Elevator apt, miscellaneous
2053 5 AVENUE
MANHATTAN · BIN 1054128
💬 Discuss this project
1910Year Built
7Stories
D9Building Class
R7-2Zoning
29,841 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized113 Open Violations 111 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator apt, miscellaneous · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 4,992 sf lot · 5.98 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARK CONTRACTING NY707/08/2026
NYC HOUSING PRESERVATION AND DEVELOPMENT203/22/2026
HPD 806503/22/2026
HOUSING PRESERVATION & DE1403/22/2026
HPD HOUSING PRESERVATION103/22/2026
NYCHPD 8203/22/2026
2 E 127 ST TENANTS ASSOCI103/22/2026
H.P.D 80103/22/2026
HPD203/22/2026
HPD THE CITY OF NEW YORK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRAD E. COHEN, PE101/28/2020
HAIDER ENGINEERING, P.E.112/27/2019
MCRB SERVICE CORP101/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PERMIT SERVICES203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARK CONTRACTING NY INCGeneral Contractor807/08/2026
CLARKE FITZROYElectrical103/21/2026
FITZROY CLARKEElectrical103/21/2026
HI-LIGHTS ELECTRIC LLCElectrical103/22/2026
BARRY KAPLOWITZElectrical103/21/2026
STEEL FAB NY INCElectrical103/21/2026
STOKES, ROYElectrical103/21/2026
J & Y ELECTRIC AND INTER*Electrical103/22/2026
Building Lifecycle
All (86)Filed (3)Permit Issued (6)Signed Off (2)Facade (FISP) (12)Violation (60)Special Inspection (3)
04/01/2024
Violation issued (HPD, closed)
A
01/31/2024
Cycle 9 facade report signed — SAFE
01/24/2024
Cycle 9 facade inspection completed
09/06/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00208341-I1
09/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF
M00009024-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, closed)
A
08/24/2022
Cycle 9 facade report submitted
02/15/2022
Violation issued (HPD, closed)
A
10/13/2021
Violation issued (ECB, closed)
Construction
09/30/2021
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
06/16/2020
Violation issued (ECB, closed)
Construction
03/12/2020
Permit issued — Supported Scaffold
M00208341-I1-SF
02/06/2020
Permit issued — Boiler Equipment
M00234534-I1-BE
01/28/2020
Filed — Alteration
REPLACE LOW PRESSURE BOILER AND OIL BURNER. NO CHANGE IN USE EGRESS, OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00234534-I1
01/23/2020
Permit issued — Sidewalk Shed
M00009024-I1-SH
12/31/2019
Permit issued — Supported Scaffold
M00208341-I1-SF
12/27/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00208341-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2019
Special inspection requirement — Maintenance information
Brad Cohen
09/24/2019
Special inspection requirement — HVAC and service water heating system controls
Brad Cohen
09/24/2019
Special inspection requirement — HVAC and service water heating equipment
Brad Cohen
07/25/2019
Violation issued (ECB, closed)
Elevators
05/09/2019
Violation issued (ECB, open)
Boilers
05/01/2019
Violation issued (ECB, open)
Boilers
04/28/2019
Cycle 8 facade report signed — SWARMP
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/20/2019
Cycle 8 facade report submitted
02/11/2019
Cycle 8 facade inspection completed
10/11/2018
Violation issued (ECB, closed)
Elevators
10/05/2018
Violation issued (HPD, closed)
I
07/06/2018
Permit issued — Sidewalk Shed
M00009024-I1-SH
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2018
Permit issued — Sidewalk Shed
M00009024-I1-SH
01/05/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF
M00009024-I1
11/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2017
Violation issued (ECB, closed)
Construction
05/15/2017
Violation issued (ECB, closed)
Construction
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2015
Violation issued (HPD, closed)
I
11/26/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/17/2013
Violation issued (ECB, closed)
Unknown
09/17/2013
Violation issued (ECB, closed)
Unknown
12/07/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/07/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/11/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
A
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
05/21/2010
Violation issued (HPD, open)
B
03/10/2010
Cycle 6 facade report submitted
03/10/2010
Cycle 6 facade report signed — SWARMP
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offMARK CONTRACTING NY INC03/12/2020
DOB NOWBoiler EquipmentPermit IssuedPACIFIC ENERGY CORP02/06/2020
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC01/23/2020
DOB NOWSupported ScaffoldSigned-offMARK CONTRACTING NY INC12/31/2019
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC07/06/2018
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC01/08/2018
BISEQISSUEDSHAMAS CONSTRUCION CO INC11/19/1998
BISOTISSUEDSHAMAS CONSTRUCION CO INC11/19/1998
BISOTISSUEDDISCOVERY ELECATOR CO08/06/1996
13 projects · most recent 11/11/2024
General Wiring
FiledStatusContractorScope
11/11/2024Permit IssuedDELTEX ELECTRICAL CONT. IGeneral Wiring
08/22/2023Permit IssuedDIFAZIO ELECTRIC NY, INCGeneral Wiring
02/07/2022CompleteAUJLA ELECTRIC CORP—
07/19/2021CompleteAUJLA ELECTRIC CORP—
02/04/2021CompleteJ & Y ELECTRIC AND INTER*—
03/04/2020CompleteJ & Y ELECTRIC AND INTER*General Wiring
01/09/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
11/25/2019Permit IssuedDELTEX ELECTRICAL CONT. IGeneral Wiring
11/02/2019CompleteHI-LIGHTS ELECTRIC LLC—
08/09/2018Permit IssuedDELTEX ELECTRICAL CONT. IGeneral Wiring
06/11/2018Permit IssuedJAMCOB ELECTRIC LLCGeneral Wiring
02/20/2018CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/05/2018Permit IssuedWCK ELECTRIC CORP.—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/24/2019Maintenance informationBrad Cohenenergy_progress
09/24/2019HVAC and service water heating system controls Brad Cohenenergy_progress
09/24/2019HVAC and service water heating equipment Brad Cohenenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00208341-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/06/2026M00009024-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026M00234534-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00234534-I1Open ↗
09/23/2026M00234534-I1Open ↗
09/23/2026M00234534-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/05/2026M00208341-I1Open ↗
09/05/2026M00234534-I1Open ↗
08/13/2026M00009024-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/05/2026M00208341-I1Open ↗
08/13/2026M00234534-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/05/2026M00234534-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/05/2026M00208341-I1Open ↗
08/13/2026M00234534-I1Open ↗
08/13/2026M00009024-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
09/05/2026M00208341-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
09/05/2026M00208341-I1Open ↗