← Back
Elevator cooperative
540 WEST 146 STREET
MANHATTAN · BIN 1061952
💬 Discuss this project
1920Year Built
6Stories
D4Building Class
R7AZoning
31,430 sfGross Floor Area
35Units
LL97 CoveredRent Stabilized98 Open Violations 97 unresolved · 1 paperwork only ▸
Elevator cooperative · Owner of record: 540 W 146 ST-H D F C · 7,433 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction2p · 1 filing · 3 docs
Floor 3
Floor 21p · 1 filing · 3 docs
Floor 1
Cellar1p · 1 filing · 10 docs
1 job · most recent 04/25/2024
Gas
FiledStatusContractorScope
04/25/2024Signed-offC JAMES PLBG & HTG INCGas
2 jobs · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026Permit IssuedTRIPLE D ELECTRIC INCGeneral Wiring
07/17/2024Permit IssuedKOPP ELECTRIC CORPGeneral Wiring
1 job · most recent 09/15/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/15/2025Permit IssuedKC EXPEDITING INCTenant Protection Plan 72 Hour
Building Lifecycle
All (85)Filed (4)Permit Issued (3)Violation (60)Inspection (5)Objection (8)Special Inspection (5)
08/13/2026
Violation issued (HPD, open)
C
08/13/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (ECB, open)
Construction
04/29/2026
Violation issued (HPD, open)
A
11/24/2025
Permit issued — General Construction
M01287207-I1-GC
11/17/2025
Violation issued (HPD, open)
I
10/03/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
10/01/2025
Objection raised — Fire_Protection
10/01/2025
Objection raised — Scope
10/01/2025
Objection raised — Scope
10/01/2025
Objection raised — Cost
09/15/2025
Filed — Alteration
M01287207-I1
06/04/2025
Violation issued (HPD, open)
A
05/28/2025
Violation issued (ECB, closed)
Construction
05/23/2025
Violation issued (ECB, closed)
Construction
05/23/2025
Violation issued (ECB, closed)
Construction
05/23/2025
Violation issued (ECB, closed)
Construction
09/30/2024
Violation issued (HPD, open)
C
09/30/2024
Violation issued (HPD, open)
C
06/27/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/17/2024
Violation issued (ECB, open)
Construction
05/02/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/26/2024
Permit issued — General Construction
M01018342-S1-GC
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
04/26/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
04/25/2024
Filed — Alteration
REPLACING METER BARS AND PIPING TO EXISTING RANGES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00970294-P1
04/18/2024
Filed — Alteration
HEREWITH FILING FOR MINOR CARPENTRY WORK TO BE DONE AT APT #21 IN EXISTING MULTIPLE DWELLING. NEW FLOOR TILING AND PAINTING THROUGHOUT THE APT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01018342-S1
04/12/2024
Special inspection requirement — Final
DAVIDSON CHRISTMAS
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL DENIS
04/02/2024
Violation issued (HPD, open)
A
03/29/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/21/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/29/2023
Permit issued — Plumbing
M00970294-I1-PL
12/14/2023
Filed — Alteration
REPLACING METER BARS AND PIPING TO EXISTING RANGES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00970294-I1
11/15/2023
Violation issued (HPD, closed)
I
07/14/2023
Violation issued (HPD, open)
B
07/14/2023
Violation issued (HPD, open)
C
07/11/2023
Violation issued (HPD, open)
C
07/11/2023
Violation issued (HPD, open)
C
07/11/2023
Violation issued (HPD, open)
B
07/11/2023
Violation issued (HPD, open)
B
07/11/2023
Violation issued (HPD, open)
C
07/11/2023
Violation issued (HPD, open)
B
07/11/2023
Violation issued (HPD, open)
B
07/11/2023
Violation issued (HPD, open)
C
07/11/2023
Violation issued (HPD, open)
B
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/2023
Violation issued (HPD, closed)
C
04/17/2023
Violation issued (HPD, open)
B
04/17/2023
Violation issued (HPD, open)
C
04/17/2023
Violation issued (HPD, open)
C
Latest 60 of 85 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARC CONSULTING GROUP503/22/2026
UMDI403/22/2026
540 W 146 ST-H D F C803/22/2026
540 W 146 STREET HDFC603/22/2026
540 WEST 146TH STREET HDF103/22/2026
540 WEST 146 ST HDFC203/22/2026
H D F C 540 W 146 STREET103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS109/15/2025
PAUL DENIS ASSOCIATES204/25/2024
KDV DESIGNS ARCHITECTS LLC104/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & ASSOC.203/21/2026
ARCH-FORM DESIGN BUILD203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor303/21/2026
KC EXPEDITING INCGeneral Contractor104/09/2026
C JAMES PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL DENIS ASSOCIATES2472204/25/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKC EXPEDITING INC11/24/2025
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC04/26/2024
DOB NOWPlumbingSigned-offC JAMES PLBG & HTG INC12/29/2023
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/27/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/29/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/21/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/26/2024Fire-Resistant Penetrations and JointsPAUL DENISspecial
04/26/2024Energy Code Compliance InspectionsPAUL DENISprogress
04/12/2024FinalDAVIDSON CHRISTMASprogress
04/11/2024Fire-Resistant Penetrations and JointsPAUL DENISspecial
04/11/2024Energy Code Compliance InspectionsPAUL DENISprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026M00970294-P1Request digital key ↗
08/28/2026M00970294-I1Request digital key ↗
08/27/2026M01018342-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026M00970294-P1Open ↗
08/28/2026M00970294-I1Open ↗
08/27/2026M01018342-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01018342-S1Open ↗
08/27/2026M00970294-I1Open ↗
08/25/2026M00970294-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026M00970294-I1Open ↗
08/25/2026M00970294-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026M00970294-P1Open ↗
08/28/2026M00970294-I1Open ↗
08/13/2026M01287207-I1Open ↗