← Back
Walk-up apt, over six families with stores
1812 AMSTERDAM AVENUE
MANHATTAN · BIN 1062104
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7AZoning
9,777 sfGross Floor Area
10Units
Rent Stabilized57 Open Violations 55 unresolved · 2 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 1802 ASSOCIATES LIMITED PARTNERSHIP · 2,700 sf lot · 3.62 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar8p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORWAX ASSOCIATES1507/08/2026
1802 ASSOCIATES LIMITED PARTNERSHIP103/22/2026
1802 ASSOCIATES LTD PA203/22/2026
1802 ASSOC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.301/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARATHON MECHANICAL LLCPlumbing407/08/2026
ARISTON CHIMNEY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851201/10/2025
Building Lifecycle
All (82)Filed (3)Permit Issued (5)Signed Off (1)Violation (60)Inspection (6)Special Inspection (7)
06/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/11/2025
Signed off — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY.
M00462329-S1
01/17/2025
Permit issued — General Construction
M00462329-S1-GC
01/10/2025
Filed — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY.
M00462329-S1
10/30/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
10/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/30/2024
Special inspection requirement — Final
LOUIS ARENA
03/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/19/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/10/2023
Permit issued — Boiler Equipment
M00462329-I1-BE
05/10/2023
Permit issued — Plumbing
M00462490-I1-PL
01/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/19/2021
Violation issued (HPD, open)
B
12/19/2021
Violation issued (HPD, open)
B
12/10/2021
Violation issued (HPD, open)
B
12/10/2021
Violation issued (HPD, open)
B
12/10/2021
Violation issued (HPD, open)
B
12/10/2021
Violation issued (HPD, open)
B
11/29/2021
Violation issued (HPD, open)
B
11/29/2021
Violation issued (HPD, open)
B
11/29/2021
Violation issued (HPD, closed)
C
11/29/2021
Violation issued (HPD, open)
B
10/04/2021
Violation issued (HPD, open)
B
10/04/2021
Violation issued (HPD, closed)
C
10/04/2021
Violation issued (HPD, closed)
C
10/04/2021
Violation issued (HPD, open)
B
10/04/2021
Violation issued (HPD, closed)
C
07/02/2021
Violation issued (HPD, open)
B
07/02/2021
Violation issued (HPD, open)
C
05/07/2021
Permit issued — Boiler Equipment
M00462329-I1-BE
05/04/2021
Permit issued — Plumbing
M00462490-I1-PL
04/08/2021
Filed — Alteration
INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY.
M00462329-I1
04/08/2021
Filed — Alteration
M00462490-I1
01/28/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
01/28/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
01/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/26/2020
Violation issued (HPD, closed)
A
09/26/2020
Violation issued (HPD, closed)
A
02/11/2019
Violation issued (HPD, closed)
B
02/11/2019
Violation issued (HPD, closed)
B
02/05/2019
Violation issued (HPD, closed)
B
02/05/2019
Violation issued (HPD, open)
B
02/05/2019
Violation issued (HPD, closed)
A
02/05/2019
Violation issued (HPD, closed)
B
02/05/2019
Violation issued (HPD, closed)
C
02/05/2019
Violation issued (HPD, closed)
A
10/05/2018
Violation issued (HPD, closed)
I
05/04/2018
Violation issued (HPD, open)
B
05/04/2018
Violation issued (HPD, closed)
A
05/04/2018
Violation issued (HPD, closed)
A
05/04/2018
Violation issued (HPD, open)
C
05/04/2018
Violation issued (HPD, open)
B
05/04/2018
Violation issued (HPD, open)
B
05/04/2018
Violation issued (HPD, open)
B
05/04/2018
Violation issued (HPD, open)
B
05/04/2018
Violation issued (HPD, open)
B
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC01/17/2025
DOB NOWBoiler EquipmentPermit IssuedMARATHON MECHANICAL LLC05/10/2023
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC05/10/2023
DOB NOWBoiler EquipmentPermit IssuedMARATHON MECHANICAL LLC05/07/2021
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC05/04/2021
BISBLISSUEDT.M.J. PLUMBING & HEATING01/22/1991
BISPLISSUEDT.M.J. PLUMBING & HEATING01/22/1991
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/30/2024Chimneys and ventsLOUIS ARENAspecial
10/30/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/30/2024FinalLOUIS ARENAprogress
01/28/2021Heating SystemsLOUIS ARENAspecial
01/28/2021Maintenance informationLOUIS ARENAenergy_progress
01/28/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/28/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/25/2026M00462329-I1Request digital key ↗
08/15/2026M00462329-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00462490-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026M00462329-S1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00462490-I1Open ↗
08/25/2026M00462329-P2Open ↗
08/25/2026M00462329-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M00462329-I1Open ↗
08/31/2026M00462329-S1Open ↗
08/31/2026M00462329-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M00462329-I1Open ↗
08/31/2026M00462329-S1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026M00462329-S1Open ↗
▸Other Documents3
▸DOB NOWDHCR Document3
08/13/2026M00462329-I1Open ↗
08/13/2026M00462329-P2Open ↗
08/13/2026M00462490-I1Open ↗