← Back
Walk-up apt, over six families with stores
1993 LEXINGTON AVENUE
MANHATTAN · BIN 1054384
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R7DZoning
9,474 sfGross Floor Area
10Units
Rent Stabilized38 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 1993 LEXINGTON · 2,178 sf lot · 4.35 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY407/08/2026
WEBER-FARHAT REALTY307/08/2026
1993 LEXINGTON403/22/2026
OWNER OF 1993 LEXINGTON A103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EOC-NY105/01/2024
MSM ENGINEERING SERVICES, PLLC103/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MMSR CONSULTING GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BENJAMIN DREBINElectrical203/21/2026
RICHARD NEUElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
R & S CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EOC-NY6548105/01/2024
MOHAMMAD AHEAD - PROFESSI9286105/01/2024
Building Lifecycle
All (70)Filed (2)Permit Issued (2)Signed Off (2)Violation (60)Special Inspection (4)
09/04/2024
Signed off — Alteration
M01040757-I1
08/09/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01025566-I1
06/10/2024
Permit issued — General Construction
M01040757-I1-GC
05/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2024
Filed — Alteration
M01040757-I1
04/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMMAD AHEAD
04/23/2024
Special inspection requirement — Masonry
David Merabyan
04/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
04/23/2024
Special inspection requirement — Final
David Merabyan
03/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01025566-I1
03/26/2024
Permit issued — Sidewalk Shed
M01025566-I1-SH
03/24/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2024
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, open)
B
09/13/2022
Violation issued (HPD, open)
C
09/13/2022
Violation issued (HPD, open)
C
09/03/2022
Violation issued (HPD, closed)
B
09/03/2022
Violation issued (HPD, closed)
C
09/03/2022
Violation issued (HPD, closed)
B
09/03/2022
Violation issued (HPD, open)
C
09/03/2022
Violation issued (HPD, open)
C
09/23/2021
Violation issued (HPD, closed)
A
09/23/2021
Violation issued (HPD, closed)
C
09/23/2021
Violation issued (HPD, closed)
C
09/23/2021
Violation issued (HPD, closed)
C
09/23/2021
Violation issued (HPD, closed)
C
09/23/2021
Violation issued (HPD, open)
C
04/01/2021
Violation issued (HPD, closed)
A
07/18/2017
Violation issued (HPD, closed)
C
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2013
Violation issued (HPD, closed)
B
01/07/2011
Violation issued (HPD, open)
C
09/07/2010
Violation issued (HPD, open)
B
09/07/2010
Violation issued (HPD, closed)
A
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2008
Violation issued (HPD, open)
C
12/13/2008
Violation issued (HPD, open)
B
12/13/2008
Violation issued (HPD, open)
A
12/08/2008
Violation issued (HPD, open)
A
12/08/2008
Violation issued (HPD, open)
A
12/08/2008
Violation issued (HPD, open)
B
12/08/2008
Violation issued (HPD, open)
A
12/08/2008
Violation issued (HPD, open)
B
12/08/2008
Violation issued (HPD, open)
A
12/08/2008
Violation issued (HPD, open)
B
12/08/2008
Violation issued (HPD, open)
B
04/18/2007
Violation issued (HPD, open)
B
06/15/2006
Violation issued (HPD, open)
A
03/01/2006
Violation issued (HPD, open)
B
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2005
Violation issued (HPD, open)
C
10/19/2004
Violation issued (HPD, open)
B
10/19/2004
Violation issued (HPD, open)
B
05/22/2004
Violation issued (HPD, open)
B
05/22/2004
Violation issued (HPD, open)
B
05/22/2004
Violation issued (HPD, open)
B
05/16/2004
Violation issued (ECB, closed)
Construction
04/28/2004
Violation issued (HPD, open)
A
04/28/2004
Violation issued (HPD, open)
B
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR & S CONSTRUCTION CORP06/10/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC03/26/2024
BISBLISSUEDHERCULES WELDING BOILER08/29/2001
2 projects · most recent 03/27/2024
FiledStatusContractorScope
03/27/2024CompleteRICHARD NEU—
09/11/2022Permit IssuedROBERT CHIMENTI12 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/23/2024Tenant Protection Plan ComplianceMOHAMMAD AHEADspecial
04/23/2024MasonryDavid Merabyanspecial
04/23/2024Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
04/23/2024FinalDavid Merabyanprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026M01025566-I1Request digital key ↗
08/27/2026M01040757-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01025566-I1Open ↗
08/13/2026M01040757-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026M01040757-I1Open ↗
08/28/2026M01040757-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M01040757-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01040757-I1Open ↗