← Back
Over six families without stores
304 EAST 91 STREET
MANHATTAN · BIN 1050199
💬 Discuss this project
1920Year Built
5Stories
C1Building Class
R8BZoning
8,715 sfGross Floor Area
12Units
Rent Stabilized39 Open Violations ▸
Over six families without stores · Owner of record: 304 E 91ST MGT, · 2,517 sf lot · 3.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OLD MASTER CONTRACTING807/08/2026
RELIABLE ENTERPRISES704/09/2026
304 E 91ST MGT,303/22/2026
TALC CONTRACTING103/22/2026
304 E 91ST ST MGT LLC103/22/2026
304 E 91ST STREET603/21/2026
304 EAST 91ST STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES204/16/2025
BANGASH ASSOCIATES INC.102/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN403/21/2026
OLD MASTER CONTRACTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OLD MASTER CONTRACTING COGeneral Contractor707/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor204/09/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488102/03/2025
Building Lifecycle
All (67)Filed (3)Permit Issued (5)Signed Off (2)Violation (52)Inspection (2)Special Inspection (3)
08/01/2026
Violation issued (HPD, open)
A
08/01/2026
Violation issued (HPD, open)
A
08/01/2026
Violation issued (HPD, open)
A
08/01/2026
Violation issued (HPD, open)
A
08/01/2026
Violation issued (HPD, open)
A
08/01/2026
Violation issued (HPD, open)
C
06/29/2026
Violation issued (HPD, open)
C
06/16/2026
Signed off — Alteration
M01135486-I1
03/17/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01211419-I1
03/12/2026
Permit issued — General Construction
M01135486-I1-GC
04/16/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01211419-I1
04/16/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01211415-I1
04/16/2025
Permit issued — Sidewalk Shed
M01211415-I1-SH
04/16/2025
Permit issued — Supported Scaffold
M01211419-I1-SF
03/24/2025
Permit issued — General Construction
M01135486-I1-GC
02/28/2025
Permit issued — General Construction
M01135486-I1-GC
02/03/2025
Filed — Alteration
M01135486-I1
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
10/31/2024
Special inspection requirement — Masonry
FAZAL BANGASH
10/31/2024
Special inspection requirement — Final
FAZAL BANGASH
01/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2022
Violation issued (ECB, closed)
Construction
11/17/2022
Violation issued (ECB, closed)
Construction
10/01/2015
Violation issued (HPD, closed)
I
07/20/2013
Violation issued (HPD, closed)
B
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2001
Violation issued (ECB, closed)
Construction
09/10/2001
Violation issued (ECB, closed)
Construction
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/17/1999
Violation issued (HPD, open)
B
06/19/1999
Violation issued (HPD, open)
A
06/19/1999
Violation issued (HPD, open)
B
06/19/1999
Violation issued (HPD, open)
B
06/19/1999
Violation issued (HPD, open)
B
06/19/1999
Violation issued (HPD, open)
B
06/19/1999
Violation issued (HPD, open)
B
06/19/1999
Violation issued (HPD, open)
A
11/21/1996
Violation issued (HPD, open)
C
09/16/1996
Violation issued (HPD, open)
B
09/16/1996
Violation issued (HPD, open)
C
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/1993
Violation issued (HPD, open)
B
12/17/1991
Violation issued (HPD, open)
C
12/17/1991
Violation issued (HPD, open)
B
04/24/1991
Violation issued (HPD, open)
B
12/06/1990
Violation issued (HPD, open)
C
09/17/1990
Violation issued (HPD, open)
B
09/17/1990
Violation issued (HPD, open)
B
05/23/1990
Violation issued (HPD, open)
B
05/23/1990
Violation issued (HPD, open)
B
08/05/1989
Violation issued (HPD, open)
B
07/07/1989
Violation issued (HPD, open)
C
07/07/1989
Violation issued (HPD, open)
B
07/07/1989
Violation issued (HPD, open)
B
07/07/1989
Violation issued (HPD, open)
A
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOLD MASTER CONTRACTING CO03/12/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC04/16/2025
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC04/16/2025
DOB NOWGeneral ConstructionSigned-offOLD MASTER CONTRACTING CO03/24/2025
DOB NOWGeneral ConstructionSigned-offOLD MASTER CONTRACTING CO02/28/2025
BISPLISSUEDTHE RIGHT CONNECTION P&H01/14/2003
BISBLISSUEDTHE RIGHT CONNECTION P&H01/10/2003
BIS—ISSUEDT A L C CONTRACTING CORP12/02/2002
BIS—ISSUEDT A L C CONTRACTING CORP08/10/2001
BISEQISSUEDSPRING SCAFFLODING INC03/27/2001
BISOTISSUEDT.A.L.C. CONTR. CORP.03/13/2001
1 project · most recent 04/16/2025
FiledStatusContractorScope
04/16/2025Permit IssuedRICHARD NEU—
1 project · most recent 04/16/2025
Sidewalk Shed
FiledStatusContractorScope
04/16/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/31/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
10/31/2024MasonryFAZAL BANGASHspecial
10/31/2024FinalFAZAL BANGASHprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026M01135486-I1Request digital key ↗
08/24/2026M01211415-I1Request digital key ↗
08/24/2026M01211419-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026M01211415-I1Open ↗
08/24/2026M01211419-I1Open ↗
08/13/2026M01135486-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M01135486-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M01135486-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01135486-I1Open ↗