← Back
Primarily 1 family with 1 store or office
207 EAST 31 STREET
MANHATTAN · BIN 1020031
💬 Discuss this project
1901Year Built
3Stories
S1Building Class
R7BZoning
2,030 sfGross Floor Area
2Units
0 Open Violations
Primarily 1 family with 1 store or office · 650 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
Mechanical
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSS ENGINEERS304/04/2024
ASSORTED A/D204/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GBL MECHANICAL INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492304/04/2024
VALERIO ASSOCIATES, P.C.1379204/04/2024
Building Lifecycle
All (26)Filed (5)Permit Issued (3)Signed Off (2)Violation (1)Inspection (5)Special Inspection (10)
11/21/2024
Signed off — Alteration
Filing for the upgrading of boiler equipment, water heater and gas piping. Installation of fireplace. No change in use, egress or occupancy.
M00458748-I1
10/18/2024
Signed off — Alteration
M01017086-I1
06/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/07/2024
Permit issued — Plumbing
M00458748-I1-PL
06/07/2024
Permit issued — Plumbing
M01017086-I1-PL
04/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
David Anderson
04/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
David Anderson
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN VALERIO
04/04/2024
Filed — Alteration
M01017086-I1
04/04/2024
Filed — Alteration
Filing for the upgrading of boiler equipment, water heater and gas piping. Installation of fireplace. No change in use, egress or occupancy.
M00458748-P3
06/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
06/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
bassam (sam) rimawi
06/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
bassam (sam) rimawi
02/02/2023
Filed — Alteration
Filing for the upgrading of boiler equipment, water heater and gas piping. Installation of fireplace. No change in use, egress or occupancy.
M00458748-P2
11/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
11/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2022
Filed — Alteration
Filing for the upgrading of boiler equipment, water heater and gas piping. Installation of fireplace. No change in use, egress or occupancy.
M00458748-P1
08/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
bassam (sam) rimawi
08/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
bassam (sam) rimawi
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
07/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2022
Permit issued — Plumbing
M00458748-I1-PL
02/09/2022
Filed — Alteration
Filing for the upgrading of boiler equipment, water heater and gas piping. Installation of fireplace. No change in use, egress or occupancy.
M00458748-I1
12/01/2006
Violation issued (ECB, closed)
Plumbing
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC06/07/2024
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC06/07/2024
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC05/11/2022
BIS—ISSUEDMARO INTERIORS INC05/27/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/05/2024HVAC-R and service water heating equipmentDavid Andersonenergy_progress
04/05/2024HVAC-R and service water heating system controlsDavid Andersonenergy_progress
04/05/2024Fire-Resistant Penetrations and JointsJOHN VALERIOspecial
06/19/2023Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
06/19/2023HVAC-R and service water heating system controlsbassam (sam) rimawienergy_progress
06/19/2023HVAC-R and service water heating equipmentbassam (sam) rimawienergy_progress
11/23/2022Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
08/30/2022HVAC-R and service water heating system controlsbassam (sam) rimawienergy_progress
08/30/2022HVAC-R and service water heating equipmentbassam (sam) rimawienergy_progress
08/30/2022Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026M00458748-P2Request digital key ↗
08/27/2026M00458748-P1Request digital key ↗
08/27/2026M00458748-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch1
08/27/2026M01017086-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026M01017086-I1Open ↗
08/13/2026M00458748-P3Open ↗
08/13/2026M00458748-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00458748-P1Open ↗
09/01/2026M00458748-I1Open ↗
08/24/2026M00458748-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00458748-P1Open ↗
09/01/2026M00458748-I1Open ↗
08/23/2026M00458748-P3Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00458748-I1Open ↗
08/13/2026M00458748-P1Open ↗
08/13/2026M00458748-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00458748-I1Open ↗