← Back
MANHATTAN
57 WEST 68 STREET
MANHATTAN · BIN 1028445
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open Violations
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAFFODIL GENERAL CONTRACTING509/13/2026
57 WEST 68TH STREETASSOCIATES103/22/2026
B H B CONSTRUCTION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC104/23/2026
BITOPI CONSULTANTS LLC204/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAFFODIL GENERAL CONTRACTINGGeneral Contractor107/08/2026
SAFECO GROUP CORPGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404104/23/2026
Building Lifecycle
All (14)Filed (3)Permit Issued (3)Signed Off (3)Violation (3)Inspection (2)
08/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/20/2026
Signed off — Alteration
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE
M01384912-I1
07/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
M01384982-I1
07/08/2026
Signed off — Alteration
APPLICATION TO REPAIR BROWN STONE/SPOTPOINTING ON FACADE, WINDOWS CAULKING AND PAINT ALSO ENTIRE FRONT POWER WASH ASPER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M01385757-I1
06/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2026
Permit issued — General Construction
M01385757-I1-GC
04/23/2026
Filed — Alteration
APPLICATION TO REPAIR BROWN STONE/SPOTPOINTING ON FACADE, WINDOWS CAULKING AND PAINT ALSO ENTIRE FRONT POWER WASH ASPER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M01385757-I1
04/13/2026
Permit issued — Sidewalk Shed
M01384912-I1-SH
04/13/2026
Permit issued — Supported Scaffold
M01384982-I1-SF
04/10/2026
Filed — Alteration
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE
M01384912-I1
04/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR EXTERIOR REPAIRS AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
M01384982-I1
11/15/2023
Violation issued (HPD, closed)
I
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDAFFODIL GENERAL CONTRACTING05/01/2026
DOB NOWSidewalk ShedSigned-offSAFECO GROUP CORP04/13/2026
DOB NOWSupported ScaffoldSigned-offPAUL TOTH EXCAVATION INC04/13/2026
BISEQISSUEDB H & B CONSTRUCTION INC08/07/2013
BISEQISSUEDB H & B CONSTRUCTION INC07/31/2013
1 project · most recent 04/09/2026
FiledStatusContractorScope
04/09/2026Permit IssuedK.N.C ELECTRIC INC—
2 projects · most recent 04/10/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/10/2026Signed-offSAFECO GROUP CORPSidewalk Shed
04/10/2026Signed-offSAFECO GROUP CORPScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026M01384912-I1Request digital key ↗
08/17/2026M01384982-I1Request digital key ↗
08/17/2026M01385757-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸BISWORK PERMIT APPLICATION2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸DOB NOWLPC Approval/Permit1
08/17/2026M01385757-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026M01384912-I1Open ↗
08/17/2026M01384982-I1Open ↗
08/17/2026M01385757-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/31/2013140101333Open ↗
10/31/2013140101351Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/06/2013140101351Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/31/2013140101333Open ↗
10/31/2013140101351Open ↗
▸BISLANDMARKS APPROVAL2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
08/06/2013140101351Open ↗
07/30/2013140101333Open ↗