← Back
Primarily 2 family with 1 store or office
1877 AMSTERDAM AVENUE
MANHATTAN · BIN 1061641
💬 Discuss this project
1926Year Built
3Stories
S2Building Class
R7AZoning
3,517 sfGross Floor Area
3Units
2 Open Violations ▸
Primarily 2 family with 1 store or office · Owner of record: 1877 AMSTERDAM ASSOC · 1,967 sf lot · 1.79 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMMAS203/21/2026
1877 AMSTERDAM ASSOCIATES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IVAN SHCHERBAKOV203/04/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMMAS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HECTOR MEJIAElectrical103/21/2026
Building Lifecycle
All (9)Filed (2)Violation (4)Special Inspection (3)
03/04/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01357046-S2
03/04/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01357046-I1
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/18/2026
Special inspection requirement — Final
02/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/01/1991
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDMETRO INCORPORATED02/05/2009
BISOTISSUEDMETRO P/H12/20/2007
BISPLISSUEDMETRO INCORPORATED06/13/2006
BISMHISSUEDMETRO P/H06/13/2006
1 project · most recent 03/04/2026
Water/Sanitary
FiledStatusContractorScope
03/04/2026——Water/Sanitary
1 project · most recent 02/12/2026
General Wiring
FiledStatusContractorScope
02/12/2026Permit IssuedHECMAR ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/03/2026Fire-Resistant Penetrations and Joints—special
02/18/2026Final—progress
02/07/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026M01357046-S2Request digital key ↗
08/18/2026M01357046-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026M01357046-S2Open ↗
08/13/2026M01357046-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01357046-S2Open ↗
08/13/2026M01357046-I1Open ↗