← Back
Three families
481 WEST 145 STREET
MANHATTAN · BIN 1061340
💬 Discuss this project
1926Year Built
3Stories
C0Building Class
R6AZoning
3,666 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 4,163 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 14p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JJS BUILDERS607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC208/13/2026
GREEN DESIGN111/27/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC BUILDING CONSULTANTS203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJS BUILDERSGeneral Contractor607/08/2026
DMA CONTRACTING INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666208/13/2026
Building Lifecycle
All (31)Filed (3)Permit Issued (7)Signed Off (1)Violation (13)Special Inspection (7)
08/13/2026
Filed — Alteration
INSTALLATION OF MECHANICAL AIR HANDLER UNITS AND RELATED AIR COOLED CONDENSER AND PIPES AS SHOWN ON DRAWINGS. NO CHANGE IN OCCUPANCY USE OR EGRESS.
M00387318-P1
08/13/2026
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
08/13/2026
Special inspection requirement — Heating Systems
ALEKSANDR LEVIN
08/13/2026
Special inspection requirement — Final
ALEKSANDR LEVIN
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
ALEKSANDR LEVIN
08/13/2026
Special inspection requirement — HVAC insulation and sealing
ALEKSANDR LEVIN
08/13/2026
Special inspection requirement — HVAC and service water heating equipment
ALEKSANDR LEVIN
08/13/2026
Special inspection requirement — HVAC and service water heating system controls
ALEKSANDR LEVIN
05/13/2026
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00003074-I1
09/05/2024
Permit issued — Mechanical Systems
M00387318-I1-MS
03/16/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
08/09/2022
Permit issued — Mechanical Systems
M00387318-I1-MS
02/16/2022
Violation issued (HPD, closed)
A
06/08/2021
Permit issued — Mechanical Systems
M00387318-I1-MS
09/15/2020
Filed — Alteration
INSTALLATION OF MECHANICAL AIR HANDLER UNITS AND RELATED AIR COOLED CONDENSER AND PIPES AS SHOWN ON DRAWINGS. NO CHANGE IN OCCUPANCY USE OR EGRESS.
M00387318-I1
08/14/2018
Permit issued — Supported Scaffold
M00003074-I1-SF
04/03/2018
Permit issued — Supported Scaffold
M00003074-I1-SF
01/04/2018
Permit issued — Supported Scaffold
M00003074-I1-SF
11/28/2017
Permit issued — Supported Scaffold
M00003074-I1-SF
11/27/2017
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00003074-I1
10/27/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
06/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDMA CONTRACTING INC09/05/2024
DOB NOWMechanical SystemsPermit IssuedDMA CONTRACTING INC08/09/2022
DOB NOWMechanical SystemsPermit IssuedDMA CONTRACTING INC06/08/2021
DOB NOWSupported ScaffoldSigned-offJJS BUILDERS08/14/2018
DOB NOWSupported ScaffoldSigned-offJJS BUILDERS04/03/2018
DOB NOWSupported ScaffoldSigned-offJJS BUILDERS01/04/2018
DOB NOWSupported ScaffoldSigned-offJJS BUILDERS11/28/2017
BISOTISSUEDTOMASZ CONSTRUCTION CORP01/03/2006
BIS—ISSUEDGLEN ISLAND CONSTRUCTION CORP05/13/2003
BIS—ISSUEDCROSS CONSTRUCTION06/01/2000
BIS—ISSUEDCROSS CONSTRUCTION06/17/1999
1 project · most recent 08/13/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026Permit IssuedDMA CONTRACTING INCAir Conditioning Systems
Cooling
Mitsubishi Electric TPEFYP012MAI43A 12,000 BTU · Ahu ×10
TUMYHO361AK41 36,000 BTU · Condensing Unit ×5
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/13/2026Mechanical SystemsALEKSANDR LEVINspecial
08/13/2026Heating SystemsALEKSANDR LEVINspecial
08/13/2026FinalALEKSANDR LEVINprogress
08/13/2026Energy Code Compliance InspectionsALEKSANDR LEVINprogress
08/13/2026HVAC insulation and sealing ALEKSANDR LEVINenergy_progress
08/13/2026HVAC and service water heating equipment ALEKSANDR LEVINenergy_progress
08/13/2026HVAC and service water heating system controls ALEKSANDR LEVINenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00387318-P1Request digital key ↗
09/04/2026M00387318-I1Request digital key ↗
09/04/2026M00387318-P2Request digital key ↗
▸DOB NOWPlans/Sketch1
09/06/2026M00003074-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/06/2026M00003074-I1Open ↗
09/04/2026M00387318-P1Open ↗
09/04/2026M00387318-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026M00387318-I1Open ↗
08/30/2026M00387318-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026M00387318-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
09/04/2026M00387318-P2Open ↗
09/04/2026M00387318-P1Open ↗
08/13/2026M00387318-I1Open ↗