← Back
Elevator apt, semi-fireproof without stores
400 WEST 150 STREET
MANHATTAN · BIN 1061154
💬 Discuss this project
1909Year Built
6Stories
D1Building Class
R8AZoning
45,234 sfGross Floor Area
30Units
LL97 CoveredRent Stabilized65 Open Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: 150TH STREET HOLDING CO LLC · 9,992 sf lot · 4.53 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 1 filing · 4 docs
Floor 1
4 jobs · most recent 09/09/2020
General Wiring
FiledStatusContractorScope
09/09/2020CompleteOM ELECTRIC, INC—
08/19/2020CancelledOM ELECTRIC, INC—
06/30/2020CompleteOM ELECTRIC, INCGeneral Wiring
02/08/2020Permit IssuedWCK ELECTRIC CORP.—
Building Lifecycle
All (86)Filed (3)Permit Issued (5)Signed Off (2)Facade (FISP) (15)Violation (60)Inspection (1)
08/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/21/2026
Permit issued — General Construction
M01347032-I1-GC
05/07/2026
Filed — Alteration
M01347032-I1
06/17/2025
Violation issued (HPD, closed)
B
06/17/2025
Violation issued (HPD, closed)
B
06/17/2025
Violation issued (HPD, closed)
B
06/17/2025
Violation issued (HPD, closed)
B
04/26/2025
Violation issued (HPD, closed)
B
04/26/2025
Violation issued (HPD, closed)
B
04/26/2025
Violation issued (HPD, closed)
B
04/26/2025
Violation issued (HPD, open)
B
04/26/2025
Violation issued (HPD, closed)
B
04/26/2025
Violation issued (HPD, closed)
B
04/26/2025
Violation issued (HPD, open)
B
04/26/2025
Violation issued (HPD, open)
B
07/25/2024
Cycle 9 facade report signed — SWARMP
04/29/2024
Signed off — Alteration
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00506785-I1
02/21/2024
Cycle 9 facade report submitted
02/05/2024
Cycle 9 facade inspection completed
08/17/2023
Signed off — Alteration
M00307419-I1
08/03/2022
Violation issued (ECB, closed)
Construction
07/14/2022
Cycle 8 facade report signed — SWARMP
06/03/2022
Cycle 8 facade report submitted
05/04/2022
Cycle 8 facade inspection completed
03/26/2022
Permit issued — Sidewalk Shed
M00307419-I1-SH
09/24/2021
Violation issued (ECB, closed)
Construction
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
A
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
C
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
A
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
A
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, open)
B
07/29/2021
Violation issued (HPD, closed)
B
07/29/2021
Violation issued (HPD, closed)
B
07/26/2021
Violation issued (ECB, closed)
Construction
04/27/2021
Filed — Alteration
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00506785-I1
04/27/2021
Permit issued — Supported Scaffold
M00506785-I1-SF
03/05/2021
Permit issued — Sidewalk Shed
M00307419-I1-SH
08/17/2020
Violation issued (ECB, closed)
Construction
08/17/2020
Violation issued (ECB, closed)
Construction
08/17/2020
Violation issued (ECB, closed)
Site Safety
08/17/2020
Violation issued (ECB, closed)
Construction
08/17/2020
Violation issued (ECB, closed)
Construction
08/17/2020
Violation issued (ECB, closed)
Unknown
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL G CONTRACTING1107/08/2026
150TH STREET HOLDING1203/22/2026
ZORIA CONSTRUCTION NY403/22/2026
150 STREET HOLDING CO LLC203/22/2026
L & F REALTY203/22/2026
ALFRED S FRIED MNGT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING105/07/2026
ASHRAF CORP204/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUAN MOLINAElectrical503/21/2026
GUL & G CONTRACTING INCGeneral Contractor507/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor107/08/2026
ZORIA CONSTRUCTION NY INC.General Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481105/07/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZORIA CONSTRUCTION NY INC.05/21/2026
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN03/26/2022
DOB NOWSupported ScaffoldSigned-offGUL & G CONTRACTING INC04/27/2021
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC03/05/2021
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC02/07/2020
BISOTISSUEDZORIA CONSTRUCTION NY INC.02/16/2022
BISOTISSUEDZORIA CONSTRUCTION NY INC.02/16/2021
BISOTISSUEDZORIA CONSTRUCTION NY INC.07/02/2020
BISFBISSUEDMARLANDE HEATING CORP10/10/1990
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/03/2026M00506785-I1Request digital key ↗
08/17/2026M01347032-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00307419-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
08/15/2019140864116Open ↗
▸BISWORK PERMIT APPLICATION1
08/15/2019140864116Open ↗
▸DOB NOWLPC Approval/Permit1
08/17/2026M01347032-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/05/2026M00307419-I1Open ↗
08/17/2026M01347032-I1Open ↗
08/13/2026M00506785-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/15/2019140864116Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/15/2019140864116Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/15/2019140864116Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/08/2019140864116Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
08/15/2019140864116Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00307419-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/15/2019140864116Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026M01347032-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/15/2019140864116Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/15/2019140864116Open ↗
▸BISNYCECC ANALYSIS1
08/15/2019140864116Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/15/2019140864116Open ↗
08/15/2019140864116Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLANDMARKS APPROVAL1
08/15/2019140864116Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/15/2019140864116Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/15/2019140864116Open ↗