND RENOGeneral Contractor107/08/2026
V C S MECHANICAL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KENDALL ENGINEERING PC4154301/08/2026
PIRO STUDIO LLC7503112/03/2024
MG NEW YORK ARCHITECTS, P3444106/14/2023
Building Lifecycle
All (44)Filed (6)Permit Issued (5)Signed Off (2)Violation (15)Inspection (5)Objection (2)Special Inspection (9)
07/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/08/2026
Permit issued — Sprinklers
M00864283-I1-EW-SP
04/27/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/27/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
02/25/2026
Signed off — Alteration
Filing for the installation of new HVAC system . There is no change to use, egress, or occupancy
M01137518-S1
01/14/2026
Special inspection requirement — Sprinkler Systems
KEVIN KENDALL
01/08/2026
Filed — Alteration
Filing herewith for the removal and installation of replaced, relocated and new sprinkler heads. There is no change to use, egress, or occupancy.
M00864283-P3
12/18/2025
Special inspection requirement — Sprinkler Systems
KEVIN KENDALL
11/12/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/15/2025
Signed off — Alteration
Filing for the installation of new HVAC system . There is no change to use, egress, or occupancy
M01137518-I1
09/15/2025
Filed — Alteration
Filing herewith for the removal and installation of replaced, relocated and new sprinkler heads. There is no change to use, egress, or occupancy.
M00864283-P2
09/10/2025
Special inspection requirement — Sprinkler Systems
KEVIN KENDALL
06/18/2025
Permit issued — Sprinklers
M00864283-I1-EW-SP
01/09/2025
Permit issued — Mechanical Systems
M01137518-S1-MS
01/02/2025
Permit issued — General Construction
M01137518-I1-GC
12/03/2024
Filed — Alteration
Filing for the installation of new HVAC system . There is no change to use, egress, or occupancy
M01137518-S1
12/03/2024
Filed — Alteration
Filing for the installation of new HVAC system . There is no change to use, egress, or occupancy
M01137518-I1
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
11/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
11/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
11/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
11/05/2024
Special inspection requirement — Final
PIETRO ROSATO
11/05/2024
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
09/12/2024
Permit issued — Sprinklers
M00864283-I1-EW-SP
06/27/2023
Objection resolved — Addressed
06/15/2023
Objection raised — Scope
06/14/2023
Filed — Alteration
FILING HEREWITH FOR THE PROPOSED INTERIOR FIRESTOPPING AND PATCHING OF FINISHES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00889925-I1
05/15/2023
Filed — Alteration
Filing herewith for the removal and installation of replaced, relocated and new sprinkler heads. There is no change to use, egress, or occupancy.
M00864283-I1
03/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/22/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/05/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/27/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/16/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/21/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/29/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/21/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/25/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/1990
Violation issued (ECB, closed)
Public Assembly
04/13/1989
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN06/08/2026
DOB NOWSprinklersPermit IssuedWIZ FIRE SPRINKLERS LLC06/18/2025
DOB NOWMechanical SystemsSigned-offV C S MECHANICAL INC01/09/2025
DOB NOWGeneral ConstructionSigned-offAMAZING BUILDERS AND RENO01/02/2025
DOB NOWSprinklersPermit IssuedWIZ FIRE SPRINKLERS LLC09/12/2024
1 project · most recent 01/08/2026
FiledStatusContractorScope
01/08/2026Permit IssuedPRIME PIPING & HEATING IN189 heads
4 projects · most recent 11/03/2024
General Wiring
FiledStatusContractorScope
11/03/2024Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
09/29/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
09/11/2020Permit IssuedDELTA PHASE ELEC'L CORP.General Wiring
07/15/2020CancelledTHYSSENKRUPP ELEVATOR CO—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2026Pass-Final PL - UndergroundPassView ↗
04/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
11/12/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/14/2026Sprinkler SystemsKEVIN KENDALLspecial
12/18/2025Sprinkler SystemsKEVIN KENDALLspecial
09/10/2025Sprinkler SystemsKEVIN KENDALLspecial
12/03/2024Energy Code Compliance InspectionsPIETRO ROSATOprogress
11/11/2024HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
11/11/2024HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
11/11/2024HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
11/05/2024FinalPIETRO ROSATOprogress
11/05/2024Mechanical SystemsPIETRO ROSATOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MountainsideOffice—
Project M01289759 Alteration · Permit Entire · 02/11/2026
C.G. Jung FoundationUnknown—
Project M00864283 Alteration · Permit Entire · 05/15/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/30/2026M00889925-I1Request digital key ↗
08/25/2026M01137518-I1Request digital key ↗
08/25/2026M01137518-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026M01137518-I1Open ↗
08/25/2026M01137518-S1Open ↗
08/20/2026M00864283-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M01137518-S1Open ↗
09/01/2026M01137518-S1Open ↗
09/01/2026M01137518-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01137518-S1Open ↗
08/28/2026M00864283-P2Open ↗
08/26/2026M00864283-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026M01137518-I1Open ↗
08/25/2026M01137518-S1Open ↗
08/20/2026M00864283-P2Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/25/2026M01137518-I1Open ↗
08/25/2026M01137518-S1Open ↗
08/20/2026M00864283-I1Open ↗
Showing 3 of 6 on file for this type