← Back
Church, synagogue, chapel
2152 3 AVENUE
MANHATTAN · BIN 1052350
💬 Discuss this project
1910Year Built
4Stories
M1Building Class
C4-6Zoning
5,600 sfGross Floor Area
1Units
8 Open Violations 6 unresolved · 2 paperwork only ▸
Church, synagogue, chapel · Owner of record: GDSD REALTY LLC · 2,911 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction3p · 1 filing · 10 docs
1 job · most recent 06/10/2021
FiledStatusContractorScope
06/10/2021——133 heads
2 jobs · most recent 07/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/08/2026Permit IssuedSIDERIS PLBG & HTG CORPGas
06/10/2021——Water/Sanitary
Building Lifecycle
All (25)Filed (3)Permit Issued (1)Violation (11)Inspection (4)Special Inspection (6)
09/04/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/15/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/08/2026
Filed — Alteration
REGISTER HOT WATER HEATER AND ASSOCIATED GAS PIPING TO HEATING APPLIANCES AS PER PLANS. FILED IN CONJUNCTION WITH LAA# M01310202-I1-LA.NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01378467-P1
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
07/06/2026
Special inspection requirement — Maintenance information
Stephen Shishko
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
07/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/19/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/05/2026
Permit issued — Plumbing
M01378467-I1-PL
05/02/2026
Filed — Alteration
REGISTER HOT WATER HEATER AND ASSOCIATED GAS PIPING TO HEATING APPLIANCES AS PER PLANS. FILED IN CONJUNCTION WITH LAA# M01310202-I1-LA.NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01378467-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/02/2025
Violation issued (ECB, open)
Boilers
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2021
Filed — Alteration
INSTALLATION OF NEW 4" FIRE SPRINKLER WATER SERVICE, INSTALLATION OF NEW FIRE SPRINKLER WATER SYSTEM FOR ENTIRE BUILDING AND INSTALLATION OF BACKFLOW PREVENTER ASSEMBLIES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00532278-I1
06/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lee Kantor
06/02/2021
Special inspection requirement — Sprinkler Systems
Lee Kantor
04/26/2018
Violation issued (ECB, closed)
Construction
07/14/2017
Violation issued (ECB, open)
Construction
12/08/1988
Violation issued (ECB, closed)
Construction
01/25/1972
Violation issued (HPD, open)
A
01/25/1972
Violation issued (HPD, open)
A
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M A R CONSULTANTS COM107/05/2026
GDSD REALTY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC207/08/2026
LEE N KANTOR, PE106/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A E C PERMITS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIDERIS PLBG & HTG CORPPlumbing107/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746207/08/2026
LEE KANTOR, P.E.5988106/10/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIDERIS PLBG & HTG CORP05/05/2026
BISPLISSUEDFIVE STAR PLG. + HTG.11/12/1993
BISEQISSUEDGOLD SCAFFOLDING,INC.08/06/1993
BIS—ISSUEDSUPER SERVICES07/22/1993
BISEQISSUEDSUPER SERVICES07/21/1993
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/04/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/15/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/19/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/06/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/06/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
07/06/2026Maintenance informationStephen Shishkoenergy_progress
07/06/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
06/05/2021Fire-Resistant Penetrations and JointsLee Kantorspecial
06/02/2021Sprinkler SystemsLee Kantorspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/06/2026M01378467-I1Request digital key ↗
09/06/2026M01378467-P1Request digital key ↗
09/03/2026M00532278-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/06/2026M01378467-P1Open ↗
09/06/2026M01378467-I1Open ↗
08/13/2026M00532278-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026M01378467-P1Open ↗
08/29/2026M01378467-P1Open ↗
08/29/2026M01378467-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026M01378467-P1Open ↗
08/22/2026M00532278-I1Open ↗
08/22/2026M00532278-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/06/2026M01378467-I1Open ↗
09/06/2026M01378467-P1Open ↗
08/13/2026M00532278-I1Open ↗