← Back
Walk-up cooperative
312 EAST 50 STREET
MANHATTAN · BIN 1039480
💬 Discuss this project
1900Year Built
4Stories
C6Building Class
R8BZoning
6,913 sfGross Floor Area
8Units
Rent Stabilized56 Open Violations ▸
Walk-up cooperative · Owner of record: 312-314 EAST 50 ST CORP · 3,716 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L & H GENERAL CONSTRUCTION1707/08/2026
312-314 EAST 50 ST CORP403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THEODORE G. RIEPER ARCHITECTS PC509/26/2025
RAS PE CONSULTING ENGINEERS109/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CJS EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L & H GENERAL CONSTRUCTIOGeneral Contractor307/08/2026
ROY B PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THEODORE G RIEPER ARCHITE4447209/26/2025
IP CONCRETE TESTING AND I6252109/10/2025
Building Lifecycle
All (92)Filed (6)Permit Issued (4)Signed Off (2)Violation (60)Inspection (4)Special Inspection (16)
08/11/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2026
Signed off — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-S1
07/22/2026
Signed off — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-I1
04/29/2026
Violation issued (HPD, open)
A
12/10/2025
Permit issued — General Construction
M01201411-I1-GC
11/24/2025
Permit issued — Foundation
M01201411-S2-FO-EA
11/17/2025
Violation issued (HPD, open)
I
10/30/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
10/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Permit issued — Plumbing
M01201411-S1-PL
09/26/2025
Filed — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-P2
09/26/2025
Filed — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-P3
09/26/2025
Special inspection requirement — Interior lighting power
THEODORE RIEPER
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
09/26/2025
Special inspection requirement — Final
THEODORE RIEPER
09/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
THEODORE RIEPER
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
09/26/2025
Special inspection requirement — Lighting controls
THEODORE RIEPER
09/26/2025
Special inspection requirement — Lighting in dwelling units
THEODORE RIEPER
09/10/2025
Filed — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-S2
09/08/2025
Special inspection requirement — Subgrade Inspections
INDARDEO PARBHUNATH
09/08/2025
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
09/08/2025
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
09/05/2025
Special inspection requirement — Final
NAVEEN KUMAR
09/05/2025
Special inspection requirement — Footing and Foundation
INDARDEO PARBHUNATH
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
08/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/04/2025
Violation issued (HPD, open)
A
04/18/2025
Filed — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-P1
04/11/2025
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
04/07/2025
Filed — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-S1
04/07/2025
Permit issued — General Construction
M01201411-I1-GC
04/03/2025
Filed — Alteration
HEREWITH FILING FO-EA PLANS FOR PARTIAL REMOVAL OF EXISTING ROCK IN BASEMENT & ERECT NEW CONCRETE WALL AGAINST THE ROCK. NO OTHER CHANGE IN THIS APPLICATION. THIS JOB IS FILED ON DOB NOW UNDER #M01201411-S2.
M01201411-I1
11/22/2024
Violation issued (HPD, open)
I
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
12/02/2022
Violation issued (HPD, open)
C
12/02/2022
Violation issued (HPD, open)
C
12/02/2022
Violation issued (HPD, open)
B
12/02/2022
Violation issued (HPD, open)
B
12/02/2022
Violation issued (HPD, open)
B
11/16/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2022
Violation issued (HPD, open)
B
06/30/2022
Violation issued (HPD, open)
C
06/23/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
B
02/15/2022
Violation issued (HPD, open)
B
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, open)
C
02/15/2022
Violation issued (HPD, open)
B
02/15/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
B
12/27/2021
Violation issued (HPD, closed)
B
12/27/2021
Violation issued (HPD, open)
C
12/27/2021
Violation issued (HPD, open)
B
12/27/2021
Violation issued (HPD, closed)
C
08/20/2021
Violation issued (HPD, open)
A
07/27/2021
Violation issued (HPD, open)
C
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offL & H GENERAL CONSTRUCTIO12/10/2025
DOB NOWFoundationSigned-offL & H GENERAL CONSTRUCTIO11/24/2025
DOB NOWPlumbingSigned-offROY B PLUMBING & HEATING10/03/2025
DOB NOWGeneral ConstructionSigned-offL & H GENERAL CONSTRUCTIO04/07/2025
1 project · most recent 09/26/2025
Water/Sanitary
FiledStatusContractorScope
09/26/2025Signed-offROY B PLUMBING & HEATINGWater/Sanitary
1 project · most recent 09/26/2025
FiledStatusContractorScope
09/26/2025Signed-offL & H GENERAL CONSTRUCTIO2 scope_items
1 project · most recent 09/26/2025
Earthwork Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/26/2025Signed-offL & H GENERAL CONSTRUCTIOEarthwork, Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/11/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/30/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
10/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/26/2025Interior lighting powerTHEODORE RIEPERenergy_progress
09/26/2025Energy Code Compliance InspectionsTHEODORE RIEPERprogress
09/26/2025Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
09/26/2025FinalTHEODORE RIEPERprogress
09/26/2025Fire-Resistance Rated ConstructionTHEODORE RIEPERprogress
09/26/2025Energy Code Compliance InspectionsTHEODORE RIEPERprogress
09/26/2025Lighting controlsTHEODORE RIEPERenergy_progress
09/26/2025Lighting in dwelling unitsTHEODORE RIEPERenergy_progress
09/08/2025Subgrade InspectionsINDARDEO PARBHUNATHspecial
09/08/2025Concrete - Cast-In-PlaceINDARDEO PARBHUNATHspecial
09/08/2025Post-installed AnchorsINDARDEO PARBHUNATHspecial
09/08/2025Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
09/05/2025FinalNAVEEN KUMARprogress
09/05/2025Footing and FoundationINDARDEO PARBHUNATHprogress
08/22/2025Energy Code Compliance InspectionsTHEODORE RIEPERprogress
04/11/2025Energy Code Compliance InspectionsTHEODORE RIEPERprogress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026M01201411-P2Request digital key ↗
08/21/2026M01201411-S2Request digital key ↗
08/21/2026M01201411-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M01201411-P3Open ↗
09/01/2026M01201411-I1Open ↗
09/01/2026M01201411-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026M01201411-P1Open ↗
08/21/2026M01201411-S1Open ↗
08/21/2026M01201411-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M01201411-I1Open ↗
08/26/2026M01201411-S2Open ↗
08/26/2026M01201411-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01201411-S2Open ↗