← Back
Walk-up cooperative
343 EAST 78 STREET
MANHATTAN · BIN 1045247
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R8BZoning
8,166 sfGross Floor Area
12Units
Rent Stabilized2 Open Violations ▸
Walk-up cooperative · Owner of record: TENANTS OF 343 E 78TH STREET · 2,554 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ERIC GOODMAN REALTY907/08/2026
TENANTS OF 343 E 78TH STREET103/22/2026
SO HOME WORK INC203/22/2026
B H B CONSTRUCTION203/21/2026
TENANT ASSOC OF 343 E 78203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.207/29/2022
ANNA JACHNIK ARCHITECT206/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOHOME WORK INCGeneral Contractor203/21/2026
G.B. & SON, INCPlumbing207/08/2026
RABINDRA RAMGARIBElectrical103/21/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851107/29/2022
ANNA JACHNIK ARCHITECT4202106/10/2021
H. A. BADER CONSULTANTS2332106/10/2021
Building Lifecycle
All (35)Filed (4)Permit Issued (4)Signed Off (4)Violation (5)Inspection (7)Special Inspection (11)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Signed off — Alteration
M00754599-I1
03/24/2023
Signed off — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00755280-I1
03/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/01/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/05/2022
Permit issued — Boiler Equipment
M00754599-I1-BE
08/05/2022
Permit issued — Plumbing
M00755280-I1-PL
07/29/2022
Filed — Alteration
M00754599-I1
07/29/2022
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT GAS BURNER.
M00755280-I1
06/10/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
06/09/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
06/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/09/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/09/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
11/17/2021
Signed off — Alteration
Plumbing work filed in conjunction apartment renovation.
M00535416-I1
11/15/2021
Signed off — Alteration
Plumbing work filed in conjunction apartment renovation.
M00535416-S1
10/15/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/08/2021
Violation issued (ECB, closed)
Construction
07/08/2021
Violation issued (ECB, closed)
Construction
07/02/2021
Permit issued — Plumbing
M00535416-S1-PL
06/29/2021
Permit issued — Mechanical Systems
M00535416-I1-GC-CX
06/14/2021
Filed — Alteration
Plumbing work filed in conjunction apartment renovation.
M00535416-S1
06/10/2021
Filed — Alteration
Plumbing work filed in conjunction apartment renovation.
M00535416-I1
06/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anna Jachnik
06/07/2021
Special inspection requirement — Final
Anna Jachnik
06/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Anna Jachnik
06/07/2021
Special inspection requirement — Lighting in dwelling units
Anna Jachnik
06/07/2021
Special inspection requirement — Mechanical Systems
Howard Bader
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offG.B. & SON, INC08/05/2022
DOB NOWPlumbingSigned-offG.B. & SON, INC08/05/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG07/02/2021
DOB NOWMechanical SystemsSigned-offSOHOME WORK INC06/29/2021
BISOTISSUEDAP-TECH CONTRACTING CORP09/09/2013
BISEQISSUEDB H & B CONSTRUCTION INC06/13/2013
BISMHISSUEDJAMES LEE CONSTRUCTION07/30/2002
BISPLISSUEDMINLAND PLUMBING AND HEAT06/18/2002
BISMHISSUEDJAMES LEE CONSTRUCTION05/31/2002
BISPLISSUEDCALARAY GAS HGHT CORP12/09/1998
BISFBISSUEDFRANK A. ROMEO INC.05/20/1997
2 projects · most recent 08/04/2023
General Wiring
FiledStatusContractorScope
08/04/2023CompleteINDY ELECTRIC CORP.General Wiring
11/15/2021Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/01/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/10/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
06/09/2022Maintenance informationLOUIS ARENAenergy_progress
06/09/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/09/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/09/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/09/2022Heating SystemsLOUIS ARENAspecial
06/07/2021Fire-Resistant Penetrations and JointsAnna Jachnikspecial
06/07/2021FinalAnna Jachnikprogress
06/07/2021Energy Code Compliance InspectionsAnna Jachnikprogress
06/07/2021Lighting in dwelling unitsAnna Jachnikenergy_progress
06/07/2021Mechanical SystemsHoward Baderspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00535416-I1Request digital key ↗
09/03/2026M00535416-S1Request digital key ↗
09/02/2026M00755280-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
09/16/2013121616304Open ↗
06/13/2013140084316Open ↗
06/02/2013140084316Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/02/2013140084316Open ↗
05/14/2013121616304Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M00754599-I1Open ↗
08/23/2026M00535416-I1Open ↗
08/23/2026M00535416-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M00754599-I1Open ↗
08/13/2026M00535416-S1Open ↗
08/13/2026M00535416-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M00754599-I1Open ↗
08/23/2026M00535416-I1Open ↗
08/23/2026M00535416-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/06/2013121616304Open ↗
05/14/2013121616304Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/02/2013140084316Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/14/2013121616304Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/02/2013140084316Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/02/2013140084316Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00755280-I1Open ↗
08/13/2026M00535416-I1Open ↗
08/13/2026M00535416-S1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/06/2013121616304Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00535416-I1Open ↗
08/13/2026M00754599-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/14/2013121616304Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00754599-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/02/2013140084316Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
05/14/2013121616304Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/14/2013121616304Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/06/2013121616304Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/06/2013121616304Open ↗
05/14/2013121616304Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/02/2013140084316Open ↗
▸BISEFILING COVER SHEET1
05/14/2013121616304Open ↗