← Back
Walk-up apt, over six families with stores
265 1 AVENUE
MANHATTAN · BIN 1020423
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C1-6AZoning
8,580 sfGross Floor Area
10Units
Rent Stabilized30 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: FIRST AVENUE EQUITIES · 2,266 sf lot · 3.79 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
3 jobs · most recent 11/15/2025
General Wiring
FiledStatusContractorScope
11/15/2025CompleteJONG HYUN KIM—
05/08/2023CompleteRICHARD NEU—
02/21/2023CompleteJ Y ELECTRIC INCGeneral Wiring
Building Lifecycle
All (75)Filed (4)Permit Issued (4)Signed Off (3)Violation (60)Inspection (1)Special Inspection (3)
06/04/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/28/2026
Permit issued — Sign
M01333349-I1-SG
01/25/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01333349-I1
12/01/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00867512-I1
12/01/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00867511-I1
11/15/2023
Signed off — Alteration
1. REMOVE & REPLACE PARAPET WALL FROM TOP FLOOR WINDOW LINTEL TO UP TO ROOF LEVEL AT NORTH FACADE OF THE BUILDING=66LF2. BRICK JOINT RE-POINTING APPROXIMATELY= 700SF3. BRICK REPAIR/REPLACEMENT WORK AT NORTH FACADE OF THE BUILDING APPROXIMATELY=75 SF
M00888612-I1
08/08/2023
Permit issued — General Construction
M00888612-I1-GC
08/01/2023
Filed — Alteration
1. REMOVE & REPLACE PARAPET WALL FROM TOP FLOOR WINDOW LINTEL TO UP TO ROOF LEVEL AT NORTH FACADE OF THE BUILDING=66LF2. BRICK JOINT RE-POINTING APPROXIMATELY= 700SF3. BRICK REPAIR/REPLACEMENT WORK AT NORTH FACADE OF THE BUILDING APPROXIMATELY=75 SF
M00888612-I1
06/12/2023
Special inspection requirement — Masonry
NORMAN LOK
06/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
06/12/2023
Special inspection requirement — Final
Eric Foster
05/06/2023
Permit issued — Sidewalk Shed
M00867511-I1-SH
05/01/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00867512-I1
05/01/2023
Permit issued — Supported Scaffold
M00867512-I1-SF
04/30/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00867511-I1
01/22/2022
Violation issued (HPD, closed)
C
08/08/2018
Violation issued (HPD, closed)
B
08/08/2018
Violation issued (HPD, closed)
B
08/08/2018
Violation issued (HPD, closed)
B
06/21/2017
Violation issued (ECB, closed)
Construction
09/25/2016
Violation issued (ECB, closed)
Construction
07/25/2016
Violation issued (ECB, closed)
Construction
06/18/2016
Violation issued (ECB, closed)
Construction
05/08/2016
Violation issued (ECB, closed)
Construction
05/08/2016
Violation issued (ECB, closed)
Construction
01/16/2016
Violation issued (ECB, closed)
Construction
01/16/2016
Violation issued (ECB, closed)
Construction
12/01/2015
Violation issued (ECB, closed)
Construction
12/01/2015
Violation issued (ECB, closed)
Construction
10/29/2015
Violation issued (HPD, closed)
B
10/25/2015
Violation issued (ECB, closed)
Construction
10/25/2015
Violation issued (ECB, closed)
Construction
10/25/2015
Violation issued (ECB, closed)
Construction
10/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2015
Violation issued (ECB, closed)
Construction
09/12/2015
Violation issued (ECB, closed)
Construction
09/12/2015
Violation issued (ECB, closed)
Construction
07/31/2015
Violation issued (ECB, closed)
Construction
07/31/2015
Violation issued (ECB, closed)
Construction
07/25/2015
Violation issued (ECB, closed)
Construction
06/16/2015
Violation issued (ECB, closed)
Construction
05/20/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2015
Violation issued (ECB, closed)
Construction
02/26/2015
Violation issued (ECB, closed)
Construction
02/26/2015
Violation issued (ECB, closed)
Construction
02/26/2015
Violation issued (HPD, closed)
C
02/26/2015
Violation issued (HPD, open)
A
02/26/2015
Violation issued (HPD, open)
C
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2012
Violation issued (HPD, open)
C
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
B
11/14/2012
Violation issued (HPD, open)
A
11/14/2012
Violation issued (HPD, open)
A
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIKING MANAGEMENT207/08/2026
STEEL CONSTRUCTION807/08/2026
FAMOUS RESTORATION INC503/22/2026
FIRST AVENUE EQUITIES3103/22/2026
1ST AVE EQUITIES1103/22/2026
CITY OF NY HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.101/25/2026
ASHRAF CORP108/01/2023
ENTHINK ENGINEERS LLC205/01/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL CONSTRUCTION LLCGeneral Contractor407/08/2026
FAMOUS RESTORATION INCGeneral Contractor203/21/2026
J Y ELECTRIC INCElectrical203/22/2026
W&W STEEL ERECTORS LLCElectrical103/21/2026
BOWIE, RONALDElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
JIAN YANG YUElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818108/01/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC05/28/2026
DOB NOWGeneral ConstructionSigned-offSE ENERGY08/08/2023
DOB NOWSidewalk ShedSigned-offSTEEL CONSTRUCTION LLC05/06/2023
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC05/01/2023
BISOTISSUEDHENG TAI CONSTRUCTION INC01/28/2021
BISOTISSUEDHENG TAI CONSTRUCTION INC10/15/2019
BISOTISSUEDYAN TAI CONSTRUCTION INC04/07/2015
BISBLISSUEDALL AMERICAN HEATING INC08/15/2013
BISFBISSUEDALMAR FUEL OIL CORP12/23/1991
BISOTISSUEDMORRIS PLG AND HTG CORP07/25/1991
BISPLISSUEDMORRIS PLG AND HTG CORP07/25/1991
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/04/2026Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/12/2023MasonryNORMAN LOKspecial
06/12/2023Tenant Protection Plan ComplianceNORMAN LOKspecial
06/12/2023FinalEric Fosterprogress
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026M00867511-I1Request digital key ↗
08/31/2026M00867512-I1Request digital key ↗
08/29/2026M00888612-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
10/16/2019123786359Open ↗
01/30/2019123198379Open ↗
01/18/2018123198379Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
10/16/2019123786359Open ↗
04/14/2015122360907Open ↗
08/13/2013140105455Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
01/18/2018123198379Open ↗
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/16/2019123786359Open ↗
01/18/2018123198379Open ↗
04/14/2015122360907Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026M00867511-I1Open ↗
08/31/2026M00867512-I1Open ↗
08/29/2026M00888612-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/16/2019123786359Open ↗
04/14/2015122360907Open ↗
08/17/2009120132365Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/16/2019123786359Open ↗
04/14/2015122360907Open ↗
08/13/2013140105455Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M00888612-I1Open ↗
08/28/2026M00888612-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/13/2013140105455Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/13/2013140105455Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/17/2009120132365Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
02/19/2019123198379Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M00888612-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/18/2018123198379Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/13/2013140105455Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
10/16/2019123786359Open ↗
▸BISSTREET TREE CHECKLIST1
02/19/2019123198379Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/16/2019123786359Open ↗
04/14/2015122360907Open ↗
08/13/2013140105455Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/17/2009120132365Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/29/2026M00888612-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/16/2019123786359Open ↗
12/12/2014140105455Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/26/2021123786359Open ↗
08/13/2013140105455Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/12/2014140105455Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/13/2013140105455Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/26/2021123786359Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/26/2021123786359Open ↗
08/13/2013140105455Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/26/2021123786359Open ↗
12/12/2014140105455Open ↗
12/19/2009120132365Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/26/2021123786359Open ↗
12/19/2009120132365Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
01/30/2019123198379Open ↗
01/18/2018123198379Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/17/2009120132365Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT7
10/16/2019123786359Open ↗
01/18/2018123198379Open ↗
04/14/2015122360907Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/19/2019123198379Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/26/2021123786359Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
02/19/2019123198379Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
10/16/2019123786359Open ↗
01/18/2018123198379Open ↗
04/14/2015122360907Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
07/13/2015122360907Open ↗
07/18/2014140105455Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/13/2013140105455Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
01/18/2018123198379Open ↗