← Back
City residence, one family
127 EAST 61 STREET
MANHATTAN · BIN 1042012
💬 Discuss this project
1899Year Built
5Stories
A4Building Class
R8BZoning
5,974 sfGross Floor Area
1Units
6 Open Violations ▸
City residence, one family · 1,858 sf lot · 3.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 12 docs
Bulkhead3p · 1 filing · 12 docs
Floor 51p · 1 filing · 12 docs
Floor 4Under Construction5p · 2 filings · 16 docs
Floor 3Under Construction4p · 2 filings · 16 docs
Floor 2Under Construction4p · 2 filings · 16 docs
Floor 1Under Construction3p · 2 filings · 16 docs
CellarUnder Construction6p · 2 filings · 16 docs
Sub-BasementUnder Construction2p · 1 filing · 4 docs
2 jobs · most recent 09/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/14/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NLHZ 48,000 BTU · Condensing Unit ×2
MXZ-SM60NL 60,000 BTU · Condensing Unit ×2
03/30/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P15NMAU-E4 424 CFM · Vrf Indoor ×7
PUMY-P48NKMU3 48,000 BTU · Vrf Outdoor ×2
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×2
PKFY-P12NLMU-ER1.TH 297 CFM · Vrf Indoor ×1
PVFY-P24NAMU-E1 735 CFM · Vrf Indoor ×1
PVFY-P24NAMU-E4 735 CFM · Vrf Indoor ×1
PVFY-P36NAMU-E1 1,095 CFM · Vrf Indoor ×1
Ventilation
Loren Cook ERV-1500 900 CFM · Erv ×1
2 jobs · most recent 09/14/2026
Sprinkler System
FiledStatusContractorScope
09/14/2026——Sprinkler System
03/30/2026——Sprinkler System
2 jobs · most recent 09/14/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
09/14/2026——Gas, Storm, Water/Sanitary
03/30/2026——Gas, Water/Sanitary
2 jobs · most recent 09/14/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
09/14/2026——Steel, Concrete, Masonry, Wood
03/30/2026——Steel, Concrete, Masonry
Building Lifecycle
All (61)Filed (7)Permit Issued (1)Violation (8)Objection (15)Special Inspection (30)
09/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Foundation and Structural work for horizontal enlargement, mild vertical enlargement and work though in conjunction with ALT-CO as New Building with existing Elements to Remain, complete renovation into single family dwelling.
M01449867-S4
09/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Foundation and Structural work for horizontal enlargement, mild vertical enlargement and work though in conjunction with ALT-CO as New Building with existing Elements to Remain, complete renovation into single family dwelling.
M01449867-I1
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/11/2026
Special inspection requirement — Energy Code Compliance Inspections
09/10/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
09/10/2026
Special inspection requirement — Sprayed fire-resistant materials
09/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
09/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/10/2026
Special inspection requirement — Fenestration air leakage
09/10/2026
Special inspection requirement — Air barrier continuity plan testing
09/10/2026
Special inspection requirement — Insulation placement and R values
09/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/10/2026
Special inspection requirement — Air barrier - visual inspection
09/10/2026
Special inspection requirement — Fenestration areas
09/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/17/2026
Permit issued — General Construction
M01440493-I1-GC
08/04/2026
Filed — Alteration
Removal and reinstallation of interior non-load bearing partitions and wall, floor and ceiling finishes in cellar, basement, 001-004, for cosmetic renovation. No change in occupancy use or egress.
M01440493-I1
08/04/2026
Special inspection requirement — Final
JASON ALLEN
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/13/2026
Filed — Alteration
Removal of interior non-load bearing partitions and wall, floor and ceiling finishes in cellar, basement, 001-004. No change in occupancy use or egress.
M01427811-I1
07/08/2026
Special inspection requirement — Final
JASON ALLEN
06/01/2026
Objection raised — Admin
06/01/2026
Objection raised — Cost
05/18/2026
Objection resolved — Resolved
05/18/2026
Objection resolved — Resolved
05/18/2026
Objection resolved — Resolved
04/30/2026
Objection resolved — Resolved
04/29/2026
Violation issued (HPD, open)
A
04/21/2026
Objection raised — Other
04/21/2026
Objection raised — Scope
04/21/2026
Objection raised — Scope
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Zoning
04/21/2026
Objection raised — Cost
03/30/2026
Filed — Alteration CO
Installation of new mechanical equipment and units on cellar, first through fifth floors as well as roof and roof bulkhead for new one family dwelling.
M01378132-S2
03/30/2026
Filed — Alteration CO
Installation of new mechanical equipment and units on cellar, first through fifth floors as well as roof and roof bulkhead for new one family dwelling.
M01378132-S1
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Filed — Alteration CO
Installation of new mechanical equipment and units on cellar, first through fifth floors as well as roof and roof bulkhead for new one family dwelling.
M01378132-I1
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
JASON ALLEN
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
JASON ALLEN
03/25/2026
Special inspection requirement — Air barrier continuity plan testing
JASON ALLEN
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JASON ALLEN
03/25/2026
Special inspection requirement — Fenestration air leakage
JASON ALLEN
03/25/2026
Special inspection requirement — Fenestration areas
JASON ALLEN
03/25/2026
Special inspection requirement — Insulation placement and R values
JASON ALLEN
03/25/2026
Special inspection requirement — Air barrier - visual inspection
JASON ALLEN
03/25/2026
Special inspection requirement — Mechanical Systems
03/25/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JASON ALLEN
03/25/2026
Special inspection requirement — Final
Kian Moozar
03/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
Kian Moozar
11/17/2025
Violation issued (HPD, open)
I
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/1993
Violation issued (HPD, open)
B
10/06/1987
Violation issued (HPD, open)
B
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E61 PARTNERS209/21/2026
AMIRIAN GROUP508/28/2026
127 EAST 61ST PROPERTY OWNER LLC103/22/2026
WALLACK MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MQ CONSULTING309/14/2026
WORKSHOP DESIGN+ARCHITECTURE,PLLC409/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & G GEKON INCGeneral Contractor108/18/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedK & G GEKON INC08/17/2026
BISEQISSUEDRENNON CONSTRUCTION CORP05/10/2016
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
09/11/2026Fire-Resistant Penetrations and Joints—special
09/11/2026Energy Code Compliance Inspections—progress
09/10/2026Mastic and Intumescent Fire-resistant Coatings—special
09/10/2026Sprayed fire-resistant materials—special
09/10/2026Structural Stability – Alterations of existing buildings—special
09/10/2026Energy Code Compliance Inspections—progress
09/10/2026Fire-Resistance Rated Construction—progress
09/10/2026Fenestration air leakage—energy_progress
09/10/2026Air barrier continuity plan testing—energy_progress
09/10/2026Insulation placement and R values—energy_progress
09/10/2026Fenestration and door U-factor and product ratings—energy_progress
09/10/2026Air barrier - visual inspection—energy_progress
09/10/2026Fenestration areas—energy_progress
09/10/2026Exterior Insulation and Finish Systems (EIFS)—special
09/10/2026Fire-Resistant Penetrations and Joints—special
08/04/2026FinalJASON ALLENprogress
07/08/2026FinalJASON ALLENprogress
03/30/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Energy Code Compliance InspectionsJASON ALLENprogress
03/25/2026Fire-Resistance Rated ConstructionJASON ALLENprogress
03/25/2026Air barrier continuity plan testingJASON ALLENenergy_progress
03/25/2026Fenestration and door U-factor and product ratingsJASON ALLENenergy_progress
03/25/2026Fenestration air leakageJASON ALLENenergy_progress
03/25/2026Fenestration areasJASON ALLENenergy_progress
03/25/2026Insulation placement and R valuesJASON ALLENenergy_progress
Latest 25 of 38.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/15/2026M01449867-S5Request digital key ↗
09/15/2026M01449867-S4Request digital key ↗
09/15/2026M01449867-S3Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/20/2016122775531Open ↗
▸BISWORK PERMIT APPLICATION1
05/23/2016122775531Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
09/15/2026M01449867-I1Open ↗
08/13/2026M01378132-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/15/2026M01449867-I1Open ↗
09/15/2026M01449867-S2Open ↗
09/15/2026M01449867-S5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01449867-S1Open ↗
09/23/2026M01449867-S2Open ↗
09/03/2026M01378132-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M01449867-S2Open ↗
08/30/2026M01378132-S3Open ↗
08/23/2026M01440493-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/29/2016122775531Open ↗
05/20/2016122775531Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/20/2016122775531Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/20/2016122775531Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/23/2016122775531Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/16/2026M01440493-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/29/2016122775531Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/29/2016122775531Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/20/2016122775531Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial3
09/15/2026M01449867-S2Open ↗
09/15/2026M01449867-I1Open ↗
08/13/2026M01378132-I1Open ↗
▸DOB NOWPlot Diagram3
08/18/2026M01378132-S4Open ↗
08/18/2026M01378132-S3Open ↗
08/13/2026M01378132-I1Open ↗