← Back
Elevator apt, fireproof without stores
242 EAST 80 STREET
MANHATTAN · BIN 1048516
💬 Discuss this project
1969Year Built
7Stories
D3Building Class
R8BZoning
17,424 sfGross Floor Area
39Units
Rent Stabilized24 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 242-4 EAST 80TH STREET ASSOCIATES · 4,103 sf lot · 4.25 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY407/08/2026
HALBOR REALTY504/09/2026
242-4 EAST 80TH STREET AS1303/22/2026
242-4 E 80TH ST ASSOCIATE103/22/2026
242 EAST 80TH ASSOCIATES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.111/19/2025
STRUCTURAL ENGINEERING BURO111/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLINTON COURTNEYElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
TAB RESTORATIONS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING BU5883111/04/2025
Building Lifecycle
All (83)Filed (2)Permit Issued (2)Signed Off (1)Facade (FISP) (15)Violation (60)Inspection (3)
08/23/2026
Violation issued (HPD, open)
C
06/12/2026
Cycle 10 facade report submitted
06/11/2026
Cycle 10 facade report signed — SAFE
06/05/2026
Cycle 10 facade inspection completed
06/03/2026
Signed off — Alteration
M01192905-I1
06/03/2026
Violation issued (HPD, closed)
C
06/03/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, open)
B
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, closed)
A
02/11/2026
Violation issued (HPD, closed)
B
01/07/2026
Violation issued (HPD, closed)
C
12/01/2025
Permit issued — General Construction
M01192905-I1-GC
11/20/2025
Permit issued — Sidewalk Shed
M01321623-I1-SH
11/19/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01321623-I1
11/04/2025
Filed — Alteration
M01192905-I1
10/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/24/2025
Violation issued (HPD, closed)
C
06/24/2025
Violation issued (HPD, closed)
A
07/26/2024
Violation issued (HPD, open)
C
07/26/2024
Violation issued (HPD, closed)
C
07/26/2024
Violation issued (HPD, closed)
B
07/26/2024
Violation issued (HPD, open)
C
07/26/2024
Violation issued (HPD, closed)
A
07/26/2024
Violation issued (HPD, closed)
C
07/01/2024
Violation issued (HPD, closed)
C
07/01/2024
Violation issued (HPD, closed)
C
07/01/2024
Violation issued (HPD, closed)
A
07/01/2024
Violation issued (HPD, closed)
A
06/24/2024
Violation issued (HPD, closed)
C
06/24/2024
Violation issued (HPD, closed)
C
06/15/2024
Violation issued (HPD, closed)
C
05/31/2024
Violation issued (HPD, closed)
B
05/31/2024
Violation issued (HPD, closed)
C
05/28/2024
Violation issued (HPD, closed)
C
05/28/2024
Violation issued (HPD, closed)
C
05/28/2024
Violation issued (HPD, closed)
B
05/22/2024
Violation issued (HPD, closed)
A
05/22/2024
Violation issued (HPD, closed)
A
05/22/2024
Violation issued (HPD, closed)
C
05/22/2024
Violation issued (HPD, closed)
C
05/22/2024
Violation issued (HPD, closed)
C
05/22/2024
Violation issued (HPD, closed)
C
08/29/2022
Cycle 9 facade report signed — SAFE
07/07/2022
Violation issued (ECB, closed)
Elevators
05/30/2022
Cycle 9 facade report submitted
05/20/2022
Violation issued (HPD, closed)
C
05/17/2022
Cycle 9 facade inspection completed
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTAB RESTORATIONS INC12/01/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP11/20/2025
BISBLISSUEDBENT MECHANICAL CORP09/24/2007
BISPLISSUEDBENT MECHANICAL CORP09/24/2007
BISBLISSUEDBENT MECHANICAL CORP03/13/2006
BISPLISSUEDBENT MECHANICAL CORP03/13/2006
1 project · most recent 12/04/2020
General Wiring
FiledStatusContractorScope
12/04/2020CompleteTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 11/19/2025
Sidewalk Shed
FiledStatusContractorScope
11/19/2025Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026M01192905-I1Request digital key ↗
08/20/2026M01321623-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026M01192905-I1Open ↗
08/20/2026M01321623-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist2
08/13/2026M01321623-I1Open ↗
08/13/2026M01192905-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026M01192905-I1Open ↗