← Back
Three families
7 WEST 121 STREET
MANHATTAN · BIN 1053360
💬 Discuss this project
1890Year Built
4Stories
C0Building Class
R7-2Zoning
4,613 sfGross Floor Area
3Units
Rent Stabilized11 Open Violations ▸
Three families · 2,119 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL DENIS ASSOCIATES209/07/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C JAMES PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL DENIS ASSOCIATES2472209/07/2021
Building Lifecycle
All (40)Filed (2)Permit Issued (1)Signed Off (1)Violation (29)Inspection (3)Special Inspection (4)
08/22/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
A
04/06/2026
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, open)
C
08/27/2025
Violation issued (HPD, open)
C
08/27/2025
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, closed)
A
08/27/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, open)
A
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, closed)
I
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
11/08/2021
Signed off — Alteration
OIL TO GAS, INSTALLED NEW GAS FIRED STEAM WEIL MCLAIN BOILER WITH HOT WATER COIL IN CELLAR. VENTING THRU EXISTING CHIMNEY, NEW BREACHING TO EXISTING CHIMNEY. ERECT NEW METER BAR AND RUN NEW GAS PIPING TO NEW BOILER.NO CHANGE IN USE,OR EGRESS
M00538442-I1
09/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
09/09/2021
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
09/07/2021
Filed — Alteration
OIL TO GAS, INSTALLED NEW GAS FIRED STEAM WEIL MCLAIN BOILER WITH HOT WATER COIL IN CELLAR. VENTING THRU EXISTING CHIMNEY, NEW BREACHING TO EXISTING CHIMNEY. ERECT NEW METER BAR AND RUN NEW GAS PIPING TO NEW BOILER.NO CHANGE IN USE,OR EGRESS
M00538442-P1
08/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
08/23/2021
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
08/02/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/28/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/23/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/19/2021
Permit issued — Plumbing
M00538442-I1-PL
07/15/2021
Filed — Alteration
OIL TO GAS, INSTALLED NEW GAS FIRED STEAM WEIL MCLAIN BOILER WITH HOT WATER COIL IN CELLAR. VENTING THRU EXISTING CHIMNEY, NEW BREACHING TO EXISTING CHIMNEY. ERECT NEW METER BAR AND RUN NEW GAS PIPING TO NEW BOILER.NO CHANGE IN USE,OR EGRESS
M00538442-I1
04/02/2021
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
11/09/2017
Violation issued (HPD, closed)
I
10/27/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
11/15/2005
Violation issued (HPD, closed)
B
03/03/2005
Violation issued (HPD, closed)
B
05/02/2001
Violation issued (HPD, closed)
A
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offC JAMES PLBG & HTG INC07/19/2021
BISBLISSUEDDUAL FUEL PLUMBING & HEATING01/10/1995
BISPLISSUEDC JAMES PLBG & HTG INC12/20/1993
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/02/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/23/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/09/2021Fire-Resistant Penetrations and JointsPAUL DENISspecial
09/09/2021Energy Code Compliance InspectionsPAUL DENISprogress
08/23/2021Fire-Resistant Penetrations and JointsPAUL DENISspecial
08/23/2021Energy Code Compliance InspectionsPAUL DENISprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00538442-I1Request digital key ↗
09/03/2026M00538442-P1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026M00538442-I1Open ↗
08/13/2026M00538442-P1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/03/2026M00538442-I1Open ↗
09/03/2026M00538442-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00538442-P1Open ↗
08/26/2026M00538442-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00538442-P1Open ↗
08/26/2026M00538442-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist2
08/13/2026M00538442-P1Open ↗
08/13/2026M00538442-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00538442-I1Open ↗
09/03/2026M00538442-P1Open ↗