← Back
Three families
342 EAST 69 STREET
MANHATTAN · BIN 1044788
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R8BZoning
—Gross Floor Area
3Units
0 Open Violations
Three families · 2.35 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 342 E 69 ST203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC102/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOURCE ELECTRIC INCElectrical103/22/2026
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341102/03/2025
Building Lifecycle
All (5)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)
04/17/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
M01175434-I1
02/07/2025
Permit issued — Solar
M01175434-I1-SL
02/03/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
M01175434-I1
11/11/2000
Violation issued (ECB, closed)
Construction
11/11/2000
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES02/07/2025
BIS—ISSUEDPERRY GEORGE10/29/2001
BISMHISSUEDDDC SERVICES04/18/2001
BISPLISSUEDDEEM PLUMBING INC03/08/2001
BISOTISSUEDDDC SERVICES12/01/2000
1 project · most recent 04/03/2025
FiledStatusContractorScope
04/03/2025CompleteSOURCE ELECTRIC INC1 meters
Nothing on file for this building.
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026M01175434-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026M01175434-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026M01175434-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01175434-I1Open ↗