← Back
Converted dwellings or rooming house
23 EAST 93 STREET
MANHATTAN · BIN 1047110
💬 Discuss this project
1892Year Built
5Stories
C5Building Class
R8BZoning
8,205 sfGross Floor Area
10Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: 23 E.93RD ST.CORPORATION · 2,567 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY707/08/2026
23 E.93RD ST.CORPORATION103/22/2026
23 E 93RD ST CORPORATION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC203/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES NY INCGeneral Contractor207/08/2026
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Signed Off (2)Violation (11)
05/07/2025
Violation issued (HPD, closed)
C
05/07/2025
Violation issued (HPD, closed)
C
05/07/2025
Violation issued (HPD, closed)
C
04/24/2024
Signed off — Alteration
M01015478-I1
04/22/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01015476-I1
03/07/2024
Permit issued — Supported Scaffold
M01015478-I1-SF
03/07/2024
Permit issued — Sidewalk Shed
M01015476-I1-SH
03/06/2024
Filed — Alteration
M01015478-I1
03/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01015476-I1
03/04/2024
Violation issued (ECB, closed)
Construction
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2024
Violation issued (ECB, closed)
Construction
03/24/2023
Violation issued (HPD, open)
B
03/24/2023
Violation issued (HPD, open)
C
03/24/2023
Violation issued (HPD, open)
B
03/24/2023
Violation issued (HPD, open)
B
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES NY INC03/07/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC03/07/2024
2 projects · most recent 06/07/2025
FiledStatusContractorScope
06/07/2025CompletePRUDENT ELECTRIC INC10 meters, 10 new_meters
03/07/2024Permit IssuedRICHARD NEU—
Nothing on file for this building.
Nothing on file for this building.