DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
HPD09/06/2000SECTION 27-2050 ADM CODE MAINTAIN ON THE PREMISES A COPY OF THE SPRINKLER TEST FOR THE CURRENT YEAR. AT CELLAR
HPD09/06/2000SECTION 27-2050 ADM CODE PROVIDE 3 EXTRA SPRINKLER HEADS AND SUITABLE WRENCH FOR EMERGENCY PURPOSES AT O.S.Y. VALVE OF SPRINKLER IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT , AT CELLAR
HPD09/06/2000SECTION 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM. AT CELLAR
HPD09/06/2000SECTION 27-2050 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT NOT SEALED AT TIME OF INSPECTION. AT CELLAR
HPD08/30/2000SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS. AT FRONT AREAWAY
HPD06/19/1987D26-21.07 ADM CODE PROVIDE 3 EXTRA SPRINKLER HEADS AND SUITABLE WRENCH FOR EMERGENCY PURPOSES AT O.S.Y. VALVE OF SPRINKLER IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT CELLAR FRONT WEST.
HPD06/19/1987D26-21.07 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT CELLAR FRONT WEST.