← Back
Walk-up cooperative
406 EAST 73 STREET
MANHATTAN · BIN 1045860
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R8BZoning
10,445 sfGross Floor Area
9Units
Rent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: 406 E 73 ST APTS INC · 2,554 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 4
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 1
Basement3p · 1 filing · 20 docs
Sub-Basement3p · 1 filing · 20 docs
1 job · most recent 03/06/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2026Signed-offSUPER COOL HVAC, LLCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Daikin 4MXS36RMVJU 4MXS36RMVJU 4MXS36RMVJU 4MXS36RMVJU 36,000 BTU · Condensing Unit ×16
5MXS48TVJU 48,000 BTU · Condensing Unit ×2
Heating
Stelpro SOA2002W 8,922 BTU · Electric Heater ×2
1 job · most recent 03/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/06/2026Permit IssuedAMC PLBG, HTG & CLNG, INCGas, Water/Sanitary
1 job · most recent 05/09/2025
General Wiring
FiledStatusContractorScope
05/09/2025CompleteT.M.T ELECTRIC INCGeneral Wiring
Building Lifecycle
All (51)Filed (4)Permit Issued (2)Signed Off (1)Violation (15)Inspection (3)Objection (8)Special Inspection (18)
07/13/2026
Signed off — Alteration
NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY.
M00982572-I1
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — Maintenance information
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — Final
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — Mechanical Systems
RAFAEL FIGUEROA
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFAEL FIGUEROA
04/01/2026
Objection resolved — Addressed
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
RAFAEL FIGUEROA
03/19/2026
Objection resolved — Addressed
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Scope
03/06/2026
Filed — Alteration
NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY.
M00982572-P3
03/06/2026
Filed — Alteration
NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY.
M00982572-P4
03/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/05/2026
Special inspection requirement — Maintenance information
RAFAEL FIGUEROA
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RAFAEL FIGUEROA
03/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
RAFAEL FIGUEROA
03/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
RAFAEL FIGUEROA
03/05/2026
Special inspection requirement — Final
RAFAEL FIGUEROA
03/05/2026
Special inspection requirement — Mechanical Systems
RAFAEL FIGUEROA
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFAEL FIGUEROA
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/30/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2024
Permit issued — Plumbing
M00982572-S1-PL
03/13/2024
Permit issued — Mechanical Systems
M00982572-I1-MS
02/20/2024
Objection resolved — Addressed
02/08/2024
Objection resolved — Addressed
02/07/2024
Objection raised — Zoning
02/07/2024
Objection raised — Admin
01/26/2024
Filed — Alteration
NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY.
M00982572-I1
01/26/2024
Filed — Alteration
NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY.
M00982572-S1
08/30/2022
Violation issued (ECB, open)
Boilers
04/01/2021
Violation issued (HPD, closed)
A
03/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2017
Violation issued (ECB, closed)
Construction
10/01/2015
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2008
Violation issued (HPD, open)
C
07/03/2008
Violation issued (HPD, closed)
B
07/03/2008
Violation issued (HPD, open)
C
07/03/2008
Violation issued (HPD, open)
C
07/03/2008
Violation issued (HPD, open)
B
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLOCPOWER504/09/2026
406 E 73 ST APTS INC203/22/2026
406 EAST 73RD STREET APTS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLECTIF ENGINEERING PLLC403/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER COOL HVAC, LLCGeneral Contractor104/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLLECTIF ENGINEERING, PL7799303/06/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC11/26/2024
DOB NOWMechanical SystemsSigned-offSUPER COOL HVAC, LLC03/13/2024
BISPLISSUEDWASOFF PLBG & UTILITY CO04/30/2018
BISFPISSUEDSENTINEL FIRE CONTROL,INC,06/29/1992
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/14/2026Tenant Protection Plan ComplianceRAFAEL FIGUEROAspecial
04/14/2026HVAC-R and service water heating equipmentRAFAEL FIGUEROAenergy_progress
04/14/2026Maintenance informationRAFAEL FIGUEROAenergy_progress
04/14/2026HVAC-R and service water heating system controlsRAFAEL FIGUEROAenergy_progress
04/14/2026HVAC-R and service water piping design and insulationRAFAEL FIGUEROAenergy_progress
04/14/2026FinalRAFAEL FIGUEROAprogress
04/14/2026Mechanical SystemsRAFAEL FIGUEROAspecial
04/14/2026Fire-Resistant Penetrations and JointsRAFAEL FIGUEROAspecial
03/31/2026Tenant Protection Plan ComplianceRAFAEL FIGUEROAspecial
03/06/2026Tenant Protection Plan Compliance—special
03/05/2026Maintenance informationRAFAEL FIGUEROAenergy_progress
03/05/2026HVAC-R and service water piping design and insulationRAFAEL FIGUEROAenergy_progress
03/05/2026HVAC-R and service water heating system controlsRAFAEL FIGUEROAenergy_progress
03/05/2026HVAC-R and service water heating equipmentRAFAEL FIGUEROAenergy_progress
03/05/2026FinalRAFAEL FIGUEROAprogress
03/05/2026Mechanical SystemsRAFAEL FIGUEROAspecial
03/05/2026Tenant Protection Plan Compliance—special
03/05/2026Fire-Resistant Penetrations and JointsRAFAEL FIGUEROAspecial
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026M00982572-S1Request digital key ↗
08/18/2026M00982572-I1Request digital key ↗
08/18/2026M00982572-P4Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/19/2018123361352Open ↗
02/16/2018123361352Open ↗
▸BISWORK PERMIT APPLICATION1
05/01/2018123361352Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026M00982572-I1Open ↗
08/18/2026M00982572-P4Open ↗
08/18/2026M00982572-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026M00982572-I1Open ↗
08/24/2026M00982572-I1Open ↗
08/24/2026M00982572-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026M00982572-I1Open ↗
08/24/2026M00982572-I1Open ↗
08/24/2026M00982572-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/16/2018123361352Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/19/2018123361352Open ↗
02/16/2018123361352Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026M00982572-I1Open ↗
08/18/2026M00982572-P4Open ↗
08/18/2026M00982572-P3Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/16/2018123361352Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/16/2018123361352Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026M00982572-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/16/2018123361352Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
03/19/2018123361352Open ↗
▸BISEFILING COVER SHEET1
02/16/2018123361352Open ↗
▸BISADDITIONAL INFORMATION1
04/16/2018123361352Open ↗