Elevator apt, fireproof without stores
351 EAST 61 STREET
MANHATTAN · BIN 1044248
💬 Discuss this project
1999Year Built
15Stories
D3Building Class
C2-8Zoning
56,902 sfGross Floor Area
53Units
LL97 CoveredRent Stabilized17 Open Violations 15 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 351 EAST 61ST STREET · 5,582 sf lot · 10.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 6 docs
Floor 153p · 2 filings · 6 docs
Floor 144p · 2 filings · 6 docs
Floor 134p · 2 filings · 6 docs
Floor 122p · 1 filing · 3 docs
Floor 112p · 1 filing · 3 docs
Floor 102p · 1 filing · 3 docs
Floor 92p · 1 filing · 3 docs
Floor 82p · 1 filing · 3 docs
Floor 72p · 1 filing · 3 docs
Floor 62p · 1 filing · 3 docs
Floor 52p · 1 filing · 3 docs
Floor 42p · 1 filing · 3 docs
Floor 32p · 1 filing · 3 docs
Floor 22p · 1 filing · 3 docs
Floor 113p · 4 filings · 20 docs
Cellar6p · 4 filings · 14 docs
1 job · most recent 11/06/2025
Heating Systems Ventilation Systems
FiledStatusContractorScope
11/06/2025——Heating Systems, Ventilation Systems
2 jobs · most recent 11/06/2025
Water/Sanitary Gas
FiledStatusContractorScope
11/06/2025——Gas, Water/Sanitary
03/31/2023Permit IssuedFLUID MECHANICS CORPWater/Sanitary
1 job · most recent 12/31/2019
General Wiring
FiledStatusContractorScope
12/31/2019Permit IssuedPINPOINT ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (148)Filed (7)Permit Issued (3)Facade (FISP) (12)Violation (60)Inspection (2)Objection (34)Special Inspection (30)
08/23/2026
Violation issued (HPD, open)
C
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/06/2026
Objection raised — Admin
04/06/2026
Objection raised — Admin
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
03/01/2026
Violation issued (HPD, closed)
C
01/20/2026
Objection raised — Mechanical
01/20/2026
Objection raised — Plumbing
01/20/2026
Objection raised — Admin
01/20/2026
Objection raised — Energy
01/20/2026
Objection raised — Mechanical
01/20/2026
Objection raised — Mechanical
01/20/2026
Objection raised — Fire_Protection
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/02/2025
Objection raised — Mechanical
12/02/2025
Objection raised — Scope
11/06/2025
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES ON EXISTING ROUGH-IN, MODIFYING EXISTING GAS FOR SPACE HEATING BOILER AND WATER HEATER REPLACMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01214899-I1
11/06/2025
Filed — Alteration
BOILER REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01245338-I1
11/06/2025
Filed — Alteration
BOILER REPLACEMENT AND ASSOCIATED DUCTS AND PIPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01210888-I1
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/14/2025
Violation issued (FDNY_NOV, closed)
09/25/2025
Objection raised — Admin
09/05/2025
Objection resolved — Addressed
09/04/2025
Objection raised — Scope
09/03/2025
Objection resolved — Addressed
09/03/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/08/2025
Objection raised — Energy
07/08/2025
Objection raised — Scope
07/08/2025
Objection raised — Cost
07/08/2025
Objection raised — Scope
06/25/2025
Filed — Alteration
BOILER WORK, HPD AGING IN PLACE ACCESSIBILITY IMPROVEMENT IN LOCALIZED APARTMENTS.REPLACE ROOF INSULATION, WATERPROOFING, FLASHING, SPLASHBLOCK, SCUPPER, RAIN LEADER, ROOF DRAIN. EXISTING STRUCTURALROOF DECK TO REMAIN. NO CHANGE IN USE, EGRESS, OR ZONING.
M01210511-I1
06/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2025
Special inspection requirement — Post-installed Anchors
06/24/2025
Special inspection requirement — Heating Systems
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/24/2025
Special inspection requirement — Maintenance information
06/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
06/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
06/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/28/2025
Violation issued (HPD, closed)
C
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
04/15/2025
Violation issued (FDNY_NOV, closed)
04/15/2025
Special inspection requirement — Post-installed Anchors
04/15/2025
Special inspection requirement — Mechanical Systems
04/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
04/15/2025
Special inspection requirement — Final
04/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Latest 60 of 148 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MET COUNCIL1103/22/2026
351 EAST 61ST STREET303/22/2026
351 EAST 61 ST103/22/2026
351 E 61 ST MET COUNCIL103/22/2026
LAQUILA CONSTRUCTION PINN103/22/2026
THE OWNER OF103/22/2026
351 REALTY603/22/2026
BIG APPLE WRECKING AND CO103/22/2026
351 RELATY COMPANY103/22/2026
WAINLANDS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING311/06/2025
CTA ARCHITECTS106/25/2025
RANDALL P. COLLINS ARCHITECT, PC104/03/2023
GANNETT FLEMING203/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
GREEN LIGHT EXPEDITING LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SJS CONSTRUCTION CO., INC.General Contractor203/21/2026
FLUID MECHANICS CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524304/03/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLUID MECHANICS CORP05/11/2023
DOB NOWGeneral ConstructionPermit IssuedSJS CONSTRUCTION CO., INC04/29/2023
DOB NOWMechanical SystemsSigned-offSJS CONSTRUCTION CO., INC04/28/2023
BISEQISSUEDDAVIS & PARTNERS01/25/2000
BIS—ISSUEDDAVIS & PARTNERS01/25/2000
BISEQISSUEDCOLGATE SCAFFOLDING01/14/2000
BISEQISSUEDCOLGATE SCAFFOLDING01/11/2000
BISBLISSUEDKEY MECHNICAL;11/01/1999
BISPLISSUEDPAR PLUMBING CO. INC.08/30/1999
BISSPRE-ISSUEDS&S FIRE SUPPRESSION SYLSTEMS05/26/1999
BISSDISSUEDPAR PLUMBING CO. INC.05/26/1999
BISEQISSUEDUNITED HOISTING CO05/13/1999
BISEQISSUEDUNITED HOISTING CO05/11/1999
BISPLISSUEDPAR PLUMBING CO. INC.02/25/1999
BISEQRE-ISSUEDDAVIS & PARTNERS02/22/1999
BIS—RE-ISSUEDDAVIS & PARTNERS02/22/1999
BISEQISSUEDHRH CONSTRUCTION CORP12/18/1998
BIS—ISSUEDHRH CONSTRUCTION CORP11/10/1998
BISEQISSUEDHRH CONSTRUCTION CORP11/10/1998
BISEQISSUEDL&B CONSTRUCTION NY INC.`10/29/1998
BISEQISSUEDBIG APPLE WRECKING&CONSTRUCTION10/22/1998
BIS—ISSUEDBIG APPLE WRECKING&CONSTRUCTION10/22/1998
BISEQISSUEDBIG APPLE WRECKING&CONSTRUCTION10/22/1998
BISEQISSUEDAAA MARBLE TILE INC11/14/1991
BISOTISSUEDAAA MARBLE TILE INC11/14/1991
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/24/2025Tenant Protection Plan Compliance—special
06/24/2025Post-installed Anchors—special
06/24/2025Heating Systems—special
06/24/2025Fire-Resistant Penetrations and Joints—special
06/24/2025Maintenance information—energy_progress
06/24/2025HVAC-R and service water heating equipment—energy_progress
06/24/2025HVAC-R and service water piping design and insulation—energy_progress
06/24/2025HVAC-R and service water heating system controls—energy_progress
04/23/2025Fire-Resistant Penetrations and Joints—special
04/23/2025Tenant Protection Plan Compliance—special
04/23/2025Energy Code Compliance Inspections—progress
04/15/2025Post-installed Anchors—special
04/15/2025Mechanical Systems—special
04/15/2025Tenant Protection Plan Compliance—special
04/15/2025Energy Code Compliance Inspections—progress
04/15/2025Final—progress
04/15/2025HVAC-R and service water piping design and insulation—energy_progress
04/15/2025Duct leakage testing, insulation and design—energy_progress
04/15/2025HVAC-R and service water heating system controls—energy_progress
04/15/2025HVAC-R and service water heating equipment—energy_progress
04/15/2025Maintenance information—energy_progress
04/15/2025Chimneys and vents—special
04/15/2025Shutoff dampers—energy_progress
04/15/2025Fire-Resistant Penetrations and Joints—special
04/15/2025Heating Systems—special
Latest 25 of 44.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026M00832460-I1Request digital key ↗
08/31/2026M00829021-I1Request digital key ↗
08/31/2026M00828919-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026M01210511-I1Open ↗
08/21/2026M01245338-I1Open ↗
08/21/2026M01214899-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01210511-I1Open ↗
09/01/2026M00832460-I1Open ↗
08/22/2026M00828919-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00832460-I1Open ↗
09/01/2026M00829021-I1Open ↗
08/22/2026M00828919-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00828919-I1Open ↗
08/13/2026M00829021-I1Open ↗
08/13/2026M00832460-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026M00829021-I1Open ↗
08/13/2026M00828919-I1Open ↗
08/13/2026M00832460-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026M01214899-I1Open ↗
08/13/2026M01245338-I1Open ↗
08/13/2026M01210888-I1Open ↗
Showing 3 of 4 on file for this type