← Back
One story retail building
842 2 AVENUE
MANHATTAN · BIN 1038769
💬 Discuss this project
1910Year Built
1Stories
K1Building Class
C1-9Zoning
1,260 sfGross Floor Area
2Units
One story retail building · Owner of record: 842 2ND AVE. LLC · 1,260 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 12p · 2 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCCRAY ARCHITECT P.C.510/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO503/21/2026
D W G SERVICES503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DWG SERVICES INCGeneral Contractor603/21/2026
CJ HEATING & MECHANICAL CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129110/28/2022
Building Lifecycle
All (6)Filed (5)Signed Off (1)
02/08/2023
Signed off — Alteration
M00637805-I1
10/28/2022
Filed — Alteration
PLANS FILE TO SHOW NEW KITCHEN EXHAUST HOOD WITH DETAILS FOR EXISTING EATING AND DRINKING ESTABLISHMENT NO CHANGE TO USE EGRESS OR OCCUPANCY
M08017968-I1
06/28/2022
Filed — Alteration
PLANS FILE TO SHOW EXISTING RESTAURANT 1-6 BURNER STOVE1 DEEP FRYER 1-3 POT SINK 3 HAND SINK 2 WATER CLOSET AND A URINAL. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00640779-P2
06/07/2022
Filed — Alteration
PLANS FILE TO SHOW EXISTING RESTAURANT 1-6 BURNER STOVE1 DEEP FRYER 1-3 POT SINK 3 HAND SINK 2 WATER CLOSET AND A URINAL. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00640779-P1
02/21/2022
Filed — Alteration
M00637805-I1
02/14/2022
Filed — Alteration
PLANS FILE TO SHOW EXISTING RESTAURANT 1-6 BURNER STOVE1 DEEP FRYER 1-3 POT SINK 3 HAND SINK 2 WATER CLOSET AND A URINAL. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00640779-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDWG SERVICES INC02/07/2023
DOB NOWGeneral ConstructionSigned-offDWG SERVICES INC07/14/2022
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C02/17/2022
1 project · most recent 06/28/2022
Gas Water/Sanitary
FiledStatusContractorScope
06/28/2022Signed-offJL PLUMBING, LLCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/08/2022Mechanical SystemsNANIK MASSANDspecial
10/08/2022FinalKevin McCrayprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026M00640779-I1Request digital key ↗
09/02/2026M00640779-P2Request digital key ↗
09/02/2026M00640779-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00640779-I1Open ↗
09/02/2026M00640779-P1Open ↗
09/02/2026M00637805-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M08017968-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M08017968-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00640779-I1Open ↗
09/02/2026M00640779-P1Open ↗
08/13/2026M08017968-I1Open ↗
Showing 3 of 4 on file for this type