← Back
Primarily 5-6 family with 1 store or office
15A WEST 73 STREET
MANHATTAN · BIN 1028665
💬 Discuss this project
1884Year Built
4Stories
S5Building Class
R8BZoning
5,622 sfGross Floor Area
7Units
Rent Stabilized12 Open Violations ▸
Primarily 5-6 family with 1 store or office · Owner of record: 15A WEST 73RD STREET LLC · 2,299 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15A WEST 73RD STREET LLC203/22/2026
KATZ CONSTRUCTION103/22/2026
FINE TIMES INC C/O DO103/21/2026
FINE TIMES INC C O DO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JP ENGINEERING110/15/2021
RICHARD KOENIGSBERG210/06/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I G H RESTORATION LLCGeneral Contractor203/21/2026
DARIO KNESICHElectrical103/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008110/15/2021
KOENIGSBERG ENGINEERING,2247109/29/2021
Building Lifecycle
All (61)Filed (3)Permit Issued (2)Signed Off (2)Violation (39)Inspection (1)Special Inspection (14)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2024
Signed off — Alteration
INSTALLATION OF TWO BOILERS AND ONE HOT WATER HEATER. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
M00586085-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2022
Signed off — Alteration
RESTORATATION OF THE EXISTING FRONT FACADE. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK
M00602368-I1
02/16/2022
Violation issued (HPD, closed)
A
01/10/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/25/2021
Permit issued — Boiler Equipment
M00586085-I1-BE
10/15/2021
Filed — Alteration
INSTALLATION OF TWO BOILERS AND ONE HOT WATER HEATER. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
M00586085-I1
10/07/2021
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
10/07/2021
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
10/07/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
10/07/2021
Special inspection requirement — Energy Code Compliance Inspections
RICHARD KOENIGSBERG
10/07/2021
Special inspection requirement — Final
RICHARD KOENIGSBERG
10/06/2021
Filed — Alteration
RESTORATATION OF THE EXISTING FRONT FACADE. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK
M00602368-P1
10/06/2021
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
10/06/2021
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
10/06/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
10/06/2021
Special inspection requirement — Final
RICHARD KOENIGSBERG
10/06/2021
Special inspection requirement — Energy Code Compliance Inspections
RICHARD KOENIGSBERG
10/05/2021
Permit issued — General Construction
M00602368-I1-GC
09/29/2021
Filed — Alteration
RESTORATATION OF THE EXISTING FRONT FACADE. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK
M00602368-I1
09/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
09/10/2021
Special inspection requirement — Maintenance information
GLEN LANGER
09/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
GLEN LANGER
09/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
GLEN LANGER
06/23/2021
Violation issued (ECB, closed)
Boilers
02/03/2015
Violation issued (HPD, closed)
I
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/1989
Violation issued (ECB, closed)
Construction
10/03/1989
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
06/30/1986
Violation issued (HPD, closed)
B
06/30/1986
Violation issued (HPD, closed)
B
02/27/1984
Violation issued (HPD, open)
A
02/27/1984
Violation issued (HPD, closed)
A
02/27/1984
Violation issued (HPD, closed)
B
02/27/1984
Violation issued (HPD, closed)
B
02/27/1984
Violation issued (HPD, closed)
B
11/28/1978
Violation issued (HPD, open)
B
11/28/1978
Violation issued (HPD, closed)
B
09/06/1974
Violation issued (HPD, closed)
A
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMC PLBG, HTG & CLNG, INC10/25/2021
DOB NOWGeneral ConstructionSigned-offI G H RESTORATION10/05/2021
BISOTISSUEDKENNY CONSTRUCTION & DEV05/19/2011
1 project · most recent 07/19/2021
General Wiring
FiledStatusContractorScope
07/19/2021CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/10/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/07/2021MasonryRICHARD KOENIGSBERGspecial
10/07/2021Post-installed AnchorsRICHARD KOENIGSBERGspecial
10/07/2021Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
10/07/2021Energy Code Compliance InspectionsRICHARD KOENIGSBERGprogress
10/07/2021FinalRICHARD KOENIGSBERGprogress
10/06/2021MasonryRICHARD KOENIGSBERGspecial
10/06/2021Post-installed AnchorsRICHARD KOENIGSBERGspecial
10/06/2021Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
10/06/2021FinalRICHARD KOENIGSBERGprogress
10/06/2021Energy Code Compliance InspectionsRICHARD KOENIGSBERGprogress
09/10/2021Fire-Resistant Penetrations and JointsGLEN LANGERspecial
09/10/2021Maintenance informationGLEN LANGERenergy_progress
09/10/2021HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
09/10/2021HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00602368-I1Request digital key ↗
09/03/2026M00602368-P1Request digital key ↗
09/03/2026M00586085-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
03/15/2011120627786Open ↗
07/01/2009120092425Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026M00602368-I1Open ↗
08/13/2026M00602368-P1Open ↗
▸BISWORK PERMIT APPLICATION1
05/23/2011120627786Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M00586085-I1Open ↗
09/23/2026M00586085-I1Open ↗
09/23/2026M00586085-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M00586085-I1Open ↗
08/27/2026M00602368-I1Open ↗
08/27/2026M00602368-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026M00602368-P1Open ↗
09/03/2026M00602368-I1Open ↗
09/03/2026M00586085-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/15/2011120627786Open ↗
07/01/2009120092425Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
03/15/2011120627786Open ↗
▸Environmental & Asbestos6
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/15/2011120627786Open ↗
03/15/2011120627786Open ↗
07/01/2009120092425Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00602368-P1Open ↗
09/03/2026M00602368-I1Open ↗
09/03/2026M00586085-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00586085-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00586085-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
03/15/2011120627786Open ↗
07/01/2009120092425Open ↗
▸BISLANDMARKS APPROVAL1
07/22/2009120092425Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/15/2011120627786Open ↗
07/01/2009120092425Open ↗