← Back
Primarily 5-6 family with 1 store or office
156 EAST 64 STREET
MANHATTAN · BIN 1042114
💬 Discuss this project
1910Year Built
5Stories
S5Building Class
C1-8XZoning
5,339 sfGross Floor Area
6Units
Rent Stabilized9 Open Violations 7 unresolved · 2 paperwork only ▸
Primarily 5-6 family with 1 store or office · Owner of record: EK ASSOCIATES, L.L.C. · 1,367 sf lot · 3.91 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar3p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C O ROSE ASSOCIATES707/08/2026
EK ASSOCIATES, L.L.C.203/22/2026
E K ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC201/23/2025
RICHARD KOENIGSBERG104/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROACTIVE BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STANDARD PLBG SVS LLCPlumbing207/08/2026
BUKOFSER, RElectrical103/21/2026
DERRICK RAMDEENElectrical103/21/2026
GARCIA, JUSTINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746201/23/2025
S&S CONCRETE & SOIL TESTI1008104/21/2023
Building Lifecycle
All (56)Filed (3)Permit Issued (2)Violation (39)Inspection (4)Special Inspection (8)
09/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/18/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/28/2025
Permit issued — Boiler Equipment
M01154447-I1-BE
01/28/2025
Permit issued — Plumbing
M01154447-S1-PL
01/23/2025
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01154447-S1
01/23/2025
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01154447-I1
01/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
01/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
01/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
01/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
01/23/2025
Special inspection requirement — Maintenance information
Stephen Shishko
01/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
12/16/2024
Violation issued (HPD, closed)
C
12/16/2024
Violation issued (HPD, closed)
C
12/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
04/01/2024
Violation issued (HPD, closed)
A
04/21/2023
Filed — Alteration
M00845570-I1
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2016
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
10/12/2000
Violation issued (HPD, closed)
B
10/12/2000
Violation issued (HPD, closed)
B
10/12/2000
Violation issued (HPD, closed)
C
10/12/2000
Violation issued (HPD, closed)
A
10/12/2000
Violation issued (HPD, closed)
B
10/12/2000
Violation issued (HPD, closed)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/1995
Violation issued (ECB, open)
Construction
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/1994
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/1993
Violation issued (HPD, open)
B
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/1990
Violation issued (ECB, open)
Construction
07/05/1989
Violation issued (HPD, closed)
B
07/05/1989
Violation issued (HPD, closed)
B
07/05/1989
Violation issued (HPD, closed)
B
07/05/1989
Violation issued (HPD, closed)
A
07/05/1989
Violation issued (HPD, open)
B
07/05/1989
Violation issued (HPD, closed)
B
06/27/1989
Violation issued (HPD, open)
B
06/27/1989
Violation issued (HPD, closed)
A
06/27/1989
Violation issued (HPD, closed)
A
06/27/1989
Violation issued (HPD, open)
B
06/27/1989
Violation issued (HPD, open)
B
01/09/1988
Violation issued (HPD, closed)
B
01/09/1988
Violation issued (HPD, closed)
B
01/09/1988
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offA&H PLUMBING,LLC01/28/2025
DOB NOWPlumbingSigned-offA&H PLUMBING,LLC01/28/2025
BISPLISSUEDFLYTIGER P & H LTD01/27/2005
BISFPISSUEDCHIEF FIRE PREV MECH. CORP04/12/2004
BISPLISSUEDSCARPONI&SON PLBG&HTG COR02/25/2004
BISMHISSUEDCALICOL REST MAINT. LLC09/04/2003
BISFPISSUEDIDEAL FIRE CONTROL, INC.04/10/2002
BISPLISSUEDAMOK INC05/21/1998
BIS—ISSUEDBUCKINGHAM TRADING PARTNE05/14/1998
BISPLISSUEDMAGOR PLUMBING & HEATING12/26/1997
BISOTISSUEDGOOD LUCK CONSTRUCTION INC12/11/1997
1 project · most recent 01/23/2025
Gas
FiledStatusContractorScope
01/23/2025Signed-offSTANDARD PLBG SVS LLCGas
2 projects · most recent 08/26/2025
Boiler Controls
FiledStatusContractorScope
08/26/2025CompleteSNB ELECTRICAL CONTNG CORBoiler Controls
12/28/2024Permit IssuedCOUNTY ELECL CONTRACTOR IBoiler Controls
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/23/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/23/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/23/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/23/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/23/2025Maintenance informationStephen Shishkoenergy_progress
01/23/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
12/11/2024Tenant Protection Plan ComplianceStephen Shishkospecial
12/11/2024Tenant Protection Plan ComplianceStephen Shishkospecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026M00845570-I1Request digital key ↗
08/25/2026M01154447-S1Request digital key ↗
08/25/2026M01154447-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M01154447-I1Open ↗
09/23/2026M01154447-I1Open ↗
09/23/2026M01154447-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026M00845570-I1Open ↗
08/25/2026M01154447-S1Open ↗
08/25/2026M01154447-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01154447-I1Open ↗
08/23/2026M01154447-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00845570-I1Open ↗
08/25/2026M01154447-I1Open ↗
08/25/2026M01154447-S1Open ↗