DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/29/2001VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
ECB03/29/2001WORK WITHOUT A PERMIT.NOTED:PARTITION WALLS REMOVED BATHROOM REMOVED NEW WOODEN STUDS ERECTED AND METAL STUDS ERECTED APPROX 8FT HIGH AND 6FT WIDE ON 2ND FLOOR APT 1.REMEDY:STOP ALL WORK.OBTAIN PLANS AND APPROVNothing owed — awaiting certificate of correction
ECB03/26/2001PLUMBING WORK WITHOUT A PERMIT.STOP ALL PLUMBING WORK!NEW ROUGHING INSTALLED AND ADDITION MADE FOR EXTRA WATER CLOSETS AND LAVATORY'S IN 2ND FLOOR BATHROOM (ROUGHING INCLUDES WASTE,VENTING)ALSO NEW GAS LINE INSNothing owed — awaiting certificate of correction
ECB03/26/2001WORK PERFORM WAS REQUIRED TO BE PERFORMED BY A MASTER LICENSED PLUMBER.NEW ROUGHING INSTALLED,AND ADDITIONS MADE FOR EXTA WATER CLOSETS AND LAVATORY'S IN 2ND FLOOR BATHROOM.(ROUGHING INCLUDES WASTE,VENTING).ALSNothing owed — awaiting certificate of correction
ECB03/26/2001FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED.NEW ROUGHING INSTALLED AND ADDITIONS MADE FOR EXTRA WATER CLOSETS AND LAVATORY'S IN 2ND FLOOR BATHROOM.(ROUGHING INCLUDES WASTE,VENTING).ALSO NEW GAS LINE INothing owed — awaiting certificate of correction
Primarily 4 family with 1 store or office · 1,008 sf lot · 3 FAR built · Flood zone X