← Back
Three families
272 WEST 113 STREET
MANHATTAN · BIN 1055123
💬 Discuss this project
1890Year Built
3Stories
C0Building Class
R7AZoning
4,920 sfGross Floor Area
3Units
Rent Stabilized24 Open Violations 23 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 1,817 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
MechanicalFire Protection
Floor 31p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 12p · 2 filings · 17 docs
Cellar1p · 1 filing · 13 docs
1 job · most recent 04/22/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2021——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZ-A12NA 12,000 BTU · Vrf Indoor ×7
MSZ-A09NA 9,000 BTU · Vrf Indoor ×2
PUHZ-BP-100 102,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric MSZ-A12NA 12,000 BTU · Vrf Indoor ×7
MSZ-A09NA 9,000 BTU · Vrf Indoor ×2
PUHZ-BP-100 102,000 BTU · Vrf Outdoor ×1
2 jobs · most recent 03/16/2022
General Wiring
FiledStatusContractorScope
03/16/2022Permit IssuedHECMAR ELECTRIC4 new_meters
03/12/2022CancelledHECMAR ELECTRICGeneral Wiring
Building Lifecycle
All (50)Filed (4)Permit Issued (2)Signed Off (1)Violation (28)Inspection (2)Objection (7)Special Inspection (6)
04/29/2026
Violation issued (HPD, open)
A
04/14/2026
Signed off — Alteration
SPRINKLER WORK AS PER PLANS. FURNISH AND INSTALLATION OF 59 SPRINKLER HEADS AND ALL ASSOCIATED PIPING AND ACCESSORIES. FURNISH AND INSTALLATION OF NEW BACK FLOW PREVENTION DEVICE FOR THE EXISTING 3" SPRINKLER SERVICE.
M00896719-I1
11/17/2025
Violation issued (HPD, open)
I
08/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2025
Special inspection requirement — Sprinkler Systems
Jafet Tavarez
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
07/24/2025
Objection resolved — Addressed
07/21/2025
Objection raised — Admin
07/08/2025
Filed — Alteration
SPRINKLER WORK AS PER PLANS. FURNISH AND INSTALLATION OF 59 SPRINKLER HEADS AND ALL ASSOCIATED PIPING AND ACCESSORIES. FURNISH AND INSTALLATION OF NEW BACK FLOW PREVENTION DEVICE FOR THE EXISTING 3" SPRINKLER SERVICE.
M00896719-P1
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
07/03/2025
Special inspection requirement — Sprinkler Systems
Jafet Tavarez
06/04/2025
Violation issued (HPD, open)
A
02/07/2025
Violation issued (ECB, open)
Construction
01/15/2025
Permit issued — Sprinklers
M00896719-I1-EW-SP
11/22/2024
Violation issued (HPD, open)
I
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
10/06/2023
Permit issued — Sprinklers
M00896719-I1-EW-SP
07/18/2023
Filed — Alteration
SPRINKLER WORK AS PER PLANS. FURNISH AND INSTALLATION OF 59 SPRINKLER HEADS AND ALL ASSOCIATED PIPING AND ACCESSORIES. FURNISH AND INSTALLATION OF NEW BACK FLOW PREVENTION DEVICE FOR THE EXISTING 3" SPRINKLER SERVICE.
M00896719-I1
04/18/2023
Violation issued (ECB, open)
Construction
03/16/2023
Violation issued (HPD, open)
A
11/02/2022
Violation issued (HPD, open)
I
02/16/2022
Violation issued (HPD, open)
I
02/16/2022
Violation issued (HPD, open)
A
06/22/2021
Filed — Alteration
M00530589-I1
05/03/2021
Objection raised — Fire_Protection
05/03/2021
Objection raised — Inspections
05/03/2021
Objection raised — Energy
05/03/2021
Objection raised — Fire_Protection
05/03/2021
Objection raised — Scope
04/22/2021
Filed — Alteration
LEGALIZE EXISTING AC/HEATERS UNITS AT BASEMENT, 1ST, 2ND, & 3RD FLOOR. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
M00479187-I1
04/02/2021
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
I
03/22/2021
Special inspection requirement — Mechanical Systems
03/22/2021
Special inspection requirement — Final
10/25/2019
Violation issued (HPD, open)
I
10/10/2018
Violation issued (HPD, open)
I
11/06/2017
Violation issued (HPD, open)
I
10/26/2016
Violation issued (HPD, open)
I
10/02/2015
Violation issued (HPD, open)
I
02/03/2015
Violation issued (HPD, open)
I
09/27/2014
Violation issued (HPD, open)
B
06/14/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/20/2009
Violation issued (ECB, closed)
Construction
05/16/2008
Violation issued (ECB, closed)
Construction
07/10/1995
Violation issued (HPD, open)
B
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPITAL 2 CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JT ENGINEERING, PC207/08/2025
OCEAN ENTERPRISES INC.206/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STONECORE LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HECTOR MEJIAElectrical203/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JT ENGINEERING, PC7840207/08/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL01/15/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL10/06/2023
BIS—ISSUEDMBQ CONTRACTING CORP05/02/2023
BISPLISSUEDIPS PLUMBING CORP08/31/2021
BISPLISSUEDIPS PLUMBING CORP03/26/2020
BIS—ISSUEDMBQ CONTRACTING CORP10/16/2018
BIS—ISSUEDMBQ CONTRACTING CORP07/27/2018
BISPLISSUEDJUNIOR CARTER MECH. CORP05/28/2015
BISEQISSUEDCAPITAL 2 CONSTRUCTION &04/29/2015
BISOTISSUEDCAPITAL 2 CONSTRUCTION &04/28/2015
BIS—ISSUEDDM CONTRACTING & REST COR10/20/2014
BIS—ISSUEDBUILT RITE CONTRACTNG COR03/19/2012
BISPLISSUEDWATER WORKS PIPING INC02/13/2012
BIS—ISSUEDBUILT RITE CONTRACTNG COR12/13/2011
BIS—ISSUEDCONTRACTORS RESOURCE CEN06/07/2011
BISPLISSUEDEMPIRE PLUMBING INC10/25/2010
BISPLISSUEDEMPIRE PLUMBING INC08/06/2009
BIS—ISSUEDCONTRACTOR RES CENT CORP08/04/2009
BIS—ISSUEDALL TECH. ART02/10/2005
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/05/2025Sprinkler SystemsJafet Tavarezspecial
08/05/2025Fire-Resistant Penetrations and JointsJafet Tavarezspecial
07/03/2025Fire-Resistant Penetrations and JointsJafet Tavarezspecial
07/03/2025Sprinkler SystemsJafet Tavarezspecial
03/22/2021Mechanical Systems—special
03/22/2021Final—progress
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00530589-I1Contact architect ↗
08/23/2026M00896719-P1Contact architect ↗
08/23/2026M00896719-I1Contact architect ↗
Showing 3 of 4 on file for this type
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION21
12/21/2023140339621Open ↗
10/26/2023110149161Open ↗
08/17/2023110149161Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION17
05/02/2023110149161Open ↗
05/02/2023110149161Open ↗
03/27/2020110149161Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/09/2022110149161Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/17/2018122430093Open ↗
04/17/2018110149161Open ↗
06/16/2015122430093Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00479187-I1Open ↗
09/03/2026M00530589-I1Open ↗
08/23/2026M00896719-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M00896719-P1Open ↗
08/29/2026M00896719-P1Open ↗
08/22/2026M00896719-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
11/29/2007110038192Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/27/2015140339621Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/27/2015140339621Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/27/2015140339621Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING6
10/26/2023110149161Open ↗
04/01/2022110149161Open ↗
07/08/2021110149161Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/23/2019110149161Open ↗
06/01/2018110149161Open ↗
11/03/2016110149161Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/16/2015122430093Open ↗
▸Safety & Tenant Protection6
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist4
08/15/2026M00479187-I1Open ↗
08/13/2026M00896719-I1Open ↗
08/13/2026M00896719-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/27/2015140339621Open ↗
▸BISST-1 Street Tree Checklist1
05/07/2009110149161Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00530589-I1Open ↗
08/23/2026M00896719-P1Open ↗
08/23/2026M00896719-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/16/2015122430093Open ↗
04/27/2015140339621Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/02/2008110149161Open ↗
11/29/2007110038192Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/29/2022140339621Open ↗
03/29/2022140339621Open ↗
04/27/2015140339621Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/17/2018122430093Open ↗
11/17/2016122430093Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/27/2015140339621Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/29/2022140339621Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/29/2022140339621Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/29/2022140339621Open ↗
04/27/2015140339621Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/29/2022140339621Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS3
06/16/2015122430093Open ↗
05/02/2008110149161Open ↗
11/29/2007110038192Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/21/2023140339621Open ↗
03/27/2020110149161Open ↗
02/15/2012110149161Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
10/26/2023110149161Open ↗
08/17/2023110149161Open ↗
05/02/2008110149161Open ↗
▸BISSUPERSEDING LETTER2
07/30/2018110149161Open ↗
10/27/2014110149161Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
06/16/2015122430093Open ↗
04/27/2015140339621Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/29/2022140339621Open ↗
▸Filing & Intake Forms10
▸BISBOROUGH INTAKE FORM4
03/27/2020110149161Open ↗
10/23/2019110149161Open ↗
04/17/2018122430093Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
06/09/2023110149161Open ↗
01/10/2020110149161Open ↗
06/19/2018122430093Open ↗
▸BISEFILING COVER SHEET2
06/16/2015122430093Open ↗
05/02/2008110149161Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/27/2015140339621Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/04/2015110149161Open ↗
05/07/2009110149161Open ↗