← Back
Condo, residential unit in 2-10 unit building
765 Saint Nicholas Condominium
765 ST NICHOLAS AVENUE · BIN 1061513
💬 Discuss this project
1895Year Built
4Stories
R1Building Class
R6AZoning
4,881 sfGross Floor Area
4Units
Rent Stabilized15 Open Violations ▸
Condo, residential unit in 2-10 unit building · 1,993 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 2 filings · 11 docs
Penthouse1p · 1 filing · 8 docs
Floor 31p · 2 filings · 13 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAMILITON 203K LLC1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BLD LAB ARCHITECTURE211/10/2023
NONE108/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LUCA FARINELLI103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A&H EXPRESS PLBG&HTG CORPPlumbing307/08/2026
ZORAN VUJICICElectrical103/21/2026
FIGURE GROUND INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLOCKWORK DESIGN BUILD LL8258208/22/2023
Building Lifecycle
All (58)Filed (3)Permit Issued (2)Signed Off (2)Violation (40)Inspection (3)Objection (2)Special Inspection (6)
11/17/2025
Violation issued (HPD, closed)
I
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
10/16/2024
Signed off — Alteration
Replace sink, dishwasher and gas range in kitchen, in place. Replace lavatory and wc in bathroom in existing location. Replcae existing tub with new shower.
M00885388-I1
10/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/26/2024
Signed off — Alteration
M00917171-I1
04/01/2024
Violation issued (HPD, closed)
A
03/04/2024
Permit issued — Plumbing
M00885388-I1-PL
03/01/2024
Permit issued — General Construction
M00917171-I1-GC
11/15/2023
Violation issued (HPD, closed)
I
11/10/2023
Filed — Alteration
Replace sink, dishwasher and gas range in kitchen, in place. Replace lavatory and wc in bathroom in existing location. Replcae existing tub with new shower.
M00885388-I1
08/30/2023
Objection raised — Scope
08/30/2023
Objection resolved — Addressed
08/22/2023
Filed — Alteration
M00917171-I1
08/22/2023
Filed — Alteration
Add steel reinforcement joists at living room ceiling per structural drawings. Roof will NOT be disturbed.
M00917182-I1
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Cummings
08/09/2023
Special inspection requirement — Final
Luca Farinelli
08/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
Luca Farinelli
08/09/2023
Special inspection requirement — Structural Steel - Details
Steven Cummings
08/09/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Steven Cummings
08/09/2023
Special inspection requirement — Final
Nathaniel Bergan
03/15/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
12/08/2014
Violation issued (HPD, closed)
B
06/16/2006
Violation issued (ECB, closed)
Construction
06/16/2006
Violation issued (ECB, closed)
Construction
01/30/2006
Violation issued (ECB, closed)
Construction
01/30/2006
Violation issued (ECB, closed)
Construction
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/1997
Violation issued (HPD, open)
A
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/1993
Violation issued (HPD, open)
C
07/21/1993
Violation issued (HPD, open)
C
07/21/1993
Violation issued (HPD, open)
C
07/21/1993
Violation issued (HPD, open)
C
07/21/1993
Violation issued (HPD, open)
C
07/21/1993
Violation issued (HPD, open)
C
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/1993
Violation issued (HPD, open)
C
03/01/1993
Violation issued (HPD, open)
C
03/01/1993
Violation issued (HPD, open)
C
03/01/1993
Violation issued (HPD, open)
C
03/01/1993
Violation issued (HPD, open)
C
04/21/1992
Violation issued (HPD, open)
C
04/21/1992
Violation issued (HPD, open)
C
02/10/1992
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP03/04/2024
DOB NOWGeneral ConstructionSigned-offFIGURE GROUND INC03/01/2024
BISPLRE-ISSUEDMERCON CONSTRUCTION CORP04/07/2006
BIS—ISSUEDLEMLE & WOLFF CONSTR CORP03/23/2006
BISEQISSUEDLEMLE & WOLFF CONSTR CORP03/22/2006
BISEQISSUEDLEMLE & WOLFF CONSTR CORP03/10/2006
BISEQISSUEDTRI BORO WATERPROOFING IN01/03/2006
BIS—ISSUEDAPARTMENT REHABILITATION CORP.12/20/2005
BISEQISSUEDTRI BORO WATERPROOFING IN11/21/2005
BISEQISSUEDLILLY CONSTRUCTION CO INC02/22/2002
BISEQISSUEDKING RAJA CONSTRUCTIONB01/28/2000
BISOTISSUEDKING RAJA CONSTRUCTIONB01/28/2000
1 project · most recent 03/05/2024
General Wiring
FiledStatusContractorScope
03/05/2024Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
1 project · most recent 08/22/2023
Steel
FiledStatusContractorScope
08/22/2023——Steel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/09/2023Fire-Resistant Penetrations and JointsSteven Cummingsspecial
08/09/2023FinalLuca Farinelliprogress
08/09/2023Fire-Resistance Rated ConstructionLuca Farinelliprogress
08/09/2023Structural Steel - DetailsSteven Cummingsspecial
08/09/2023Structural Steel - High Strength BoltingSteven Cummingsspecial
08/09/2023FinalNathaniel Berganprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026M00917171-I1Request digital key ↗
08/28/2026M00885388-I1Request digital key ↗
08/14/2026M00917182-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M00917171-I1Open ↗
08/13/2026M00885388-I1Open ↗
08/13/2026M00917182-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026M00917171-I1Open ↗
08/13/2026M00885388-I1Open ↗
08/13/2026M00917182-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M00917171-I1Open ↗
08/23/2026M00917182-I1Open ↗
08/23/2026M00917182-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M00917171-I1Open ↗
08/31/2026M00917171-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026M00917171-I1Open ↗
08/13/2026M00885388-I1Open ↗
08/13/2026M00917182-I1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M00885388-I1Open ↗
08/13/2026M00917171-I1Open ↗