Church, synagogue, chapel
2152 2 AVENUE
MANHATTAN · BIN 1052858
💬 Discuss this project
1920Year Built
1Stories
M1Building Class
R9AZoning
2,250 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: METRO NORTH ASSN INC · 2,500 sf lot · 0.9 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 1Under Construction5p · 1 filing · 6 docs
CellarUnder Construction4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KIERAN PATRICK SPILLANE106/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.C. INDUSTRIES, INCGeneral Contractor109/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106106/04/2026
Building Lifecycle
All (20)Filed (1)Permit Issued (1)Violation (6)Special Inspection (12)
09/11/2026
Permit issued — General Construction
M01302228-I1-GC-CX
06/04/2026
Filed — Alteration
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection. Install new reinforced concrete footings with new steel post between the cellar slab and first floor wood joist. Repoint joists and repair bricks on facade.
M01302228-I1
03/14/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Seismic Isolation Systems
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
03/14/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
10/14/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedC.A.C. INDUSTRIES, INC09/11/2026
1 project · most recent 06/04/2026
Steel Concrete
FiledStatusContractorScope
06/04/2026Permit IssuedC.A.C. INDUSTRIES, INCSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/14/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
03/14/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
03/14/2026Post-installed AnchorsGEORGE GHEBRYALspecial
03/14/2026Seismic Isolation SystemsGEORGE GHEBRYALspecial
03/14/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
03/14/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
03/14/2026Subgrade InspectionsGEORGE GHEBRYALspecial
03/14/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
03/14/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
03/14/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
10/14/2025FinalGEORGE GHEBRYALprogress
10/14/2025Footing and FoundationGEORGE GHEBRYALprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026M01302228-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026M01302228-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M01302228-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026M01302228-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026M01302228-I1Open ↗
▸Other Documents1
▸DOB NOWGeotechnical Peer Review Report (BC 1818)1
08/16/2026M01302228-I1Open ↗