← Back
Elevator apt, semi-fireproof without stores
106 WEST 113 STREET
MANHATTAN · BIN 1054989
💬 Discuss this project
1900Year Built
5Stories
D1Building Class
R7-2Zoning
30,750 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized33 Open Violations 27 unresolved · 6 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 113TH STREET PARTNERS L.P. · 8,074 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar4p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
113TH STREET PARTNERS L P103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING207/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRIME ZONE BUILDING CONSU9474207/22/2026
Building Lifecycle
All (16)Filed (2)Violation (7)Special Inspection (7)
07/22/2026
Filed — Alteration
PLUMBING WORK IN THE CELLAR ONLY TO RECTIFY ECB VIOLATION #39118870K, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
M01434068-I1
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHI WAI CHUNG
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
07/20/2026
Filed — Alteration
INTERIOR RENOVATION IN THE CELLAR ONLY IN EXISTING 5 STORY & CELLAR RESIDENTIAL BUILDING TO RECTIFY ECB VIOLATION #39118870K, AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
M01411634-I1
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHI WAI CHUNG
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
07/10/2024
Violation issued (ECB, open)
Construction
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/1995
Violation issued (DOB, closed)
V%-DOB VIOLATION
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Nothing on file for this building.
1 project · most recent 07/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/22/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/21/2026Energy Code Compliance InspectionsJICHEN SUNprogress
07/21/2026HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
07/21/2026HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
07/21/2026Tenant Protection Plan ComplianceCHI WAI CHUNGspecial
07/21/2026HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
06/03/2026Tenant Protection Plan ComplianceCHI WAI CHUNGspecial
06/03/2026Fire-Resistant Penetrations and JointsJICHEN SUNspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026M01411634-I1Request digital key ↗
08/16/2026M01434068-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01411634-I1Open ↗
09/01/2026M01411634-I1Open ↗
08/28/2026M01434068-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026M01411634-I1Open ↗
08/16/2026M01434068-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026M01434068-I1Open ↗
08/28/2026M01434068-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026M01411634-I1Open ↗
08/16/2026M01434068-I1Open ↗