← Back
Elevator apt, semi-fireproof without stores
253 EAST 61 STREET
MANHATTAN · BIN 1043819
💬 Discuss this project
1941Year Built
6Stories
D1Building Class
R8BZoning
39,510 sfGross Floor Area
48Units
Elevator apt, semi-fireproof without stores · Owner of record: CROYDON ESTATES, INC · 9,675 sf lot · 4.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HALCYON CONSTRUCTION MGM109/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMON JIANG107/07/2026
ADB ASSOCIATES105/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HALCYON CONST MGMT LLCGeneral Contractor209/29/2026
Building Lifecycle
All (25)Filed (2)Permit Issued (2)Objection (4)Special Inspection (17)
09/28/2026
Permit issued — General Construction
M01392804-I1-GC
09/28/2026
Permit issued — Construction Fence
M01392804-S3-FN
07/07/2026
Filed — Alteration
Proposed construction of slab on grade replacement foundation wall bench and replacement of steel post in conjunction with M01392804
M01426831-I1
07/06/2026
Special inspection requirement — Structural Steel - Details
07/06/2026
Special inspection requirement — Subgrade Inspections
07/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/06/2026
Special inspection requirement — Final
07/06/2026
Special inspection requirement — Footing and Foundation
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/06/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
07/01/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/27/2026
Objection raised — Scope
05/27/2026
Objection raised — Scope
05/05/2026
Filed — Alteration
Proposed fence at 253 E 61 Street
M01392804-I1
04/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/28/2026
Special inspection requirement — Final
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/27/2026
Special inspection requirement — Fenestration areas
04/27/2026
Special inspection requirement — Air barrier - visual inspection
04/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/27/2026
Special inspection requirement — Fenestration air leakage
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHALCYON CONST MGMT LLC09/28/2026
DOB NOWConstruction FencePermit IssuedHALCYON CONST MGMT LLC09/28/2026
BISEQISSUEDSTEEL SYSTEMS LLC10/04/2012
BISEQISSUEDSTEEL SYSTEMS LLC10/01/2012
1 project · most recent 07/07/2026
FiledStatusContractorScope
07/07/2026——1 scope_items
1 project · most recent 05/05/2026
Fence
FiledStatusContractorScope
05/05/2026Permit IssuedHALCYON CONST MGMT LLCFence
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/06/2026Structural Steel - Details—special
07/06/2026Subgrade Inspections—special
07/06/2026Structural Steel - High Strength Bolting—special
07/06/2026Final—progress
07/06/2026Footing and Foundation—progress
07/06/2026Structural Stability – Alterations of existing buildings—special
07/06/2026Subsurface Investigations (Borings/Test Pits)—special
07/06/2026Concrete - Cast-In-Place—special
04/29/2026Structural Stability – Alterations of existing buildings—special
04/28/2026Final—progress
04/28/2026Energy Code Compliance Inspections—progress
04/28/2026Fire-Resistance Rated Construction—progress
04/27/2026Fenestration areas—energy_progress
04/27/2026Air barrier - visual inspection—energy_progress
04/27/2026Fenestration and door U-factor and product ratings—energy_progress
04/27/2026Fenestration air leakage—energy_progress
04/27/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026M01426831-I1Request digital key ↗
08/15/2026M01392804-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
10/02/2012121382039Open ↗
10/02/2012121382048Open ↗
▸BISWORK PERMIT APPLICATION2
10/05/2012121382039Open ↗
10/02/2012121382048Open ↗
▸Seals & Professional Certifications11
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/28/2016121382048Open ↗
10/28/2016121382039Open ↗
10/02/2012121382039Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/29/2026M01392804-S3Open ↗
08/17/2026M01392804-I1Open ↗
08/16/2026M01426831-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/02/2012121382039Open ↗
10/02/2012121382048Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/02/2012121382039Open ↗
10/02/2012121382048Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026M01426831-I1Open ↗
08/15/2026M01392804-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/02/2012121382048Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/16/2026M01426831-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026M01426831-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026M01426831-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/28/2016121382048Open ↗
10/28/2016121382039Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/02/2012121382039Open ↗
10/02/2012121382048Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/02/2012121382039Open ↗
10/02/2012121382048Open ↗