← Back
Walk-up apt, over six families with stores
208 EAST 87 STREET
MANHATTAN · BIN 1048804
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R8BZoning
7,720 sfGross Floor Area
16Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 208 EAST 87TH STREET LLC · 2,517 sf lot · 3.07 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
208 EAST 87TH STREET LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WAYPOINT CONSULTING GROUP410/14/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VISHWADAT MATAPERSADElectrical203/21/2026
VAN VASSELLElectrical103/21/2026
NY KITCHEN & BATH USA CORGeneral Contractor107/08/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAYPOINT CONSULTING GROUP6175410/14/2021
GIOVANNI ZAPATA R.A.3882108/19/2020
Building Lifecycle
All (14)Filed (4)Permit Issued (2)Signed Off (2)Violation (6)
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
A
10/20/2021
Signed off — Alteration
1st FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 shower, relocate 1 kitchen sink. 2nd FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 tub. Install new electric washer/dryer
M00349774-I1
10/14/2021
Filed — Alteration
1st FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 shower, relocate 1 kitchen sink. 2nd FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 tub. Install new electric washer/dryer
M00349774-P4
09/16/2021
Signed off — Alteration
Create new framed opening for staircase connecting apartments 1R & 2R. Install new reinforcing flitch beam amid span of existing 2nd FL joists as per plans submitted herewith.No change to use, occupancy or egress.
M00349772-I1
04/01/2021
Violation issued (HPD, closed)
A
12/04/2020
Filed — Alteration
1st FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 shower, relocate 1 kitchen sink. 2nd FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 tub. Install new electric washer/dryer
M00349774-P3
10/20/2020
Permit issued — Plumbing
M00349774-I1-PL
10/06/2020
Filed — Alteration
1st FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 shower, relocate 1 kitchen sink. 2nd FL: Relocate 1 toilet, relocate 1 lavatory, relocate 1 tub. Install new electric washer/dryer
M00349774-I1
09/14/2020
Permit issued — Structural
M00349772-I1-ST
08/19/2020
Filed — Alteration
Create new framed opening for staircase connecting apartments 1R & 2R. Install new reinforcing flitch beam amid span of existing 2nd FL joists as per plans submitted herewith.No change to use, occupancy or egress.
M00349772-I1
10/09/2018
Violation issued (HPD, closed)
I
01/29/2014
Violation issued (HPD, open)
B
09/15/1998
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC10/20/2020
DOB NOWStructuralSigned-offNY KITCHEN & BATH USA COR09/14/2020
BISOTISSUEDNY KITCHEN & BATH USA COR07/30/2020
BISFBISSUEDROCKWAY FUEL OIL CORP10/11/2016
BISFBISSUEDROCKWAY FUEL OIL CORP08/18/1998
4 projects · most recent 05/13/2024
General Wiring
FiledStatusContractorScope
05/13/2024Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
11/05/2021CompletePAUL M. & SON'S ELECL CONGeneral Wiring
10/09/2020CompleteV. VASS ELECTRIC CORPGeneral Wiring
06/12/2018Permit IssuedAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/23/2020Fire-Resistant Penetrations and JointsAlejandro Molinaspecial
11/23/2020Post-installed AnchorsAlejandro Molinaspecial
11/23/2020Fire-Resistance Rated ConstructionAlejandro Molinaprogress
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
09/03/2026M00349774-P3Request digital key ↗
09/03/2026M00349774-I1Request digital key ↗
09/03/2026M00349774-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00349772-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
07/30/2020140903743Open ↗
10/06/2016140559134Open ↗
10/06/2016140559134Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00349774-P3Open ↗
09/03/2026M00349774-I1Open ↗
09/03/2026M00349774-P4Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00349774-P3Open ↗
09/01/2026M00349774-P3Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/17/2017140559134Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00349774-P3Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/06/2016140559134Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan4
09/03/2026M00349774-I1Open ↗
09/03/2026M00349774-P3Open ↗
09/03/2026M00349774-P4Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00349774-I1Open ↗
09/03/2026M00349774-P4Open ↗
09/03/2026M00349774-P3Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/26/2021140903743Open ↗
07/15/2020140903743Open ↗
05/18/2020140903743Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/26/2021140903743Open ↗
05/17/2017140559134Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸BISNYCECC ANALYSIS1
05/18/2020140903743Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/17/2017140559134Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/30/2020140903743Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/26/2021140903743Open ↗
10/26/2021140903743Open ↗
07/15/2020140903743Open ↗
Showing 3 of 7 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/30/2020140903743Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/30/2020140903743Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/27/2021140903743Open ↗
05/17/2017140559134Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/17/2017140559134Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/26/2021140903743Open ↗
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
05/18/2020140903743Open ↗
10/06/2016140559134Open ↗