Elevator apt, semi-fireproof with stores
Jamie's Place 2
101 EAST 119 STREET · BIN 1054361
💬 Discuss this project
1920Year Built
6Stories
D7Building Class
R10Zoning
37,260 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: JAMIE'S PLACE HOUSING DEVELOPMENT FUND C ORPORATION · 6,800 sf lot · 5.48 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 9 docs
BulkheadUnder Construction1p · 1 filing · 3 docs
3 jobs · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
10/19/2021CompleteCLAIRMONT ELEC'L CONTR'GGeneral Wiring
11/18/2019CompleteNASH ELECTRIC SERVICES IN—
1 job · most recent 08/14/2026
Sidewalk Shed
FiledStatusContractorScope
08/14/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 job · most recent 07/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2026Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold (SC)
Building Lifecycle
All (94)Filed (5)Permit Issued (5)Signed Off (2)Facade (FISP) (15)Violation (60)Special Inspection (7)
08/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01442079-I1
08/14/2026
Permit issued — Sidewalk Shed
M01442079-I1-SH
08/05/2026
Permit issued — General Construction
M01421988-I1-GC
08/03/2026
Permit issued — Suspended Scaffold
M01436015-I1-SC
07/30/2026
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01421988-I1
07/24/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01436015-I1
07/16/2026
Special inspection requirement — Post-installed Anchors
ALAN DUDLEY
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Marco Batista
07/16/2026
Special inspection requirement — Air barrier - visual inspection
Marco Batista
07/15/2026
Special inspection requirement — Masonry
ALAN DUDLEY
07/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALAN DUDLEY
06/24/2026
Special inspection requirement — Final
Marco Batista
04/29/2026
Violation issued (HPD, closed)
A
03/16/2026
Violation issued (ECB, open)
Elevators
03/02/2026
Violation issued (ECB, open)
Elevators
05/29/2024
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00263445-I1
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Cycle 9 facade report signed — SWARMP
02/21/2023
Cycle 9 facade report submitted
02/12/2023
Cycle 9 facade inspection completed
04/07/2022
Signed off — Alteration
PROPOSED BATHROOM AND KITCHEN FINISHE RENOVATION AT UNITS; 1A, 1B, 1C, 2A, 2B, 2C, 2D, 2E, 2F, 3A ,3B, 3C, 3D, 3E, 3F, 4A, 4B, 4C, 4D, 4E, 4F, 5A, 5B,5C, 5D, 5E, 5F, 6A, 6B, 6C, 6D, 6E, 6F. AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00500588-I1
02/15/2022
Violation issued (HPD, closed)
A
10/05/2021
Permit issued — General Construction
M00500588-I1-GC
06/07/2021
Filed — Alteration
PROPOSED BATHROOM AND KITCHEN FINISHE RENOVATION AT UNITS; 1A, 1B, 1C, 2A, 2B, 2C, 2D, 2E, 2F, 3A ,3B, 3C, 3D, 3E, 3F, 4A, 4B, 4C, 4D, 4E, 4F, 5A, 5B,5C, 5D, 5E, 5F, 6A, 6B, 6C, 6D, 6E, 6F. AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00500588-I1
04/08/2021
Special inspection requirement — Final
JOHN MEYER
04/01/2021
Violation issued (HPD, closed)
A
01/07/2021
Violation issued (HPD, closed)
C
01/07/2021
Violation issued (HPD, closed)
A
01/07/2021
Violation issued (HPD, closed)
B
01/07/2021
Violation issued (HPD, closed)
B
01/07/2021
Violation issued (HPD, closed)
B
07/13/2020
Violation issued (ECB, closed)
Construction
04/06/2020
Cycle 8 facade report signed — SAFE
02/21/2020
Cycle 8 facade report submitted
02/10/2020
Cycle 8 facade inspection completed
11/13/2019
Filed — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00263445-I1
11/13/2019
Permit issued — Sidewalk Shed
M00263445-I1-SH
02/19/2019
Violation issued (ECB, closed)
Local Law
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/02/2018
Violation issued (HPD, closed)
C
07/02/2018
Violation issued (HPD, closed)
C
12/06/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2016
Violation issued (HPD, closed)
B
01/03/2016
Violation issued (HPD, closed)
B
01/03/2016
Violation issued (HPD, closed)
B
01/03/2016
Violation issued (HPD, closed)
C
01/03/2016
Violation issued (HPD, closed)
B
01/03/2016
Violation issued (HPD, closed)
C
09/12/2013
Violation issued (HPD, closed)
B
09/12/2013
Violation issued (HPD, closed)
B
09/12/2013
Violation issued (HPD, closed)
B
12/11/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/20/2012
Cycle 7 facade report submitted
05/15/2012
Cycle 7 facade report submitted
05/10/2012
Cycle 7 facade report signed — SAFE
05/10/2012
Cycle 7 facade report signed — SWARMP
04/05/2012
Cycle 7 facade inspection completed
04/05/2012
Cycle 7 facade inspection completed
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REPUBLIC SCAFFOLD & HOIST CORP503/22/2026
JAMIE'S PLACE HOUSING DEVELOPMENT FUND C ORPORATION403/22/2026
METROPOLITAN REALTY103/22/2026
JAMIES PLACE 2 LLC103/22/2026
JAMES PLACE 11.LLC103/22/2026
U. PACA MANAGEMENT103/22/2026
UPACA HOUSING MGMT403/22/2026
U.P.A.C.A HOUSING203/22/2026
UPACA503/22/2026
UPACA NON PROFIT HOUSING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP108/14/2026
PVE ENGINEERING107/30/2026
EDG106/07/2021
PATUXENT ENGINEERING LLC111/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES103/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor303/21/2026
KINGS BAY CONSTRUCTION*General Contractor203/21/2026
PAUL OLSENElectrical103/21/2026
CLAIRMONT LONDONElectrical103/21/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor108/06/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor108/16/2026
MORRIS HELLERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARTRIDGE VENTURE ENGINEE7690107/30/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/14/2026
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORATION08/05/2026
DOB NOWSuspended ScaffoldPermit IssuedLAWRENCE EXTERIOR REST CO08/03/2026
DOB NOWGeneral ConstructionSigned-offKINGS BAY CONSTRUCTION*10/05/2021
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C11/13/2019
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION01/22/2020
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION08/19/2019
BISEQISSUEDREPUBLIC SCAFFOLD CORP02/29/2012
BISBLISSUEDEAST COAST PETROLEUM03/26/2004
BISPLISSUEDEAST COAST MECHANICAL LLC03/26/2004
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/16/2026Post-installed AnchorsALAN DUDLEYspecial
07/16/2026Energy Code Compliance InspectionsMarco Batistaprogress
07/16/2026Air barrier - visual inspectionMarco Batistaenergy_progress
07/15/2026MasonryALAN DUDLEYspecial
07/15/2026Tenant Protection Plan ComplianceALAN DUDLEYspecial
06/24/2026FinalMarco Batistaprogress
04/08/2021FinalJOHN MEYERprogress
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
09/03/2026M00500588-I1Request digital key ↗
08/16/2026M01436015-I1Request digital key ↗
08/16/2026M01421988-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00263445-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION10
08/13/2024103675952Open ↗
07/16/2024120987245Open ↗
04/30/2024120987245Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
08/19/2019140718089Open ↗
02/29/2012120987245Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/21/2020140718089Open ↗
02/21/2020140718089Open ↗
02/21/2020140718089Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/05/2026M00263445-I1Open ↗
09/03/2026M00500588-I1Open ↗
08/16/2026M01421988-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026M01421988-I1Open ↗
08/27/2026M01421988-I1Open ↗
08/27/2026M01421988-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026M01421988-I1Open ↗
08/27/2026M01421988-I1Open ↗
08/27/2026M01421988-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/08/2018140718089Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/08/2018140718089Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/29/2012120987245Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/08/2018140718089Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/29/2012120987245Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
10/31/2024103675952Open ↗
01/08/2018140718089Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
02/21/2020140718089Open ↗
08/16/2019140718089Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00500588-I1Open ↗
08/16/2026M01421988-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/29/2012120987245Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/21/2020140718089Open ↗
02/21/2020140718089Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/21/2020140718089Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/08/2018140718089Open ↗
▸BISNYCECC ANALYSIS1
01/08/2018140718089Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/08/2024103675952Open ↗
07/12/2024120987245Open ↗
04/30/2024120987245Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/01/2024103675952Open ↗
07/17/2024120987245Open ↗
02/21/2020140718089Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/03/2026M00500588-I1Open ↗
08/16/2026M01442079-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/29/2012120987245Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/21/2020140718089Open ↗
02/19/2020140718089Open ↗
01/08/2018140718089Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
02/21/2020140718089Open ↗
02/14/2020140718089Open ↗
▸BISEFILING COVER SHEET1
02/29/2012120987245Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/08/2018140718089Open ↗
▸BISADDITIONAL INFORMATION1
02/19/2020140718089Open ↗
▸Other Documents4
▸DOB NOWCalculations1
08/16/2026M01436015-I1Open ↗
▸DOB NOWDHCR Document1
09/03/2026M00500588-I1Open ↗
▸DOB NOWHPD - Completion Notice1
09/03/2026M00500588-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01436015-I1Open ↗