← Back
Walk-up apt, over six families with stores
151 EAST 82 STREET
MANHATTAN · BIN 1047612
💬 Discuss this project
1920Year Built
4Stories
C7Building Class
C1-8XZoning
4,180 sfGross Floor Area
8Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 151 EAST 82ND STREET, · 1,957 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 7 docs
Floor 17p · 1 filing · 18 docs
Cellar10p · 2 filings · 20 docs
Sub-Basement9p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LISA MANAGEMENT307/08/2026
KAJ NY CONSTRUCTION1107/08/2026
151 EAST 82ND STREET,503/22/2026
151 EAST 82 ST203/22/2026
151 E 82 ST103/22/2026
DUNNETT REALTY103/22/2026
PUNNETT REALTY103/22/2026
RM OPS LLC DBA THE SIMONE REST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JACOBSON SHINODA ARCHITECTS402/07/2024
BAZINI ENGINEERING, P.C.111/04/2020
GREEN DESIGN206/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RITE ONE EXPEDITING403/21/2026
ATLANTIC BUILDING SUPPLY INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAJ NY CONSTRUCTION INCGeneral Contractor807/08/2026
BRUCCOLINO INCGeneral Contractor407/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
ACE CHIMNEY & FIREPLACEGeneral Contractor107/08/2026
HIGHLAND PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACOBSON SHINODA ARCHITEC7884101/30/2023
BAZINI ENGINEERING, P.C.1808111/04/2020
Building Lifecycle
All (77)Filed (7)Permit Issued (8)Violation (46)Inspection (4)Special Inspection (12)
05/25/2026
Violation issued (HPD, open)
B
02/08/2026
Violation issued (HPD, closed)
C
02/08/2026
Violation issued (HPD, open)
C
02/08/2026
Violation issued (HPD, closed)
C
02/08/2026
Violation issued (HPD, open)
C
10/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/26/2024
Violation issued (HPD, open)
B
07/26/2024
Violation issued (HPD, closed)
C
07/26/2024
Violation issued (HPD, open)
B
07/26/2024
Violation issued (HPD, closed)
C
02/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/07/2024
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING FIXTURES AS PER PLANS.
M00813539-P2
02/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/26/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING FIXTURES AS PER PLANS.
M00813539-P1
07/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
07/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2023
Permit issued — Plumbing
M00813539-S1-PL
04/29/2023
Permit issued — General Construction
M00813539-I1-GC
04/03/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING FIXTURES AS PER PLANS.
M00813539-S1
02/07/2023
Permit issued — General Construction
M00813539-I1-GC
01/30/2023
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING FIXTURES AS PER PLANS.
M00813539-I1
01/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
PETER SHINODA
01/17/2023
Special inspection requirement — Interior lighting power
PETER SHINODA
01/17/2023
Special inspection requirement — Lighting controls
PETER SHINODA
01/17/2023
Special inspection requirement — Energy Code Compliance Inspections
PETER SHINODA
01/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER SHINODA
01/16/2023
Special inspection requirement — Final
PETER SHINODA
06/18/2021
Violation issued (HPD, closed)
B
06/18/2021
Violation issued (HPD, closed)
B
06/18/2021
Violation issued (HPD, closed)
B
06/18/2021
Violation issued (HPD, closed)
B
06/18/2021
Violation issued (HPD, closed)
B
06/18/2021
Violation issued (HPD, closed)
C
06/18/2021
Violation issued (HPD, closed)
A
06/18/2021
Violation issued (HPD, closed)
A
06/18/2021
Violation issued (HPD, closed)
B
06/18/2021
Violation issued (HPD, closed)
B
11/09/2020
Permit issued — Mechanical Systems
M00419382-I1-MS
11/04/2020
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AND NEW DOUBLE WALL EXTERIOR CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00419382-I1
10/26/2020
Special inspection requirement — Chimneys and vents
Joseph Bazini
10/26/2020
Special inspection requirement — Mechanical Systems
Joseph Bazini
10/26/2020
Special inspection requirement — Final
Joseph Bazini
09/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2020
Violation issued (ECB, closed)
Boilers
06/24/2020
Violation issued (ECB, closed)
Boilers
06/09/2020
Violation issued (HPD, closed)
A
06/09/2020
Violation issued (HPD, closed)
C
02/14/2020
Violation issued (HPD, closed)
C
02/14/2020
Violation issued (HPD, closed)
C
02/07/2020
Violation issued (HPD, closed)
C
02/07/2020
Violation issued (HPD, closed)
B
02/05/2020
Violation issued (HPD, open)
A
12/09/2019
Violation issued (HPD, closed)
A
11/19/2019
Violation issued (HPD, open)
B
11/19/2019
Violation issued (HPD, closed)
A
08/28/2019
Violation issued (HPD, closed)
C
08/28/2019
Violation issued (HPD, closed)
C
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHIGHLAND PLUMBING LLC05/05/2023
DOB NOWGeneral ConstructionPermit IssuedBRUCCOLINO INC04/29/2023
DOB NOWGeneral ConstructionPermit IssuedBRUCCOLINO INC02/07/2023
DOB NOWMechanical SystemsPermit IssuedACE CHIMNEY FIREPLACE11/09/2020
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC08/02/2018
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC08/02/2018
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC06/25/2018
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC06/25/2018
BISFPISSUEDFIRE COMMAND CO, INC01/22/2014
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO INC11/30/1999
1 project · most recent 11/04/2020
Others
FiledStatusContractorScope
11/04/2020Permit IssuedACE CHIMNEY & FIREPLACEOthers
1 project · most recent 02/07/2024
Gas Water/Sanitary
FiledStatusContractorScope
02/07/2024Permit IssuedHIGHLAND PLUMBING LLCGas, Water/Sanitary
3 projects · most recent 03/06/2023
General Wiring
FiledStatusContractorScope
03/06/2023Permit IssuedWCK ELECTRIC CORP.General Wiring
06/29/2020Permit IssuedL.J.F. & SONS ELECL CONTS—
06/23/2018Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
02/14/2024Tenant Protection Plan Compliance—special
02/01/2024Tenant Protection Plan Compliance—special
07/20/2023Tenant Protection Plan Compliance—special
01/30/2023Tenant Protection Plan CompliancePETER SHINODAspecial
01/17/2023Interior lighting powerPETER SHINODAenergy_progress
01/17/2023Lighting controlsPETER SHINODAenergy_progress
01/17/2023Energy Code Compliance InspectionsPETER SHINODAprogress
01/16/2023Fire-Resistant Penetrations and JointsPETER SHINODAspecial
01/16/2023FinalPETER SHINODAprogress
10/26/2020Chimneys and ventsJoseph Bazinispecial
10/26/2020Mechanical SystemsJoseph Bazinispecial
10/26/2020FinalJoseph Baziniprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/06/2026M00056013-I1Request digital key ↗
09/06/2026M00056014-I1Request digital key ↗
08/29/2026M00813539-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00419382-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/31/2015122534418Open ↗
01/08/2014121668310Open ↗
▸BISWORK PERMIT APPLICATION1
01/25/2014121668310Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/06/2026M00056013-I1Open ↗
08/29/2026M00813539-P1Open ↗
08/29/2026M00813539-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M00813539-I1Open ↗
09/01/2026M00813539-I1Open ↗
09/01/2026M00813539-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00813539-I1Open ↗
09/01/2026M00813539-I1Open ↗
08/25/2026M00419382-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/31/2015122534418Open ↗
01/25/2014121668310Open ↗
01/08/2014121668310Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/08/2014121668310Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00419382-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026M00813539-S1Open ↗
08/29/2026M00813539-I1Open ↗
08/29/2026M00813539-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/31/2015122534418Open ↗
01/08/2014121668310Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/31/2015122534418Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/31/2015122534418Open ↗
01/08/2014121668310Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
10/31/2015122534418Open ↗
01/08/2014121668310Open ↗