← Back
Office only, 2-6 stories
18 EAST 79 STREET
MANHATTAN · BIN 1041886
💬 Discuss this project
1909Year Built
5Stories
O2Building Class
C5-1Zoning
12,919 sfGross Floor Area
1Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Office only, 2-6 stories · Owner of record: ACQUAVELLA GALLERIES INC · 3,074 sf lot · 4.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 5Under Construction22p · 3 filings · 20 docs
Floor 4Under Construction20p · 2 filings · 20 docs
Floor 34p · 1 filing · 15 docs
Floor 26p · 2 filings · 18 docs
Floor 1
Cellar3p · 2 filings · 20 docs
Sub-Cellar1p · 1 filing · 10 docs
1 job · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
1 job · most recent 04/01/2026
FiledStatusContractorScope
04/01/2026Permit IssuedFSM LAPENNA HVAC, INC2 scope_items
Building Lifecycle
All (73)Filed (9)Permit Issued (8)Signed Off (4)Violation (17)Objection (12)Special Inspection (23)
06/22/2026
Permit issued — Mechanical Systems
M01374512-S1-MS
05/19/2026
Permit issued — Structural
M01374512-S2-ST
05/19/2026
Permit issued — General Construction
M01374512-I1-GC
04/30/2026
Objection resolved — Resolved
04/16/2026
Objection raised — Cost
04/08/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/07/2026
Objection resolved — Addressed
04/06/2026
Objection raised — Scope
04/05/2026
Objection raised — Energy
04/05/2026
Objection raised — Scope
04/05/2026
Objection raised — Scope
04/04/2026
Objection raised — Scope
04/04/2026
Objection raised — Cost
04/01/2026
Filed — Alteration
STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01374512-I1
04/01/2026
Filed — Alteration
STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01374512-S1
04/01/2026
Filed — Alteration
STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01374512-S2
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/18/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/18/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
03/18/2026
Special inspection requirement — Final
EUGENE BIFULCO
06/04/2025
Signed off — Alteration
General mechanical modifications for the removal, relocation and replacement of HVAC units and ductwork on the 3rd, 4th 5th, and Roof floors at 18 East 79th Street.
M00737309-I1
10/02/2024
Signed off — Alteration
HEREWITH FILING INTERIOR RENOVATIONS TO EXISTING SHOWROOM SPACE ON THE SECOND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCPANCY.
M01027856-I1
09/04/2024
Permit issued — General Construction
M01027856-I1-GC
06/12/2024
Permit issued — General Construction
M01027856-I1-GC
05/28/2024
Filed — Alteration
HEREWITH FILING INTERIOR RENOVATIONS TO EXISTING SHOWROOM SPACE ON THE SECOND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCPANCY.
M01027856-I1
03/29/2024
Special inspection requirement — Final
Annabelle Selldorf
03/15/2024
Signed off — Alteration
General mechanical modifications for the removal, relocation and replacement of HVAC units and ductwork on the sub-basement, basement, 1st and 2nd floors at 18 East 79th Street.
M00375786-I1
11/20/2023
Signed off — Alteration
Mechanical Modifications to Ductwork and Air Condensing Units located in the Sub Cellar, Cellar and 004-ROF Floors, . As per plans filed herewith. No change to use, occupancy or egress.
M00876519-I1
11/16/2023
Special inspection requirement — Final
JACK GREEN
11/16/2023
Special inspection requirement — Mechanical Systems
JACK GREEN
11/15/2023
Filed — Alteration
Mechanical Modifications to Ductwork and Air Condensing Units located in the Sub Cellar, Cellar and 004-ROF Floors, . As per plans filed herewith. No change to use, occupancy or egress.
M00876519-P1
07/08/2023
Permit issued — Mechanical Systems
M00876519-I1-MS
06/01/2023
Filed — Alteration
Mechanical Modifications to Ductwork and Air Condensing Units located in the Sub Cellar, Cellar and 004-ROF Floors, . As per plans filed herewith. No change to use, occupancy or egress.
M00876519-I1
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
05/04/2023
Special inspection requirement — Mechanical Systems
JACK GREEN
05/04/2023
Special inspection requirement — Heating Systems
JACK GREEN
05/04/2023
Special inspection requirement — Final
JACK GREEN
05/03/2023
Filed — Alteration
General mechanical modifications for the removal, relocation and replacement of HVAC units and ductwork on the 3rd, 4th 5th, and Roof floors at 18 East 79th Street.
M00737309-P1
03/23/2023
Special inspection requirement — Final
JACK GREEN
03/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
03/23/2023
Special inspection requirement — Heating Systems
JACK GREEN
03/23/2023
Special inspection requirement — Mechanical Systems
JACK GREEN
11/17/2022
Permit issued — Mechanical Systems
M00737309-I1-MS
11/10/2022
Filed — Alteration
General mechanical modifications for the removal, relocation and replacement of HVAC units and ductwork on the 3rd, 4th 5th, and Roof floors at 18 East 79th Street.
M00737309-I1
04/28/2021
Permit issued — Mechanical Systems
M00375786-I1-MS
03/16/2021
Filed — Alteration
General mechanical modifications for the removal, relocation and replacement of HVAC units and ductwork on the sub-basement, basement, 1st and 2nd floors at 18 East 79th Street.
M00375786-I1
07/29/2020
Special inspection requirement — HVAC and service water heating system controls
JACK GREEN
07/29/2020
Special inspection requirement — Shutoff dampers
JACK GREEN
07/29/2020
Special inspection requirement — HVAC and service water heating equipment
JACK GREEN
07/29/2020
Special inspection requirement — HVAC insulation and sealing
JACK GREEN
07/24/2020
Special inspection requirement — Mechanical Systems
JACK GREEN
07/24/2020
Special inspection requirement — Final
JACK GREEN
07/24/2020
Special inspection requirement — Heating Systems
JACK GREEN
07/24/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
08/01/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/27/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/12/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/20/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 73 events.
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES L403/21/2026
JM ZONING, LLC.103/21/2026
RIZZO GROUP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EUROSTRUCT INCGeneral Contractor407/08/2026
M. LAPENNA REFRIGERATIONGeneral Contractor307/08/2026
FSM LAPENNA HVAC, INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544304/01/2026
JACK GREEN ASSOCIATES422511/15/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedFSM LAPENNA HVAC, INC06/22/2026
DOB NOWStructuralPermit IssuedEUROSTRUCT INC05/19/2026
DOB NOWGeneral ConstructionPermit IssuedEUROSTRUCT INC05/19/2026
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC09/04/2024
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC06/12/2024
DOB NOWMechanical SystemsSigned-offFSM LAPENNA HVAC, INC07/08/2023
DOB NOWMechanical SystemsSigned-offM. LAPENNA REFRIGERATION11/17/2022
DOB NOWMechanical SystemsSigned-offM. LAPENNA REFRIGERATION04/28/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/19/2012
BISOTISSUEDRD RICE CONSTRUCTION INC05/19/1997
BISEQISSUEDATLANTIC SCAFFOLDING11/01/1996
BISPLRE-ISSUEDHASSEL PLUMBING08/12/1996
BISOTRE-ISSUEDR D RICE CONST.INC.07/30/1996
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/25/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/18/2026FinalEUGENE BIFULCOprogress
03/18/2026Mechanical SystemsEUGENE BIFULCOspecial
03/18/2026FinalEUGENE BIFULCOprogress
03/29/2024FinalAnnabelle Selldorfprogress
11/16/2023FinalJACK GREENprogress
11/16/2023Mechanical SystemsJACK GREENspecial
05/04/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
05/04/2023Mechanical SystemsJACK GREENspecial
05/04/2023Heating SystemsJACK GREENspecial
05/04/2023FinalJACK GREENprogress
03/23/2023FinalJACK GREENprogress
03/23/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
03/23/2023Heating SystemsJACK GREENspecial
03/23/2023Mechanical SystemsJACK GREENspecial
07/29/2020HVAC and service water heating system controls JACK GREENenergy_progress
07/29/2020Shutoff dampersJACK GREENenergy_progress
07/29/2020HVAC and service water heating equipment JACK GREENenergy_progress
07/29/2020HVAC insulation and sealing JACK GREENenergy_progress
07/24/2020Mechanical SystemsJACK GREENspecial
07/24/2020FinalJACK GREENprogress
07/24/2020Heating SystemsJACK GREENspecial
07/24/2020Fire-Resistant Penetrations and JointsJACK GREENspecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/01/2026M00737309-P1Request digital key ↗
09/01/2026M00737309-I1Request digital key ↗
08/31/2026M00876519-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00375786-I1Request digital key ↗
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit9
08/13/2026M00737309-P1Open ↗
08/13/2026M00375786-I1Open ↗
08/13/2026M00876519-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
07/20/2012121146820Open ↗
▸BISWORK PERMIT APPLICATION1
07/20/2012121146820Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026M01374512-I1Open ↗
09/01/2026M01027856-I1Open ↗
08/31/2026M00737309-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M00737309-P1Open ↗
09/01/2026M00737309-I1Open ↗
08/31/2026M00876519-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01374512-I1Open ↗
08/31/2026M00737309-P1Open ↗
08/31/2026M00375786-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/03/2012121146820Open ↗
12/03/2012121146820Open ↗
07/20/2012121146820Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/20/2012121146820Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/20/2012121146820Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/01/2026M00737309-I1Open ↗
09/01/2026M00737309-P1Open ↗
08/31/2026M00876519-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/20/2012121146820Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00375786-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/03/2012121146820Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/03/2012121146820Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/20/2012121146820Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/20/2012121146820Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M00737309-P1Open ↗
08/13/2026M00737309-I1Open ↗