← Back
Primarily 5-6 family with 1 store or office
224 WEST 135 STREET
MANHATTAN · BIN 1058865
💬 Discuss this project
1910Year Built
3Stories
S5Building Class
R7-2Zoning
2,847 sfGross Floor Area
7Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Primarily 5-6 family with 1 store or office · 1,840 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitectureOther
Cellar1p · 1 filing · 14 docs
Basement1p · 1 filing · 14 docs
Sub-Basement2p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ENGINEERING PLLC309/15/2025
PAUL CHRISTAKOS ARCHITECTURE104/24/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C JAMES PLBG & HTG INCPlumbing203/22/2026
RAYMOND WILSONElectrical103/21/2026
MX REMODELING INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137209/12/2024
Building Lifecycle
All (28)Filed (4)Permit Issued (1)Violation (14)Inspection (2)Objection (7)
05/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2025
Violation issued (HPD, closed)
I
10/06/2025
Objection raised — Other
10/06/2025
Objection raised — Cost
09/24/2025
Objection raised — Admin
09/15/2025
Filed — Alteration
STRUCTURAL WORK FOR NEW STOREFRONT, NEW HEADER FOR REAR YARD DOOR ACCESS. LEVELING OF BASEMENT FLOOR
M01023013-S4
09/03/2025
Filed — Alteration
STRUCTURAL WORK FOR NEW STOREFRONT, NEW HEADER FOR REAR YARD DOOR ACCESS. LEVELING OF BASEMENT FLOOR
M01023013-S3
06/23/2025
Permit issued — General Construction
M01023013-I1-GC
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
09/12/2024
Filed — Alteration
STRUCTURAL WORK FOR NEW STOREFRONT, NEW HEADER FOR REAR YARD DOOR ACCESS. LEVELING OF BASEMENT FLOOR
M01023013-S1
07/08/2024
Objection raised — Scope
07/08/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
05/02/2024
Objection raised — Other
04/24/2024
Filed — Alteration
STRUCTURAL WORK FOR NEW STOREFRONT, NEW HEADER FOR REAR YARD DOOR ACCESS. LEVELING OF BASEMENT FLOOR
M01023013-I1
04/02/2024
Violation issued (HPD, closed)
A
03/16/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (ECB, open)
Construction
04/02/2021
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
10/27/2016
Violation issued (HPD, closed)
I
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMX REMODELING INC06/23/2025
BISPLISSUEDMARATHON MECHANICAL LLC08/01/2001
BISOTISSUEDCOMFORT CONTROL PLBG08/01/2001
1 project · most recent 11/06/2025
General Wiring
FiledStatusContractorScope
11/06/2025Permit IssuedEVS ELECTRIC CORPGeneral Wiring
1 project · most recent 09/15/2025
Steel Wood
FiledStatusContractorScope
09/15/2025Permit IssuedMX REMODELING INCSteel, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/05/2025Concrete - Cast-In-Place—special
08/05/2025Excavations - Sheeting, Shoring, and Bracing—special
08/05/2025Subgrade Inspections—special
08/05/2025Subsurface Conditions – Fill Placement & In-Place Density—special
08/05/2025Underpinning—special
08/05/2025Underpinning and alternate methods of support of buildings and adjacent property—special
08/05/2025Final—progress
08/05/2025Footing and Foundation—progress
08/05/2025Concrete - Cast-In-Place—special
08/05/2025Subgrade Inspections—special
08/05/2025Final—progress
08/05/2025Footing and Foundation—progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026M01023013-S3Request digital key ↗
08/21/2026M01023013-S4Request digital key ↗
08/21/2026M01023013-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M01023013-S4Open ↗
08/13/2026M01023013-I1Open ↗
08/13/2026M01023013-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist2
08/13/2026M01023013-I1Open ↗
08/13/2026M01023013-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M01023013-I1Open ↗
08/13/2026M01023013-S3Open ↗
08/13/2026M01023013-S4Open ↗
Showing 3 of 4 on file for this type