← Back
Walk-up cooperative
513 WEST 135 STREET
MANHATTAN · BIN 1059790
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R7AZoning
13,170 sfGross Floor Area
20Units
Rent Stabilized45 Open Violations 44 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: 513-517 W 135TH ST HO · 3,997 sf lot · 3.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING703/22/2026
RIAN PAINTING AND DECORATING INC503/22/2026
513-517 W 135TH ST HO103/22/2026
513-517 WEST 135 HO103/22/2026
513-517 W 135 ST H D F C203/21/2026
513-517 WEST 135TH ST HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.103/01/2024
ASR ENGINEERING PC108/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
SHEIKH EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor603/21/2026
TOPLINE NYC INCGeneral Contractor603/21/2026
RIAN PAINTING AND DECORATGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488103/01/2024
Building Lifecycle
All (75)Filed (2)Permit Issued (5)Signed Off (1)Violation (60)Inspection (3)Special Inspection (4)
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
A
07/17/2026
Violation issued (HPD, open)
A
07/17/2026
Violation issued (HPD, open)
B
12/04/2024
Signed off — Alteration
M00997853-I1
11/22/2024
Violation issued (HPD, closed)
I
10/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/20/2024
Violation issued (HPD, closed)
C
05/03/2024
Permit issued — Supported Scaffold
M00913052-I1-SF
05/02/2024
Permit issued — Sidewalk Shed
M00913052-I1-SH
03/20/2024
Permit issued — General Construction
M00997853-I1-GC
03/01/2024
Filed — Alteration
M00997853-I1
02/29/2024
Special inspection requirement — Masonry
FAZAL BANGASH
02/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAZAL BANGASH
02/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
01/29/2024
Special inspection requirement — Final
FAZAL BANGASH
08/03/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00913052-I1
08/03/2023
Permit issued — Supported Scaffold
M00913052-I1-SH
08/03/2023
Permit issued — Supported Scaffold
M00913052-I1-SF
03/27/2017
Violation issued (HPD, closed)
A
06/28/2016
Violation issued (HPD, closed)
A
06/28/2016
Violation issued (HPD, closed)
B
06/28/2016
Violation issued (HPD, closed)
B
06/28/2016
Violation issued (HPD, closed)
B
06/28/2016
Violation issued (HPD, closed)
B
06/23/2014
Violation issued (HPD, closed)
A
06/23/2014
Violation issued (HPD, closed)
A
06/23/2014
Violation issued (HPD, closed)
C
06/23/2014
Violation issued (HPD, closed)
C
08/03/2010
Violation issued (HPD, open)
B
08/03/2010
Violation issued (HPD, open)
B
08/03/2010
Violation issued (HPD, open)
B
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
A
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
12/09/2008
Violation issued (HPD, open)
B
10/29/2008
Violation issued (HPD, open)
B
10/29/2008
Violation issued (HPD, open)
B
10/29/2008
Violation issued (HPD, open)
B
10/29/2008
Violation issued (HPD, open)
A
10/29/2008
Violation issued (HPD, open)
B
10/29/2008
Violation issued (HPD, open)
B
10/29/2008
Violation issued (HPD, open)
B
08/11/2008
Violation issued (HPD, closed)
A
08/11/2008
Violation issued (HPD, closed)
B
08/11/2008
Violation issued (HPD, closed)
A
08/11/2008
Violation issued (HPD, closed)
A
08/11/2008
Violation issued (HPD, closed)
B
08/11/2008
Violation issued (HPD, closed)
C
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC INC05/03/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC05/02/2024
DOB NOWGeneral ConstructionSigned-offRIAN PAINTING AND DECORAT03/20/2024
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING08/03/2023
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING08/03/2023
BISPLISSUEDIHOPE PLG & HTG CO INC03/16/1993
BISPLISSUEDIHOPE PLG AND HTG CO INC02/01/1993
BISOTISSUEDJ.E. ACTIVITIES INC01/19/1993
2 projects · most recent 08/07/2023
FiledStatusContractorScope
08/07/2023Permit IssuedRICHARD NEU—
09/28/2020CompleteJ.H. APONTE ELECTRIC CORP24 meters, 1 new_meters
1 project · most recent 08/03/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/03/2023Permit IssuedTOPLINE NYC INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/29/2024MasonryFAZAL BANGASHspecial
02/29/2024Structural Stability – Alterations of existing buildingsFAZAL BANGASHspecial
02/29/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
01/29/2024FinalFAZAL BANGASHprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/29/2026M00913052-I1Request digital key ↗
08/27/2026M00997853-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026M00997853-I1Open ↗
08/13/2026M00913052-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/21/2026M00997853-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/21/2026M00997853-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026M00997853-I1Open ↗