RoofUnder Construction25p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents · 1 drawing sheet
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 10Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 9Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 8Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 7Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 6Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 5Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 2Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 1Under Construction22p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
CellarUnder Construction23p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
5 documents
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
2 documents
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AND ROOF DRAINS AND BACKWATER VALVE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Latest 3 of 4 filings on this floor.