← Back
Four families
307 WEST 121 STREET
MANHATTAN · BIN 1059195
💬 Discuss this project
1930Year Built
4Stories
C3Building Class
R7AZoning
7,893 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Four families · 2,523 sf lot · 3.13 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LPE ENGINEERING, PC107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FINELLI, NICOLAElectrical103/21/2026
SIERRA, HERIBERTOElectrical103/21/2026
HAPPY LIVING DEVELOPMENTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROYAL CONSTRUCTION P.E. S462107/14/2021
Building Lifecycle
All (17)Filed (1)Permit Issued (1)Signed Off (1)Violation (11)Special Inspection (3)
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/16/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
01/06/2022
Signed off — Alteration
Filed herewith application for removal/replacement and reinforcement of cracked brick masonry. There is no proposed change in Occupancy, Use, or Egress.
M00550866-I1
09/02/2021
Permit issued — General Construction
M00550866-I1-GC
07/14/2021
Filed — Alteration
Filed herewith application for removal/replacement and reinforcement of cracked brick masonry. There is no proposed change in Occupancy, Use, or Egress.
M00550866-I1
07/01/2021
Special inspection requirement — Masonry
EBRAHIM MIANDOABI
07/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
EBRAHIM MIANDOABI
07/01/2021
Special inspection requirement — Final
EBRAHIM MIANDOABI
04/02/2021
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
05/20/2007
Violation issued (HPD, open)
B
05/20/2007
Violation issued (HPD, open)
B
09/25/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHAPPY LIVING DEVELOPMENT09/02/2021
BISPLISSUEDBEST PLUMBING & HVAC INC09/30/2003
BISOTISSUEDTHE EDGE DESIGN GROUP INC.09/16/2003
BISOTISSUEDD/B/A09/18/1992
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/01/2021MasonryEBRAHIM MIANDOABIspecial
07/01/2021Structural Stability – Alterations of existing buildingsEBRAHIM MIANDOABIspecial
07/01/2021FinalEBRAHIM MIANDOABIprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/03/2026M00550866-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026M00550866-I1Open ↗
08/29/2026M00550866-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00550866-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026M00550866-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00550866-I1Open ↗